RFT for the provision of Services to Revise the Transport Climate Change Adaptation Plan
Value
€300k
Deadline
13 Sep
13 Sep 2024
Value
€300k
Deadline
13 Sep
Services to revise the Transport Climate Change Adaptation Plan for the Department of Transport
Services to revise the Transport Climate Change Adaptation Plan for the Department of Transport
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in climate adaptation services.
Risks & flags
- Qualification gate
- Two-step process
- Compliance evidence requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Department of Transport |
| Title | RFT for the provision of Services to Revise the Transport Climate Change Adaptation Plan |
| CPV / category | services |
| Estimated value | 300000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 month |
| Submission deadline | 2024-09-13T14:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Department of Transport ran this procurement for “RFT for the provision of Services to Revise the Transport Climate Change Adaptation Plan” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: RFT for the provision of Services to Revise the Transport Climate Change Adaptation Plan
- rity estimates that the expenditure on the Services to be covered by the proposed Services Contracts may amount to some €300,000 (excl
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- he Service Provider should produce an execution plan within 2 weeks of being appointed to the contract, whi
- tion (the “Services Contract”) will be issued for a term of 12 months (“the Term”)
- Prior to and as a condition of award of any Services Contract, the successful Tenderer shall be required to designate a single entity who will carry overall responsibility for the Services Contract (the “Prime Contractor”), irrespective of whether or
- Prior to and as a condition of award of any Services Contract, the successful Tenderer shall be required to designate a single entity who will carry overall responsibility for the Services Contract (the “Prime Contractor”), irrespective of whether or not tasks are to be performed by a subcontractor or other consortium member (the “Subcontractor”).
- No publicity regarding this Competition or any Services Contract pursuant to this Competition is permitted unless and until the Contracting Authority has given its prior written consent to the relevant communication.
- The terms “Registrable Interest” and “Relative” shall be interpreted as per Section 2 of the Ethics in Public Office Acts 1995 and 2001, copies of which are available at www.irishstatutebook.ie. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or terminating any Services Contract entered into by a Tenderer.
- [20240823 FINAL version T-SAP II RfT.docx] decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or terminating any Services Contract entered into by a Tenderer.
- Any conflict of interest or potential conflict of interest on the part of a Tenderer, Subcontractor or individual employee(s) or agent(s) of a Tenderer or Subcontractor(s) must be fully disclosed to the Contracting Authority as soon as the conflict or potential conflict is or becomes apparent. Tenderers are required to declare that the preparation of their Tender was carried out independently. In the event of any actual or potential conflict of interest, the Contracting Authority may invite Tenderers to propose means by which the conflict of interest might be removed and in circumstances where there are links between Tenderers, the Contracting Authority may seek further information to confirm the Tenders have been prepared independently. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or any Mini-Competition or terminating any Framework Agreement or Services Contract entered into by a Tenderer.
- [20240823 FINAL version T-SAP II RfT.docx] Tenderer from this Competition or any Mini-Competition or terminating any Framework Agreement or Services Contract entered into by a Tenderer. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- The new National Adaptation Framework (NAF) was published in June 2024. It sets out the national strategy to reduce the vulnerability of the country to the negative effects of climate change and to avail of positive impacts. The NAF identifies 13 priority sectors under seven lead departments that are required to prepare sectoral adaptation plans under the Climate Act. The deadline under the NAF for the submission of sectoral adaptation plans (SAP) to Government for approval is Q3 2025. To note that finalisation and publication of the final Government-approved Transport SAP will follow the Government approval submission process.
- Tenderers must see the attached Background Information Note for further information, including on the required:
- Suppliers must also consult the attached Background Information Note for further information on the required data and information sources.
- Identify objectives that will help achieve these goals. Objectives should be clearly written, attainable and measurable, and include assumptions and rationale.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- here and insert details Email Address Click here and insert details Registered Office Postal Address Click here and insert details Minimum level of capacity Tenderers must have an annual turnover of not less than €200,000 (excluding VAT) for each of the last thr
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions (valued between €200,000 and €999,000 in the last three years preceding the declaration)
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
- For reporting of foreign financial contributions which are of a value between €200,000 and €999,000 in the last three (3) years preceding the declaration
- Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions (valued between €1,000,000 and €3,999,000 in the last three years preceding the declaration)
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
- between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-09-13T14:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-09-13T14:00:00+00:00 |
| Date surfaced in documents | Acts 1995 |
| Date surfaced in documents | Act 2002 |
| Date surfaced in documents | The 2002 |
8. Contract terms that matter
Contract duration in the extract: 12 month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €200,000 and €999,000 in the last three (3) years preceding the declaration
- 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration
- tion (the “Services Contract”) will be issued for a term of 12 months (“the Term”)
- e right to extend the Term for a period or periods of up to 3 months with a maximum of 1 such extension or e
- ontinues for 30 calendar days either Party may terminate at 14 days notice
- breach(es) (if the breach(es) are capable of remedy) within 30 days after receipt of a request in writing f
- For the Term and for a period of 12 months thereafter (and save in respect of publ
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 20240823 FINAL version T-SAP II RfT.docx, To
[20240823 FINAL version T-SAP II RfT.docx, To be completed by notifying parties where the value of the procurement procedure is equal to or greater than the financial thresholds in Article 28 of Regulation (EU) 2022/2560 and where the notifying party has been in receipt of foreign financial contributions which are valued between €1,000,000 and €3,999,000 in the last three (3) years preceding the declaration. Notifying parties are required to complete the table below. They must list all foreign financial contributions received, to include all non-notifiable foreign contributions received in the last three (
[20240823 FINAL version T-SAP II RfT.docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: RFT for the provision of Services to Revise the Transport Climate Change Adaptation, Appendix 3A: Schedule C – Declaration of non-notifiable foreign financial contributions, Appendix 3A: Schedule D – Declaration of non-notifiable foreign financial contributions.
This tender has been awarded
- AECOM Ireland Ltd · 26 Nov 2024
- AECOM Ireland Ltd · 15 Nov 2024
Can you bid?
Required certifications
- ISO 9001
- Environmental Management Certification
Minimum turnover
€200,000
Scoring
Most Economically Advantageous Tender
Approach and Methodology to Service Methodology
Quality, Relevant Experience and Availability of Resources of Proposed Team
Lots (1)
Documents (4)
20240823 FINAL version T-SAP II RfT.docx
200.8 KB · RFT / Invitation to Tender
20240904 Updated FINAL version T-SAP II RfT Background Information Note.pdf
1.0 MB · RFT / Invitation to Tender
20240802 FINAL version T-SAP II TRD.docx
80.1 KB · Tender Response Template
espdRequest-4075460.pdf
70.9 KB · ESPD (European Single Procurement Document)
Original notice text
The Department of Transport seeks services to revise its Transport Climate Change Adaptation Plan, focusing on implementation and compliance reporting over a 12-month contract.
AI analysis updated 4 months ago
Value
€300k
Deadline
13 Sep
Buyer
Department of TransportLocation
Department of Transport headquarters
Procedure
Open
Clarification
26 Aug 2024
eTenders ID
4075460
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender