TEN2400267 - Architect led Design Team for proposed Construction Works Stages (ii) to (v) of the Cootehill Saint Michael's Hall, Cootehill, Co. Cavan

Value

€300k

Deadline

05 Dec

Architect led design team for construction works at Cootehill Saint Michael's Hall over 3 years

SME fit: Medium Bid effort: Medium 📍 Cavan

Architect led design team for construction works at Cootehill Saint Michael's Hall over 3 years

Bidder profile

Mid-sized to large firms with experience in public sector projects and a strong compliance framework.

Risks & flags

  • Qualification gate
  • Two-step process
  • Insurance requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Cavan County Council
Title TEN2400267 - Architect led Design Team for proposed Construction Works Stages (ii) to (v) of the Cootehill Saint Michael's Hall, Cootehill, Co. Cavan for Cavan County Council.
CPV / category services
Estimated value 300000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 years
Submission deadline 2024-12-05T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Cavan County Council ran this procurement for “TEN2400267 - Architect led Design Team for proposed Construction Works Stages (ii) to (v) of the Cootehill Saint Michael's Hall, Cootehill, Co. Cavan for Cavan County Council.” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[14] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
  • (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,00012 € 1,500,00013 Maximum level of excess in any one claim
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 650000014 Maximum level of excess for property only* for any one incident below which the Service Provider will bear the cost: € 10,000 14 If no value is entered it shall read
  • Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest
  • um level of excess in any one claim below which the Specialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest
  • Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000
  • 0% of gross fee turnover, or €5,000 whichever is greater From start to completion of the Services; and six years
  • eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Services
  • Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the Services
  • schoolhouse. St. Michael’s Hall is now serviced with
  • activities. These initiatives supported the church Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • made a minimum of one week before decision is required in accordance with the programme
  • nergy Strategy is to be established in conjunction with the BER assessor and Cavan
  • Energy Strategy must be established in conjunction with the BER assessor
  • [01 EX 23-69 Existing Site Plan.pdf] EP

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o; Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[14] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[14] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[15] Entitles issuing
  • Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Se
  • Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Maximum level of excess in any one claim below which the Service Provider will 2% not stated not stated
um level of excess in any one claim below which the Specialist Service Provider 2% not stated not stated
Whole Life Carbon Analysis should include minimum of 95% of cost, include substr 95% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • and meeting any other minimum requirements in the relevant Suitability Assessment Questionnaire criterion[1]
  • [01 EX 23-69 Existing Site Plan.pdf] EP
  • [01 EX 23-69 Existing Site Plan.pdf] 91.71
  • [01 EX 23-69 Existing Site Plan.pdf] 90.25
  • [01 EX 23-69 Existing Site Plan.pdf] .95=TOW
  • [01 EX 23-69 Existing Site Plan.pdf] 91.06

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-12-05T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-12-05T12:00:00+00:00
Date surfaced in documents 20 November 2023
Date surfaced in documents November 2023
Date surfaced in documents October 2023

8. Contract terms that matter

Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o
  • Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Se
  • (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,00012 € 1,500,00013 Maximum level of excess in any one claim
  • NOW IT IS HEREBY AGREED, in consideration of the payment of €5 (five Euro) from the Client to the Sub-Consultant, receipt and sufficiency of w
  • Both an amount or amounts of money less than €10 million in total and an extension of
  • eath, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € From start to completion of the Services
  • sor Design Process- in accordance with legislation, team member Design/Assigned Certifier in accordance with legislation

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: [3
  • nergy Strategy is to be established in conjunction with the BER assessor and Cavan
  • EN ISO 19650 series as an international standard of good
  • S EN ISO 19650-2:2018 a BIM Execution Plan must be agreed between the Design
  • ystems generated during design and construction conforms to ISO 19650
  • EN ISO 19650
  • BIM (Building information modelling according to ISO 19650-2
  • timber frame, glass balustrades etc
  • Provide inputs and relevant data to the assigned BER and Energy assessor to
  • Provide inputs and relevant data to the assigned BER and Energy assessor to carryout preliminary
  • BER calculations
  • Data applicable to BER determination must be shown on drawings
  • Carryout inspections as required to complete BER assessments
  • Make recommendations on the number and scope of
  • and publishing of final BER certificates
  • Energy Strategy must be established in conjunction with the BER assessor
  • carbon impact and other environmental impacts according to EN 15978–2011 ie Life Cycle

Geographic constraints

  • Within 3 months of receipt of the Contractors Final Statement, the Employer’s Representative must

Deadline phrases

  • tion received by the planning authority on 20 November 2023 save as may be otherwise required by the following conditions

Scale / volume phrases

  • rights of termination (and the like) will cease if, within 28 days from receipt of the Discontinuance Noti
  • If the dispute has not been resolved within 21 days of the delivery of the notice of disput
  • the chief executives of the parties prior to the expiry of 21 days of the delivery of the notice of the di
  • the applicant’s current principal banker dated within past 6 months, stating that, to the best of its knowl
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • A party receiving a notice of arbitration must, within 21 days after receiving it, send a response
  • If the arbitral tribunal has not been formed within 42 days after the notice of arbitration was sen
  • The notice should be given within 14 days after the appointing body receives
  • If notice is not given within 21 days after the appointing body receives the
  • within 14 days after the invitation or notice of appoi
  • Within 14 days after formation, the sole or presiding
  • Within 21 days after the arbitral tribunal has been fo
  • Within 28 days after the arbitral tribunal is formed,
  • Each party receiving a statement of case must, within 42 days after receiving it, serve on each
  • 1 is reduced to 2 days
  • necessary to make an award on all matters except costs in 100 days
  • Within 10 days after the appointment of the arbitrator
  • The parties and the arbitral tribunal must, within 10 days after the direction, complete the
  • statement of case within 21 days
  • me for delivery of a statement of defence to be abridged to 28 days from receipt of
  • within 28 days
  • xperts to be completed and joint expert reports sent within 14 days after
  • Any oral hearing to be completed within 86 days
  • If a deposit requested is not paid in full within 14 days after receipt of the request, the arbit
  • matters except costs and interest within 100 days after the date of formation of the arbi

TENDER DOCUMENTS [01 EX 23-69 Existing Site Plan.pdf, 01 EX 23-69 Existing Site Plan.pdf, St Michael's Hall, Cootehill - Architectural Assessment & Method Statement.pdf.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Appendix-B1 SMH.docx, ~$ta Processing Declaration Form.docx, schedule of works is essential to bring the building back into.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€300,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,250,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Architect-led Design Team for Saint Michael's Hall

Design and consultancy services for construction works at Saint Michael's Hall, Cootehill, Co. Cavan.

Documents (41)

PDF

00 EX 23-69 OS Map.pdf

1.7 MB

PDF

01 EX 23-69 Existing Site Plan.pdf

452.1 KB

PDF

01 GA 23-69 Site Plan.pdf

875.8 KB

PDF

02 EX 23-69 Existing Floor Plans.pdf

472.5 KB

PDF

02 GA 23-69 Proposed Ground Floor Plan.pdf

1.0 MB

PDF

03 EX 23-69 Existing Elevations & Sections.pdf

3.6 MB

PDF

03 GA 23-69 Proposed First Floor Plan & Elevation.pdf

786.3 KB

PDF

04 EX 23-69 Demolition Plans & Elevations.pdf

1.2 MB

PDF

04 GA 23-69 Proposed Elevations.pdf

958.8 KB

PDF

05 GA 23-69 Proposed Sections.pdf

200.6 KB

PDF

Appendix 2 - Data Processing Declaration Form.pdf

167.2 KB

DOC

Appendix F SMH.doc

32.5 KB

DOCX

Appendix-B1 SMH.docx

19.3 KB

DOCX

Appendix-B3 SMH.docx

18.0 KB

DOCX

Appendix-C SMH.docx

27.5 KB

DOCX

Appendix-D SMH.docx

26.2 KB

PDF

Arbitration-Rules-AR1-v1.3-14-10-2024 SMH.pdf

361.6 KB

PDF

Architect's Report 01.pdf

2.7 MB

PDF

CLARIFICATION 2 Response .pdf

103.1 KB · Clarification / Addendum

PDF

CLARIFICATION1 Response .pdf

149.3 KB · Clarification / Addendum

PDF

COE-1-v2.j-30-09-2024 SMH.pdf

408.7 KB

PDF

Design Brief SMH.pdf

553.0 KB

DOCX

ESPD Response Form SMH.docx

71.6 KB

DOCX

FTS9-v1.10-16-09-2024 SMH.docx

185.9 KB

PDF

ITT-S2b-v1.6-09-02-2022 SMH.pdf

425.6 KB

PDF

ITTS2 Invitation to Tender SMH.pdf

59.1 KB

DOCX

MF 2.1 Professional Indemnity Insurance Certificate. SMH.docx

44.1 KB

DOC

MF 2.2 Letter of Acceptance. SMH.doc

46.5 KB

DOCX

MF 2.4 H & S Compliance Declaration by all General Service Providers SMH.docx

23.2 KB

DOCX

MF 2.5 H & S Compliance Declaration by PSDP SMH.docx

23.0 KB

DOCX

MF-2.3-v1.2-14-10-2024 SMH.docx

43.7 KB

DOCX

MF-2.7-09-02-2022 SMH.docx

30.9 KB

DOCX

MF-2.8-09-02-2022 SMH.docx

24.0 KB

DOCX

Pricing Document SMH.docx

24.3 KB

DOCX

QC2-Suitability Assessments for Service Providers, Part 1 SMH.docx

137.1 KB

PDF

QC2-Suitability Assessments for Service Providers, Part 1 SMH.pdf

553.8 KB

DOCX

QC2-Suitability Assessments for Service Providers, Part 2 SMH.docx

63.4 KB

PDF

Service Requirements - SMH.pdf

698.9 KB

PDF

St Michael's Hall, Cootehill - Architectural Assessment & Method Statement.pdf

5.0 MB

DOCX

~$pendix A description of services B J D.docx

162 bytes

DOCX

~$ta Processing Declaration Form.docx

162 bytes

Original notice text

Cavan County Council seeks an architect-led design team for construction works at Cootehill Saint Michael's Hall, covering stages (ii) to (v) over a 3-year period, ensuring compliance with reporting and handover obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€300k

Deadline

05 Dec

View on eTenders ↗

Location

Cootehill, Co. Cavan, Ireland

Procedure

Open

Clarification

14 Nov 2024

eTenders ID

4573423

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender