Supply and Installation and configuration of one LED Video Wall at the Institute of Art Design and Technology - IADT
Deadline
08 Nov
08 Nov 2024
Deadline
08 Nov
Tender for LED Video Wall supply and installation at IADT
Tender for LED Video Wall supply and installation at IADT
Bidder profile
Ideal for mid-sized to large firms with experience in public sector tenders and technical installations.
Risks & flags
- Undisclosed contract value
- Qualification gate may narrow bidder pool
- Two-step tender process increases compliance burden
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Dún Laoghaire Institute of Art Design and Technology |
| Title | Supply and Installation and configuration of one LED Video Wall at the Institute of Art Design and Technology - IADT. Tender Ref. NT2024-19B LEDVM |
| CPV / category | supplies |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 months |
| Submission deadline | 2024-11-08T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Dún Laoghaire Institute of Art Design and Technology ran this procurement for “Supply and Installation and configuration of one LED Video Wall at the Institute of Art Design and Technology - IADT. Tender Ref. NT2024-19B LEDVM” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: Supply and Installation and configuration of one LED Video Wall at the Institute of Art Design and Technology - IADT. Tender Ref. NT2024-19B LEDVM
- Supply, Installation, and configuration of one LED Video
- (“Tenderers”) for the supply of the goods as described in Appendix 1 to this RFT (the
- the successful implementation of any Goods Contract that may result from this Competition
- services to the Union’s public procurement and concession markets and procedures
- supporting negotiations on access of Union economic operators, goods and services to the
- the supply of samples for purposes of tendering and their return after evaluation or
- Contract arising out of this Competition, the successful Tenderer shall be required to supply its Tax
- status by the Contracting Authority. By supplying these numbers the successful Tenderer
- Agreement or Services Contract entered into by a Tenderer.
- [IADT RFT NT2024-19B LEDVM.pdf] maintenance;
- the Prime Contractor relies, all or any of the supporting documents specified Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Contracting Authority policy seeks to encourage participation on a fair and equal basis by
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12.7 million Public Liability €6; 5 million Product Liability €6.5 million] Professional Indemnity €6
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12.7 million Public Liability €6
- 5 million Product Liability €6.5 million] Professional Indemnity €6
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- €200,000 and €999,000 in the last three (3) years preceding the declaration
- €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
- €3,999,000 in the last three (3) years preceding the declaration, to include all non-notif
- [IADT RFT NT2024-19B LEDVM.pdf] GoodsRFT150124
- Declaration as to Personal Circumstances of Tenderer
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-11-08T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-11-08T12:00:00+00:00 |
| Date surfaced in documents | 31 July 2014 |
| Date surfaced in documents | Regulations 2016 |
| Date surfaced in documents | Acts 1995 |
8. Contract terms that matter
Contract duration in the extract: 3 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- Sector: Office Supplies & Equipment
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- The successful Tenderer shall be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €12.7 million Public Liability €6
- NOW IT IS HEREBY AGREED in consideration of the sum of €2.00 (the receipt of which is hereby
- remedy) within 30 days after receipt of a request in writing f
- For the Term and for a period of 12 months thereafter (and save in respect of publ
- field of study as well as for events and executive leadership meetings.
- [IADT RFT NT2024-19B LEDVM.pdf] and executive leadership meetings.
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: IADT RFT NT2024-19B LEDVM.pdf, RFT NT2024-19B LEDVM.pdf] GoodsRFT150124, Appendix 1:.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Appendix 2:, Schedule, Appendix 3:.
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,000,000
Scoring
Most Economically Advantageous Tender
Technical Merit
Price
Lots (1)
Provision of an LED video wall for immersive visual experiences, including installation and configuration.
Documents (3)
IADT RFT NT2024-19B LEDVM.pdf
1.4 MB · RFT / Invitation to Tender
NT2024-19B LEDVM Appendix 2- Pricing Schedule.xlsx
23.2 KB · Pricing / BOQ / Schedule of Rates
Response to Qs. NT2024 19B LEDVM.pdf
81.9 KB · Clarification / Addendum
Original notice text
This tender involves the supply, installation, and configuration of a LED Video Wall at the Dún Laoghaire Institute of Art Design and Technology, requiring compliance with operational and reporting standards.
AI analysis updated 4 months, 1 week ago
Deadline
08 Nov
Location
Ireland
Procedure
Open
Clarification
17 Oct 2024
eTenders ID
4465407
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender