PROJ000009581 - SSB055C Request for Tender for Operational Dry Suit Systems
Value
€1.0m
Deadline
03 Oct
03 Oct 2024
Value
€1.0m
Deadline
03 Oct
Tender for the manufacture and supply of operational dry suit systems for the Irish Coast Guard.
Tender for the manufacture and supply of operational dry suit systems for the Irish Coast Guard.
Bidder profile
Firms with experience in manufacturing and supplying operational equipment, particularly in compliance with public procurement standards.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | The Office of Government Procurement |
| Title | PROJ000009581 - SSB055C Request for Tender (RFT) for the Manufacture, Supply and Delivery of Operational Dry Suit Systems to the Minister for Transport, Irish Coast Guard (IRCG) |
| CPV / category | supplies / Office Supplies & Equipment |
| Estimated value | €1000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2024-10-03T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for PROJ000009581 - SSB055C Request for Tender (RFT) for the Manufacture, Supply and Delivery of Operational Dry Suit Systems to the Minister for Transport, Irish Coast Guard (IRCG). The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Office Supplies & Equipment under buyer workflows in The Office of Government Procurement.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: 1 Minimum Annual Turnover Tenderers must have generated an average annual turnover of €1,000,000 (excluding VAT) for each of the last thr
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — Turnover Tenderers must have generated an average annual turnover of €1,000,000
- Insurance
- Insurance — not specified for this tender
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: 1 Minimum Annual Turnover Tenderers must have generated an average annual turnover of €1,000,000 (excluding VAT) for each of the last thr
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2024-10-03T12:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): 03. SSB055C Appendix 7 Glossary of Terms.pdf, 04. SSB055C Appendix 8 Glossary of Standards.pdf
- eTenders CFT ID: not stated
- Clarification contact / portal: not stated
- Priority attachments: 03. SSB055C Appendix 7 Glossary of Terms.pdf, 04. SSB055C Appendix 8 Glossary of Standards.pdf
This tender has been awarded
- Sioen Ireland · 12 Feb 2025
- Sioen Ireland · 11 Feb 2025
Can you bid?
Required certifications
- ISO 9001
- ISO 14001
- ISO 15027
- ISO 20345
Minimum turnover
€1,000,000
Scoring
Most Economically Advantageous Tender
Total Cost
Technical Compliance
Quality of Samples
Lots (1)
Manufacture, supply, and delivery of 665 operational dry suit systems including dry suits, under suits, and safety boots.
Documents (8)
05. SSB055C Appendix 2 Pricing Schedule V3.xlsx
96.5 KB · Pricing / BOQ / Schedule of Rates
01. SSB055C RFT Operational Dry Suit System for IRCG V5.pdf
2.5 MB
02. SSB055C Tender Response Document V3.docx
247.2 KB · Tender Response Template
03. SSB055C Appendix 7 Glossary of Terms.pdf
673.6 KB · Appendix / Annex
04. SSB055C Appendix 8 Glossary of Standards.pdf
633.6 KB · Appendix / Annex
Clarification Response Update 01.pdf
448.4 KB · Clarification / Addendum
Clarification Response Update 02.pdf
425.0 KB · Clarification / Addendum
Clarification Response Update 03.pdf
342.6 KB · Clarification / Addendum
Original notice text
This tender seeks suppliers for the manufacture, supply, and delivery of operational dry suit systems to the Irish Coast Guard, ensuring compliance with specifications and quality requirements.
AI analysis updated 4 months ago
Value
€1.0m
Deadline
03 Oct
Location
Irish Coast Guard locations across Ireland
Procedure
Open
Clarification
17 Sep 2024
eTenders ID
4050590
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender