Design and Installation of a Ground Mounted Photovoltaic Array and Ancillary Equipment
Deadline
18 Oct
18 Oct 2024
Deadline
18 Oct
Design and installation of a photovoltaic array at Coolmoney Camp, Co. Wicklow
Design and installation of a photovoltaic array at Coolmoney Camp, Co. Wicklow
Bidder profile
This tender is suitable for SMEs with experience in renewable energy projects, particularly in photovoltaic installations.
Risks & flags
- High insurance requirements
- Tight timeline
- Turnover requirement may limit bidders
- Potential incumbent advantage
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Title |
|---|---|
| Irish Defence Forces_1144 | Design and Installation of a Ground Mounted Photovoltaic Array and Ancillary Equipment |
| CPV / category | Works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | Open Procedure |
| Lots | not stated |
| Location | Coolmoney Camp, Glen of Imaal, Co. Wicklow |
| Contract length | not stated |
| Submission deadline | 2024-10-18T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The contract involves the design and installation of a ground-mounted photovoltaic (PV) array and ancillary equipment at Coolmoney Camp, Glen of Imaal, Co. Wicklow. The project aims to enhance the energy efficiency and sustainability of the camp through renewable energy sources. The contractor will be responsible for the following activities:
-
Design Phase:
-
Develop detailed designs for the PV array, ensuring compliance with relevant regulations and standards.
-
Conduct site assessments to determine optimal placement and configuration of the PV system.
-
Installation Phase:
-
Install the PV array, including mounting structures, solar panels, inverters, and any necessary electrical connections.
-
Ensure all installations meet safety and quality standards.
-
Testing and Commissioning:
-
Perform testing of the installed system to verify functionality and performance.
-
Commission the system for operational use, ensuring all components are fully operational.
-
Maintenance and Support:
-
Provide ongoing maintenance services for a specified period post-installation to ensure system efficiency and reliability.
-
Offer technical support and troubleshooting as needed.
The contractor must adhere to all relevant health and safety regulations throughout the project lifecycle.
3. Background & buyer context
This procurement aligns with the Irish Defence Forces' commitment to sustainability and energy efficiency, as part of broader government initiatives to promote renewable energy sources. The project is part of a strategic effort to reduce carbon emissions and enhance energy independence within military operations. The timing of this tender reflects an increasing focus on renewable energy solutions in public sector projects, driven by national policy objectives and funding from the Office of Government Procurement.
4. Eligibility & selection criteria
Bidders must meet the following eligibility and selection criteria:
-
Turnover Requirement:
-
Minimum average annual turnover of €1.0 million in general construction.
-
Insurance:
-
Minimum level of Public Liability Insurance: €6,500,000 per accident.
-
Minimum level of Employer’s Liability Insurance: €13,000,000 per accident.
-
Minimum level of Professional Indemnity Insurance: €500,000.
-
Certifications:
-
Not specified for this tender.
-
Past Experience:
-
Minimum of 3 comparable PV projects of similar nature and complexity, each exceeding 100 kWp, completed within the last 5 years.
-
Personnel:
-
At least 5 years of experience as a Health & Safety Lead and Project Supervisor Construction Stage (PSCS) with experience in renewable energy projects.
-
At least 5 years of experience as a principal electrical/PV design engineer.
-
Geographic / Facility Constraints:
-
Not specified for this tender.
5. Award criteria & scoring
Bids will be evaluated based on the following criteria:
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| Price | 60 | Total cost of the project | Not specified |
| Quality | 40 | Technical approach, experience | Minimum score required |
The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, balancing price and quality.
6. Submission requirements
Bidders must submit the following documents:
- Method Statement: A response document following the provided template, with a maximum of 20 pages.
- CVs: CVs for key personnel, limited to 2 pages each.
- Pricing Schedule: Completed using the specified template.
- Case Studies: Three case studies of similar projects, with values ranging from €100,000 to €500,000.
- Declarations: Including ESPD, Bona Fides, Tax clearance, and Conflict of Interest statements.
- Mandatory Site Visit: A site visit is required; details will be provided in the tender documents.
- Submission Portal: All documents must be submitted via the eTenders platform, adhering to specified format rules.
7. Key dates & process
| Key Date | Date & Time |
|---|---|
| RFT issued | 2024-09-01 |
| Clarification deadline | 2024-10-01 |
| Mandatory site visit | 2024-10-05 |
| Tender deadline | 2024-10-18 11:00 |
| Expected award | 2024-11-01 |
| Contract start | 2024-11-15 |
| Go-live / Mobilisation | 2025-01-01 |
8. Contract terms that matter
Key contract terms include:
- Term & Extensions: The contract duration is not specified, but extensions may be possible based on performance.
- Payment Terms: Payments will be made upon completion of milestones as outlined in the contract.
- Key SLAs/KPIs: Specific performance indicators will be established, focusing on installation timelines and system performance metrics.
- Liquidated Damages: Penalties may apply for delays in project completion.
- Termination Clauses: The contract may be terminated for non-compliance with terms or failure to meet performance standards.
- IP Ownership: All intellectual property developed during the project will remain with the contracting authority.
- Sub-contracting Rules: Sub-contracting is permitted but must be disclosed and approved by the contracting authority.
9. Risks, red flags & unusuals
Potential risks and concerns include:
- Turnover Requirement: The minimum turnover threshold of €1.0 million may limit participation from smaller firms.
- Insurance Levels: High insurance requirements could pose a barrier for some bidders.
- Geographic Constraints: No specific geographic constraints are mentioned, which may broaden the pool of potential bidders.
- Tight Timeline: The project has a tight go-live date, with significant penalties for delays, which may pressure bidders to meet aggressive schedules.
- Incumbent Advantage: Previous contractors may have an advantage due to familiarity with the site and existing systems.
10. SME fit assessment
This tender is suitable for small to medium-sized enterprises (SMEs) with experience in renewable energy projects. Viable bidders should have:
- Relevant certifications and insurance coverage.
- Experience in delivering comparable projects, particularly in the renewable energy sector.
- The capacity to manage the project within the specified timeline and budget.
Consortium arrangements are allowed, enabling smaller firms to collaborate and meet the requirements collectively. Bid preparation is estimated to require approximately 10-15 days of effort. The presence of an incumbent contractor may influence the likelihood of winning (Pwin), as they may have established relationships and insights into the project.
11. Where to dig deeper
- Source RFT Filename: Instruction to Tenderers.pdf
- eTenders CFT ID: not specified
- Contact Email: not specified
- Important Attachments:
- Volume A: Works Requirements
- Volume B: Form of Tender and Schedule
- Volume C: Pricing Document
This tender has been awarded
- ACEL Energy Ltd · 24 Feb 2025
- ACEL Energy Ltd · 03 Feb 2025
Can you bid?
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€500,000
Scoring
Most Economically Advantageous Tender
Documents (10)
Instruction to Tenderers.pdf
434.9 KB · RFT / Invitation to Tender
Declaration of Competence as Contractor and PSCS.pdf
15.5 KB · Contract / Agreement / Terms
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.doc
25.6 KB · Form / Declaration / Certificate
Freedom of Information.pdf
91.5 KB · Form / Declaration / Certificate
Garda Vetting Form.pdf
309.0 KB · Form / Declaration / Certificate
Garda Vetting.pdf
7.4 KB · Form / Declaration / Certificate
Pay and Conditions of Employment Clause.pdf
91.3 KB · Form / Declaration / Certificate
Revenue Info and Electronic Funds Transfer.pdf
94.5 KB · Form / Declaration / Certificate
Information Pack.pdf
741.1 KB · Appendix / Annex
QW2-Part 1.docx
197.9 KB · ESPD (European Single Procurement Document)
Original notice text
This project involves designing and installing a ground-mounted photovoltaic array at Coolmoney Camp to enhance energy efficiency and sustainability through renewable energy.
AI analysis updated 3 months, 4 weeks ago
Deadline
18 Oct
Buyer
Irish Defence ForcesLocation
Coolmoney Camp, Glen of Imaal, Co. Wicklow
Procedure
Open
Clarification
01 Oct 2024
eTenders ID
4337946
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender