← Tenders / Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead
Awarded Construction & Civil Engineering Works Open

Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead

Value

€600k

Deadline

11 Sep

Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead

SME fit: Medium Bid effort: Medium 📍 Mayo

Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead

Bidder profile

Mid-sized to large contractors with experience in public sector roofing projects and compliance with quality standards.

Risks & flags

  • Qualification gate
  • Two-step process
  • Compliance evidence required early

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Údarás Na Gaeltachta_289
Title Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead/Oibreacha athchóirithe díon ag Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead, Co. Mhaigh Eo d’ Údarás na Gaeltachta
CPV / category works
Estimated value 600000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 months
Submission deadline 2024-09-11T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Údarás Na Gaeltachta_289 ran this procurement for “Roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead/Oibreacha athchóirithe díon ag Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead, Co. Mhaigh Eo d’ Údarás na Gaeltachta” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • oflights are manufactured using systems fully accredited to ISO 9001 and ISO 14001 Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • CAREFULLY STRIP THE EXISTING FOIL FACED BITUMEN MEMBRANE AND INSULATION
  • FROM EXISTING METAL DECK, LEAVE EXISTING DECK PREPARED FOR NEW VAPOUR

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 3g Public Liability Insurance and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (w; ith a and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (w
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 3g Public Liability Insurance and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (w
  • ith a and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (w
  • ith a minimum level of cover of €13,000,000) in accordance with the conditions stat
  • 3g Public Liability Insurance and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (wi
  • th a minimum level of cover of €13,000,000) in accordance with the conditions stat

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] 
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] '->
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] 8
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] L42323=8=J=M9128=NO48=I=125O1E=823=PO4JE41D671287JQ=DOJ924715'
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] 91E
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] 41:JOE=9J4527KC98257K23=[78\52392E7172:7ICJGL4232345

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-09-11T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-09-11T11:00:00+00:00
Date surfaced in documents 09 October 2020
Date surfaced in documents 02 April 2020
Date surfaced in documents October 2020

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • EN 12101-10: Operation class A, Environmental class 1, with IP30
    1. Latest date for queries (8 days before latest time for receipt of Tende
  • y issue supplemental information or responses to queries (8 days before latest time for receipt of Tende
  • SHISNƒRMO}SN\XPzWPUHJOHIJLMNHOPQHMONMHSUSJWHIJZT{MzJOVW„JTOJWJNHPHS]JHIPHHIJ
  • [D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf] ]JHIPHHIJ
  • UHJOHIJZT{MzJOVW„JTOJWJNHPHS]JQJOHSUSJWHIJXPHJHIPHHIJ MO}WPOJW[€WHPNHSP{{z
  • MOIP]JSHXMNJ€zMHIJOWYPNXHIJLMNHOPQHMOZ[WHTPzMOP{{MRHIJZT{MzJOVWQMWHMUHIJ

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf, ;cJ5/0=/74/2363==/0?J490 +D +G, 12d/=e+^f63=6425F1@20J59 +D +Y, />/423/6a/@/4F +H +K, E5/79g65/64/23 +G 

        

!"#$# !% ' () *+,-./, ' 012345671289:2 ; <3=>>?@+)A )-,?B?)-4523=C=8571579554D1=EFG23=HICJ7G=827:=824KG:7ICJ491:= L42323=8=J=M9128=NO48=I=125O1E=823=PO4JE41D671287JQ=DOJ924715' ; <3=R?SA?

[D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf, 78\5' ; }.,.-,)/,?+ .~459JJ9CCJ4:9FJ=E929C872=:2471J9L 41:JOE41D23==1=89J€929 872=:2471Q=DOJ92471‚Q=DOJ92471‚Hƒ„WX †…UT„' ; <3=})B)/,> )-,?B?/.,)‡zoxqps‡ˆ‡xosq‡zz‰qŠ‹ŒstqŽvŒqpyz‘qpqzqwsos‡’q‰wŠqp :J9O5=“'`91EI9G41:JOE=9J4527KC98257K23=[78\52392E7172:7ICJGL4232345 671289:2' ; <

[D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: 78\539M=8=9:3=E9529D=7K:7IC

[D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf, 78\539M=8=9:3=E9529D=7K:7ICJ=2471239223=HICJ7G=8:9129=23=I7M=891E O5=23=I91E {4K23=8=98=91GE=K=:25 4123=HICJ7G=pyz‘qpqzqwsos‡’qyzv‡w‡vw‹vst£o¤stq 671289:278395D77E8=9571K7817239M41D8=:24K4=E23=I9J8=9EG91E‚F„1=423=823= E=K=:2517823=488=:24K4:9247198=J4=JG27C8=M=1223=[78\5K87IF=41DO5=E:71M=14=12JG 91E59K=JG91E

        

 !"#$%&''&()'&+&!$,-#',).,$ !$ /0#+1/&$#!!$%*,2#!$' 0$% 3&.&&!+&$ !4 

[D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf, QGNZVNUHNTVQ`TUQNTUcGQNHVXNGHXGOWZUNUJ $,0#!$' 0$) /4)$&,'&/ $!8$#,)0%4 $ 1'#0&,,!8r n8o $%&2#!$' 0$#',% //mno+ 6& 3 / ./&$#$%&b+1/#"&' //!-#'+ $#! !&0&,, '"$#4&+#!,$' $&0#+1/* !0&A*$%$%*,2/ ),&r !4no //#A-#' !4

[D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • ISO 14001

Public liability insurance

€6,500,000

Named standards / methodologies

ISO 9001ISO 14001

Scoring

Lowest Price

Documents (15)

PDF

0.01 - Invitation Letter.pdf

476.2 KB

PDF

0.02 - Instructions to Tenderers.pdf

717.3 KB

DOCX

27024 (A4u) - 2023.10.06 - DSC01 - SENT.docx

42.9 KB

PDF

A1.01 - Works Requirements - SOW.pdf

10.1 MB

PDF

A1.02 - Architects Drawings.pdf

1.0 MB

PDF

Appendix 01.pdf

1.1 MB

PDF

Appendix 02.pdf

4.9 MB

PDF

Appendix 03.pdf

4.9 MB

PDF

B1.01 - Tender and Schedule.pdf

171.9 KB

PDF

C1.01 - Pricing Document.pdf

264.1 KB

PDF

D.01 - Short Public Works Contract PW-CF6-v1.14-19-07-2023.pdf

1.2 MB

PDF

D.02 - Declaration of Suitability for Contractors.pdf

127.1 KB

PDF

D.03 - Preliminary Health & Safety Plan.pdf

4.0 MB

DOCX

FTS-6-v1.6-19-07-2023.docx

63.0 KB

DOCX

ITT-W4-v1.5-01-08-2023-2.docx

120.9 KB

Original notice text

This tender involves roof refurbishment works at Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead, including stripping existing materials and preparing the deck for new installations.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€600k

Deadline

11 Sep

View on eTenders ↗

Location

Aonad 2, Eastát Áit Uí Chonáin, Béal an Mhuirthead, Co. Mhaigh Eo, Ireland

Procedure

Open

Clarification

03 Sep 2024

eTenders ID

4137611

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender