← Tenders / Design and Installation of a Ground Mounted Photovoltaic Array and Ancillary Equipment
Awarded Construction & Civil Engineering Works SME Suitable Open

Design and Installation of a Ground Mounted Photovoltaic Array and Ancillary Equipment

Deadline

18 Oct

Design and installation of a photovoltaic array at Coolmoney Camp, Co. Wicklow

SME fit: Medium Bid effort: Medium 📍 Wicklow

Design and installation of a photovoltaic array at Coolmoney Camp, Co. Wicklow

Bidder profile

This tender is suitable for SMEs with experience in renewable energy projects, particularly in photovoltaic installations.

Risks & flags

  • High insurance requirements
  • Tight timeline
  • Turnover requirement may limit bidders
  • Potential incumbent advantage

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Title
Irish Defence Forces_1144 Design and Installation of a Ground Mounted Photovoltaic Array and Ancillary Equipment
CPV / category Works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type Open Procedure
Lots not stated
Location Coolmoney Camp, Glen of Imaal, Co. Wicklow
Contract length not stated
Submission deadline 2024-10-18T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contract involves the design and installation of a ground-mounted photovoltaic (PV) array and ancillary equipment at Coolmoney Camp, Glen of Imaal, Co. Wicklow. The project aims to enhance the energy efficiency and sustainability of the camp through renewable energy sources. The contractor will be responsible for the following activities:

  • Design Phase:

  • Develop detailed designs for the PV array, ensuring compliance with relevant regulations and standards.

  • Conduct site assessments to determine optimal placement and configuration of the PV system.

  • Installation Phase:

  • Install the PV array, including mounting structures, solar panels, inverters, and any necessary electrical connections.

  • Ensure all installations meet safety and quality standards.

  • Testing and Commissioning:

  • Perform testing of the installed system to verify functionality and performance.

  • Commission the system for operational use, ensuring all components are fully operational.

  • Maintenance and Support:

  • Provide ongoing maintenance services for a specified period post-installation to ensure system efficiency and reliability.

  • Offer technical support and troubleshooting as needed.

The contractor must adhere to all relevant health and safety regulations throughout the project lifecycle.

3. Background & buyer context

This procurement aligns with the Irish Defence Forces' commitment to sustainability and energy efficiency, as part of broader government initiatives to promote renewable energy sources. The project is part of a strategic effort to reduce carbon emissions and enhance energy independence within military operations. The timing of this tender reflects an increasing focus on renewable energy solutions in public sector projects, driven by national policy objectives and funding from the Office of Government Procurement.

4. Eligibility & selection criteria

Bidders must meet the following eligibility and selection criteria:

  • Turnover Requirement:

  • Minimum average annual turnover of €1.0 million in general construction.

  • Insurance:

  • Minimum level of Public Liability Insurance: €6,500,000 per accident.

  • Minimum level of Employer’s Liability Insurance: €13,000,000 per accident.

  • Minimum level of Professional Indemnity Insurance: €500,000.

  • Certifications:

  • Not specified for this tender.

  • Past Experience:

  • Minimum of 3 comparable PV projects of similar nature and complexity, each exceeding 100 kWp, completed within the last 5 years.

  • Personnel:

  • At least 5 years of experience as a Health & Safety Lead and Project Supervisor Construction Stage (PSCS) with experience in renewable energy projects.

  • At least 5 years of experience as a principal electrical/PV design engineer.

  • Geographic / Facility Constraints:

  • Not specified for this tender.

5. Award criteria & scoring

Bids will be evaluated based on the following criteria:

Criterion Weight (%) Sub-criteria Pass/Fail Thresholds
Price 60 Total cost of the project Not specified
Quality 40 Technical approach, experience Minimum score required

The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, balancing price and quality.

6. Submission requirements

Bidders must submit the following documents:

  • Method Statement: A response document following the provided template, with a maximum of 20 pages.
  • CVs: CVs for key personnel, limited to 2 pages each.
  • Pricing Schedule: Completed using the specified template.
  • Case Studies: Three case studies of similar projects, with values ranging from €100,000 to €500,000.
  • Declarations: Including ESPD, Bona Fides, Tax clearance, and Conflict of Interest statements.
  • Mandatory Site Visit: A site visit is required; details will be provided in the tender documents.
  • Submission Portal: All documents must be submitted via the eTenders platform, adhering to specified format rules.

7. Key dates & process

Key Date Date & Time
RFT issued 2024-09-01
Clarification deadline 2024-10-01
Mandatory site visit 2024-10-05
Tender deadline 2024-10-18 11:00
Expected award 2024-11-01
Contract start 2024-11-15
Go-live / Mobilisation 2025-01-01

8. Contract terms that matter

Key contract terms include:

  • Term & Extensions: The contract duration is not specified, but extensions may be possible based on performance.
  • Payment Terms: Payments will be made upon completion of milestones as outlined in the contract.
  • Key SLAs/KPIs: Specific performance indicators will be established, focusing on installation timelines and system performance metrics.
  • Liquidated Damages: Penalties may apply for delays in project completion.
  • Termination Clauses: The contract may be terminated for non-compliance with terms or failure to meet performance standards.
  • IP Ownership: All intellectual property developed during the project will remain with the contracting authority.
  • Sub-contracting Rules: Sub-contracting is permitted but must be disclosed and approved by the contracting authority.

9. Risks, red flags & unusuals

Potential risks and concerns include:

  • Turnover Requirement: The minimum turnover threshold of €1.0 million may limit participation from smaller firms.
  • Insurance Levels: High insurance requirements could pose a barrier for some bidders.
  • Geographic Constraints: No specific geographic constraints are mentioned, which may broaden the pool of potential bidders.
  • Tight Timeline: The project has a tight go-live date, with significant penalties for delays, which may pressure bidders to meet aggressive schedules.
  • Incumbent Advantage: Previous contractors may have an advantage due to familiarity with the site and existing systems.

10. SME fit assessment

This tender is suitable for small to medium-sized enterprises (SMEs) with experience in renewable energy projects. Viable bidders should have:

  • Relevant certifications and insurance coverage.
  • Experience in delivering comparable projects, particularly in the renewable energy sector.
  • The capacity to manage the project within the specified timeline and budget.

Consortium arrangements are allowed, enabling smaller firms to collaborate and meet the requirements collectively. Bid preparation is estimated to require approximately 10-15 days of effort. The presence of an incumbent contractor may influence the likelihood of winning (Pwin), as they may have established relationships and insights into the project.

11. Where to dig deeper

  • Source RFT Filename: Instruction to Tenderers.pdf
  • eTenders CFT ID: not specified
  • Contact Email: not specified
  • Important Attachments:
  • Volume A: Works Requirements
  • Volume B: Form of Tender and Schedule
  • Volume C: Pricing Document

This tender has been awarded

Can you bid?

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€500,000

Scoring

Most Economically Advantageous Tender

Documents (10)

PDF

Instruction to Tenderers.pdf

434.9 KB · RFT / Invitation to Tender

PDF

Declaration of Competence as Contractor and PSCS.pdf

15.5 KB · Contract / Agreement / Terms

DOC

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.doc

25.6 KB · Form / Declaration / Certificate

PDF

Freedom of Information.pdf

91.5 KB · Form / Declaration / Certificate

PDF

Garda Vetting Form.pdf

309.0 KB · Form / Declaration / Certificate

PDF

Garda Vetting.pdf

7.4 KB · Form / Declaration / Certificate

PDF

Pay and Conditions of Employment Clause.pdf

91.3 KB · Form / Declaration / Certificate

PDF

Revenue Info and Electronic Funds Transfer.pdf

94.5 KB · Form / Declaration / Certificate

PDF

Information Pack.pdf

741.1 KB · Appendix / Annex

DOCX

QW2-Part 1.docx

197.9 KB · ESPD (European Single Procurement Document)

Original notice text

This project involves designing and installing a ground-mounted photovoltaic array at Coolmoney Camp to enhance energy efficiency and sustainability through renewable energy.

AI analysis updated 3 months, 4 weeks ago

Bid ↗
Details

Deadline

18 Oct

View on eTenders ↗

Location

Coolmoney Camp, Glen of Imaal, Co. Wicklow

Procedure

Open

Clarification

01 Oct 2024

eTenders ID

4337946

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender