Architect Led Integrated Design Team Services for the Proposed Development at Lough Key Forest and Activity Park, Co. Roscommon
Value
€15.0m
Deadline
30 Sep
30 Sep 2024
Value
€15.0m
Deadline
30 Sep
Integrated design team services for Lough Key Forest and Activity Park development
Integrated design team services for Lough Key Forest and Activity Park development
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capabilities in design services.
Risks & flags
- Qualification gate
- Two-step process
- Insurance requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Coillte CGA |
| Title | Architect Led Integrated Design Team Services for the Proposed Development at Lough Key Forest and Activity Park, Co. Roscommon |
| CPV / category | services |
| Estimated value | 15000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 years |
| Submission deadline | 2024-09-30T17:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Coillte CGA ran this procurement for “Architect Led Integrated Design Team Services for the Proposed Development at Lough Key Forest and Activity Park, Co. Roscommon” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: Architect Led Integrated Design Team Services for the Proposed Development at Lough Key Forest and Activity Park, Co. Roscommon
- claim below which the Service on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 3,000,000 € 3,500,000 Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover o
- cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for propert
- y only* for any one incident below which the Service Provider will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 3
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 3,000,000[12] € 3,500,000[13] Maximum level o
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000[14] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 3,000,000[12] € 3,500,000[[13]] Professional Indemnity Insurance
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[14] Maximum level of excess for property only* for any one incident below which the Service Providerwill bear the cost: € 10,000 * No excess is permitted in respec
- They contribute over €2 billion to the economy each year and support over 12,000 jobs
- Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest
- um level of excess in any one claim below which the Specialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest
- Maximum level of excess for property only* for any one incident below which the Service Provider will bear the cost: € 10,000 Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- of the agreed project requirements in respect of BER and Sustainable design strategy
- Nothing contained in these Instructions is, or shall be relied upon as, a representation of fact or promise as to the future. Any summaries or descriptions of documents or contractual arrangements contained in any part of these Instructions cannot be and are not intended to be comprehensive, nor any substitute for the underlying documentation (whether existing or to be concluded in the future), and are in all respects qualified in their entirety by reference to them.
- If the Applicant is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the contract to the successful Tenderer, whichever is later. If the Applicant is successful, and a contract is awarded to the Applicant at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Employer upon request.
- [3.2-ITTs Instructions to Tenderers Rev 1.docx] a contract is awarded to the Applicant at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Employer upon request.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 3,000,000 € 3,500,000 Maximum level of excess in any one; claim below which the Service on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 3,000,000 € 3,500,000 Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover o
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 3,000,000 € 3,500,000 Maximum level of excess in any one
- claim below which the Service on Each And Every claim basis Cover on an Annual Aggregate basis Minimum level of Professional Indemnity Insurance complying with the conditions below: € 3,000,000 € 3,500,000 Maximum level of excess in any one claim below which the Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover o
- cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichever is greatest 2% of turnover or €5,000, whichever is greatest Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for propert
- y only* for any one incident below which the Service Provider will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 3
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 3,000,000[12] € 3,500,000[13] Maximum level o
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| claim below which the Service on Each And Every claim basis Cover on an Annual 2% not stated not stated | |||
| cialist Service Provider will bear the cost: 2% of turnover or €5,000, whichev 2% not stated not stated | |||
| Maximum level of excess in any one claim below which the Service Provider will 2% not stated not stated | |||
| um level of excess in any one claim below which the Specialist Service Provider | 2% | not stated | not stated |
| Maximum level of excess in any one claim below which the Service Provider will 2% not stated not stated | |||
| um level of excess in any one claim below which the Specialist Service Provider | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Number and type of Electronic Copies of Tender: One - Via eTenders Post Box
- on is submitted, the Building Control Authority may, within 7 days of the
- 1.1 This procedure The Contracting Authority has sent a contract notice and tender documents for the Services to etenders and where appropriate a similar notice has been simultaneously sent to the Office for Official Publications of the EC for publication in the OJEU. The notice and tender documents are addressed to all those who wish to participate in a tender competition for the Services described in the “Particulars”.
- These documents set out the award criteria and the award process which will be followed by the Contracting Authority in making the assessment of whether Applicants are suitable to provide the Services and, from those Applicants deemed to be suitable, which tender is the most economically advantageous. These documents also set out the information which must be supplied by Applicants. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
- Suitability Assessment Questionnaire(s)
- Any information submitted with tenders and not called for in these Instructions or in post-tender clarifications.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-09-30T17:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-09-30T17:00:00+00:00 |
| Date surfaced in documents | 09 February 2022 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | February 2022 |
8. Contract terms that matter
Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 3,000,000[12] € 3,500,000[13] Maximum level o
- (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 3,000,000[12] € 3,500,000[[13]] Professional Indemnity Insurance
- Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € 10,000 From start to completion of the Servic
- The minimum level of Public Liability Insurance stated above applies to all Principal Service Providers
- The minimum level of Employer's Liability Insurance stated above applies to all Principal Service Providers
-
- Latest date for queries 10 days before latest time for receipt of tende
- y issue supplemental information or responses to queries 7 days before latest time for receipt of tende
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 3.2-ITTs Instructions to Tenderers Rev 1.docx, 3.1-Project Information Memorandum (PIM) Coillte.docx, 3.5-Project Execution Plan.docx.
- eTenders CFT / notice reference: contract notice and tender documents for the Services to etenders and where.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITTs Instructions to Tenderers Rev 1.docx] Instruction to Tenderers, ITT-S2(b) v1.6, ITTs Instructions to Tenderers Rev 1.docx] Continued on next page.
This tender has been awarded
- Taylor McCarney Architects · 17 Apr 2025
- Taylor McCarney Architects · 01 Mar 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Professional indemnity insurance
€3,000,000
Scoring
Most Economically Advantageous Tender
Opportunities for Sustainable Design Innovation
Service Delivery Approach and Methodology
Managing Time and Quality
Lots (1)
Provision of design services for the development at Lough Key Forest & Activity Park.
Documents (27)
3.2-ITTs Instructions to Tenderers Rev 1.docx
130.1 KB · RFT / Invitation to Tender
3.4-Pricing Schedule Rev 1.xlsx
21.9 KB · Pricing / BOQ / Schedule of Rates
SAQ_QC2-Part-1-MandE.docx
140.3 KB · Form / Declaration / Certificate
SAQ_QC2-Part-2-CS.docx
69.7 KB · Form / Declaration / Certificate
SAQ_QC2-Part-2-MandE.docx
69.4 KB · Form / Declaration / Certificate
1.1-Letter of Invitation to Tender.docx
29.8 KB
1.2-Schedule of Tender Docs.docx
44.2 KB
1.3-Tender Submission Checklist R1.docx
26.3 KB · Tender Response Template
1.3-Tender Submission Checklist.docx
26.4 KB
3.1-Project Information Memorandum (PIM) Coillte.docx
92.6 KB
3.2-ITTs Instructions to Tenderers.docx
129.4 KB
3.3-FTS9 Tender and Schedules.docx
196.7 KB
3.4-Pricing Schedule.xlsx
22.0 KB
3.5-Project Execution Plan.docx
327.6 KB
3.6-COE Conditions of Engagement.docx
79.0 KB
3.7-Schedule of Stage Services.pdf
355.2 KB
3.8 Project Development Brief & Masterplan.pdf
4.9 MB
Appendix-B1-QC1-and-QC2-09-02-2022.docx
27.8 KB
Appendix-B3-QC1-and-QC2-09-02-2022.docx
27.9 KB
Appendix-C-QC1-and-QC2-09-02-2022.docx
36.1 KB
Appendix-D-QC1-and-QC2-09-02-2022.docx
35.1 KB
Appendix_D1 Staff CV.docx
56.6 KB
SAQ_QC2-Part-1-Architect.docx
139.5 KB
SAQ_QC2-Part-1-CS.docx
139.2 KB
SAQ_QC2-Part-1-M&E.docx
139.3 KB
SAQ_QC2-Part-2-Architect.docx
69.5 KB
SAQ_QC2-Part-2-M&E.docx
69.9 KB
Original notice text
Coillte CGA seeks an architect-led integrated design team for the development at Lough Key Forest and Activity Park in Co. Roscommon, focusing on compliance and operational service execution over a 10-year period.
AI analysis updated 4 months ago
Value
€15.0m
Deadline
30 Sep
Buyer
Coillte CGALocation
Lough Key Forest and Activity Park, Co. Roscommon, Ireland
Procedure
Open
Clarification
16 Sep 2024
eTenders ID
4189023
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender