Monaghan County Council wishes to tender for Regional and Former National Road Pavement Surfacing Works 2025 – Contract 2
Deadline
31 Mar
31 Mar 2025
Deadline
31 Mar
Tender for regional and former national road pavement surfacing works in Monaghan.
Tender for regional and former national road pavement surfacing works in Monaghan.
Bidder profile
Ideal for firms experienced in civil engineering and public procurement compliance.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Monaghan County Council |
| Title | Monaghan County Council wishes to tender for Regional and Former National Road Pavement Surfacing Works 2025 – Contract 2 |
| CPV / category | works / Construction & Civil Engineering |
| Estimated value | €not disclosed (eTenders placeholder) |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2025-03-31T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Monaghan County Council wishes to tender for Regional and Former National Road Pavement Surfacing Works 2025 – Contract 2. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Monaghan County Council.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering category[15] € 3,000,000 *CA Note: if stating a minimum yearly; ofessional Indemnity Insurance required for € [17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering category[15] € 3,000,000
- Insurance
- Public Liability — €6,500,000
- Employer's Liability — €13,000,000
- Professional Indemnity — €5,000.
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering category[15] € 3,000,000 *CA Note: if stating a minimum yearly; ofessional Indemnity Insurance required for € [17] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[19] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Etc | 25 | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2025-03-31T15:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): Cover Letter Contract 2.docx, Site Location Map R162.pdf
- eTenders CFT ID: not stated
- Clarification contact / portal: eTenders clarification portal
- Priority attachments: Cover Letter Contract 2.docx, Site Location Map R162.pdf, The Pricing Document must be submitted electronically to the etenders portal as a .xls
This tender has been awarded
- T. H. MOORE (CONTRACTS) LTD · 29 Apr 2025
- T. H. MOORE (CONTRACTS) LTD · 24 Apr 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€3,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€5,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Pavement surfacing works on regional and former national roads in County Monaghan.
Documents (68)
Cover Letter Contract 2.docx
89.0 KB · Contract / Agreement / Terms
001 Works Requirements Parts 1-3.docx
238.2 KB
002 Works Requirements Part 4 - Specification Final.docx
452.0 KB
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
48.1 KB
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
44.5 KB
Appendix 1 Form of Letters of Undertaking Declarations.docx
55.7 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
39.3 KB
avoidance_of_overhead_lines_poster.pdf
81.0 KB
Bby-Cls 2025 RI Site location Map.pdf
839.9 KB
Cmx-Cby 2025 RI Site location Map.pdf
776.2 KB
CoP_Avoiding_Danger_from_Underground_Services_.pdf
1.9 MB
COP_Confined_Space_Document.pdf
1.5 MB
CoP_ESB_overhead_lines.pdf
591.5 KB
Eir Info.pdf
554.6 KB
EIR R162 Ballybay to Monaghan.pdf
260.9 KB
Eir R183 Doapey.pdf
171.9 KB
Eir R183 Killygragy.pdf
108.5 KB
ESB Info Drummond Otra.pdf
9.1 MB
ESB Info R181-1 Creaghanroe.pdf
224.3 KB
esb_networks_avoidances_of_electrical_hazards_when_digging.pdf
1.5 MB
FTS-5-v2.7-09-01-2025.docx
93.5 KB
Gas Networks Info Drummond Otra.pdf
332.5 KB
HSF08 Contractor Competence Assessment Form.doc
220.5 KB
HSF09 Preliminary Health and Safety Plan.doc
543.0 KB
Information Booklet cover.docx
212.3 KB
Instructions to Tenderers Cover.docx
7.1 MB
ITT-W2-v3.0-18-11-24 (1).docx
75.1 KB
LP3445-3444 Clontibret ESB.pdf
24.3 MB
LP4921 ESB.pdf
19.5 MB
Mon MD 2025 RI Site location Map.pdf
128.5 KB
PW-CF5-v2.8-01-05-2024-1.pdf
1.2 MB
QW-Part-2-v1.1-18-11-2024.docx
58.4 KB
QW2-Part-1-v2.1-18-11-2024.docx
195.2 KB
QW2_Appendix J_Quarry Compliance Declaration (002).DOCX
35.4 KB
QW2_Supplement_3.5_Quarry Sources.DOC
40.0 KB
R162 Ballybay ESB.pdf
9.6 MB
R183 Doepey ESB.pdf
172.0 KB
R183 Killycraggy ESB.pdf
11.1 MB
R187 ESB.pdf
10.9 MB
R187 Water Mains.pdf
10.9 MB
Road Closure Publication Template.docx
15.3 KB
Roads Pre-Payment Checklist.docx
161.4 KB
Safe_System_of_Work_for_Digging-ESB.pdf
183.0 KB
Safety Stickers-ESB.pdf
81.7 KB
Safety-Tips.pdf
107.0 KB
Signage at Overhead Cables..pdf
429.6 KB
Site Location Map - LP 4921.pdf
121.1 KB
Site Location Map LP3445-3444.pdf
193.6 KB
Site Location Map R162.pdf
208.0 KB
Site Location Map R178.pdf
228.7 KB
Site Location Map R181.pdf
190.6 KB
Site Location Map R183.pdf
183.8 KB
Site Location Map R187.pdf
137.5 KB
SSWP_Civil_Eng_Pic.pdf
711.2 KB
SSWP_Civil_Engineering_Form.pdf
787.8 KB
SSWP_Ground_Works_Form.pdf
362.5 KB
SSWP_Ground_Works_Pictograms_PDF.pdf
798.7 KB
SSWP_Road_Works_Form.pdf
1.3 MB
SSWP_Roadworks_Pic.pdf
407.0 KB
Summary_of_Key_Duties_under_the_Procurement,_Design_and_Site_Management_Requirements.pdf
1.3 MB
Understanding_Construction_Risk_Assessment.pdf
2.8 MB
Use_Of_Mobile_Machinery_On_Construction_Sites.pdf
241.9 KB
Vol C - Pricing Document part 1 of 2.docx
254.8 KB
Vol C - Pricing Document part 2 of 2.xlsx
51.1 KB
Volume A Cover.docx
212.3 KB
Water Services Info.pdf
218.8 KB
WaterServicesInfo.pdf
826.1 KB
Working_on_Roads_Guidelines.pdf
1.5 MB
Original notice text
Monaghan County Council seeks contractors for pavement surfacing works on regional and former national roads, ensuring compliance with specifications and quality standards.
AI analysis updated 4 months ago
Deadline
31 Mar
Buyer
Monaghan County CouncilLocation
Regional and former national roads in County Monaghan
Procedure
Open
Clarification
18 Mar 2025
eTenders ID
5200452
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender