Proposed Main Drainage Layout
Value
€450k
Deadline
11 Sep
11 Sep 2024
Value
€450k
Deadline
11 Sep
Main drainage layout project for Avista CLG over 10 years
Main drainage layout project for Avista CLG over 10 years
Bidder profile
Mid-sized to large specialists with public sector tender experience and compliance processes.
Risks & flags
- Qualification gate turnover threshold
- Two-step process compliance burden
- Technical ambiguity for non-incumbents
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Avista CLG |
| Title | PROPOSED MAIN DRAINAGE LAYOUT |
| CPV / category | works |
| Estimated value | 450000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 year |
| Submission deadline | 2024-09-11T13:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Avista CLG ran this procurement for “PROPOSED MAIN DRAINAGE LAYOUT” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- BS EN 12056-4: 2000 Gravity drainage systems inside buildings
- The system shall be installed in accordance with IS EN 806 and shall be provided with protection
- Every fire alarm system shall be monitored by a 24 hour x 7 day remote monitoring station via an
- INSTALL SYSTEM CERTIFIED PROPRIETARY
- 8 - FULL SYSTEM BASE TRACK WITH PVC DRIP PROFILE (AS PER SPECIFICATION)
- 7 - FULL SYSTEM STARTER TRACK (AS PER
- Soil and Waste Services - Floor Plans
- Data and Communication Services - Floor Plans
-
- Mechanical & ELECTRICAL Services iNSTALLATION:
- to final co-ordinating detailing and verification by the appointed services sub
-
- ELECTRICAL SERVICES INSTALLATION:
- partition walls, block work walls, ceiling voids, service ducts, floor voids or surface Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Title: Renovations and alterations to existing residential dwelling in Clonee Co Meath
- EXISTING/DEMOLITION WEST (FRONT) ELEV
- EXISTING/DEMOLITION WEST (FRONT) ELEVATION
- EXISTING/DEMOLITION EAST (REAR) ELEVATION
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13m for any one event ; 5% of contractors turnover * public liability €6,500[9] * employer’s liability €6,500[10]
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- ) Minimum indemnity limit for employer’s liability insurance €13m for any one event
- 5% of contractors turnover * public liability €6,500[9] * employer’s liability €6,500[10]
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- certificate shall be submitted to the Engineer within 14 days of completion of the tests
- [23-005-102 DRAINAGE.pdf] SOAKAWAY REQUIREMENTS:
- [23-005-102 DRAINAGE.pdf] ABOVE TOP OT THE PIPE
- [1-WESTFIELD-CLONEE-RD-T-2-OF-3.pdf] BATHROOM
- [1-WESTFIELD-CLONEE-RD-T-2-OF-3.pdf] mm FLOOR
- [1-WESTFIELD-CLONEE-RD-T-2-OF-3.pdf] emolition
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-09-11T13:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-09-11T13:00:00+00:00 |
| Date surfaced in documents | Oct 2020 |
| Date surfaced in documents | August 2024 |
| Date surfaced in documents | Edition 2008 |
8. Contract terms that matter
Contract duration in the extract: 10 year. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- shall be mounted at a minimum of 150mm above floor level for concealed pipework and
- All radiators shall come complete with a minimum of 10 year guarantee
- reference number and the item of equipment to be served
- label stating the circuit reference number and the item of equipment being served e
- EN 1775 1998 – Gas Pipework in Buildings
- meter and its flexible pipe, preferably within 500 mm of the gas meter, but not in the meter box
- dentification labels shall be installed within 300 mm of every termination and along the cable
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 23-005-102 DRAINAGE.pdf, 1-WESTFIELD-CLONEE-RD-T-2-OF-3.pdf, 24164-REN-XX-XX-RG-XX-0001 - Document Issue Register.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: 24164-REN-XX-XX-SH-ME-0001 - Builder's Work Schedule.pdf, 24164-REN-XX-XX-SP-E-0001 - Electrical Specification.pdf, Form of Tender and Schedule (Volume B).docx.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500
Named standards / methodologies
Scoring
Lowest Price
Documents (54)
1-WESTFIELD-CLONEE-RD-T-1-OF-3.pdf
7.7 MB
1-WESTFIELD-CLONEE-RD-T-2-OF-3.pdf
16.2 MB
1-WESTFIELD-CLONEE-RD-T-3-OF-3.pdf
7.9 MB
23-005-102 DRAINAGE.pdf
938.6 KB
23-005-103 DRAINAGE CONNECTIONS.pdf
531.1 KB
24164-REN-XX-XX-CE-E-0001 - Fire Alarm Design Certificate (IS3218 Annex C1).pdf
96.9 KB
24164-REN-XX-XX-CE-E-0002 - Emergency Lighting Design Certificate (IS3217 Annex C2).pdf
72.2 KB
24164-REN-XX-XX-RG-XX-0001 - Document Issue Register.pdf
56.7 KB
24164-REN-XX-XX-SH-ME-0001 - Builder's Work Schedule.pdf
233.5 KB
24164-REN-XX-XX-SP-E-0001 - Electrical Specification.pdf
520.0 KB
24164-REN-XX-XX-SP-M-0001 - Mechanical Specification.pdf
307.8 KB
24164-REN-XX-ZZ-SH-ME-0002 - Contractor Provisions for Signoff.pdf
137.4 KB
24164-REN-ZZ-00-DG-E-6201 - General Services - Floor Plans.pdf
522.1 KB
24164-REN-ZZ-00-DG-E-6301 - Lighting Services - Floor Plans.pdf
623.0 KB
24164-REN-ZZ-00-DG-E-6401 - Data and Communication Services - Floor Plans.pdf
386.1 KB
24164-REN-ZZ-00-DG-E-6701 - Fire Alarm Services - Floor Plans.pdf
572.1 KB
24164-REN-ZZ-00-DG-E-6801 - Protective Services - Floor Plans.pdf
549.4 KB
24164-REN-ZZ-00-DG-E-6901 - Electrical Schematic - Heat Pump.pdf
358.3 KB
24164-REN-ZZ-00-DG-M-5201 - Soil and Waste Services - Floor Plans.pdf
487.7 KB
24164-REN-ZZ-00-DG-M-5301 - Water Services - Floor Plans.pdf
610.7 KB
24164-REN-ZZ-00-DG-M-5401 - Fuel Services - Floor Plans.pdf
174.6 KB
24164-REN-ZZ-00-DG-M-5601 - Heating Services - Floor Plans.pdf
558.0 KB
24164-REN-ZZ-00-DG-M-5701 - Ventilation Services - Floor Plans.pdf
214.8 KB
24164-REN-ZZ-00-DG-M-5901 - Mechanical Schematic - Heat Pump.pdf
342.6 KB
24164-REN-ZZ-00-SC-E-6900 - Electrical Schematic.pdf
185.4 KB
24164-REN-ZZ-00-SC-E-6901 - Electrical Schematic - Heat Pump.pdf
358.3 KB
24164-REN-ZZ-00-SC-M-5901 - Mechanical Schematic - Heat Pump.pdf
342.6 KB
C&S SPEC.pdf
3.4 MB
Electrical subcontract works Pricing Document.xls
86.0 KB
Form of Tender and Schedule (Volume B).docx
58.4 KB
ITT-W4-v1.5-01-08-2023-2. Vo.2docx.docx
117.5 KB
ITTW4_Invitation_to_Tender. Vo.2.doc
31.0 KB
Main Pricing Document.xlsx
26.1 KB
Mechanical subcontract works Pricing Document.xls
84.5 KB
MF-1.22-09-04-2020.pdf
134.8 KB
MF-1.23-09-04-2020.pdf
120.2 KB
Preliminary Safety_plan.pdf
5.8 MB
PW-CF6-v1.14-19-07-2023.pdf
534.9 KB
QW2_Appendix_A1.doc
32.0 KB
QW2_Appendix_A2.doc
40.5 KB
QW2_Appendix_B1.doc
67.5 KB
QW2_Appendix_B2.doc
48.5 KB
QW2_Appendix_B3.doc
49.0 KB
QW2_Appendix_C1.doc
46.0 KB
QW2_Appendix_C3.doc
47.0 KB
QW2_Appendix_C4.doc
46.5 KB
QW2_Appendix_H.doc
34.0 KB
QW2_Suitability_Assessment_Open_Form.doc
445.5 KB
QW2_Supplement_3.4.1.doc
84.5 KB
QW2_Supplement_3.4.2.doc
97.5 KB
T23-005-101 STRUCTURAL.pdf
372.0 KB
Tender Issue 23072024.pdf
238.4 KB
~$rm of Tender and Schedule (Volume B).docx
162 bytes
~�TW4_Instruction_to_Tender.docx
162 bytes
Original notice text
This tender involves the implementation and sustained service execution of a main drainage layout for Avista CLG, including installation and compliance with various standards and regulations.
AI analysis updated 4 months, 1 week ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender