← Tenders / Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation
Closed Construction & Civil Engineering Works Framework Restricted

Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation

Deadline

23 Aug

Framework for prefabricated modular residential accommodation over 10 years

SME fit: Medium Bid effort: Medium 📍 Limerick

Framework for prefabricated modular residential accommodation over 10 years

Bidder profile

Mid-sized to large firms with experience in public sector tenders and modular construction.

Risks & flags

  • Undisclosed contract value
  • Qualification gate turnover requirement
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Limerick Twenty Thirty DAC
Title Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 10 years
Submission deadline 2024-08-23T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

Limerick Twenty Thirty DAC ran this procurement for “Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • centre, the written description of services, and the number and needs of the residents
  • The Department of Children, Equality, Disability, Integration and Youth (‘DCEDIY’) is the
  • Design, manufacture, supply, delivery and installation of new Prefabricated Modular
  • services, fittings & finishes from the design intent drawings, performance specification
  • Mechanical & Electrical services installations as per facility and room schedule
  • Supply and installation of fitted and loose furniture as per schedules.
  • All site services connections (foul, water, etc.) including linking back to existing
  • All associated site development works, including ground clearance works, services
  • contractors or professional services consultants to assist with the delivery of the residential
  • information is being provided in a certified or audited supporting document such as a set of
  • liabilities, or with one member of the Consortium or Joint Venture as a lead service provider Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Framework Agreement. This PIM sets out the background to the Contracting Authority’s
  • obtained in parallel with the fabrication period in the programme.
  • All site services connections (foul, water, etc.) including linking back to existing
  • The estimated programme for this procurement process is as follows:

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; marks N/A N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 5,000,000 Minimum level of Professional Indemnity Insurance required for € 3,000,000 /A N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 5,000,000 Minimum level of Professional Indem; nity Insurance required for € 3,000,000 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Minimum level of Public Liability I
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • marks N/A N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 5,000,000 Minimum level of Professional Indemnity Insurance required for € 3,000,000 /A N/A Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 5,000,000 Minimum level of Professional Indem
  • nity Insurance required for € 3,000,000 Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Minimum level of Public Liability I
  • 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
nity Insurance required for € 3,000,000 Maximum permissible excess on Prof 2% not stated not stated
claim below which the Contractor will bear the cost is the greater amount of 2% 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • Note 5: Applicants must obtain a minimum of 50% of available marks under this section per CV
  • [1-Project Information Memorandum (PIM).pdf] Confidentiality ........................................................................................................................... 10
  • notional pricing document or as per the Works Requirements. These tender documents will
  • [1-Project Information Memorandum (PIM).pdf] ional pricing document or as per the Works Requirements. These tender documents will
  • [1-Project Information Memorandum (PIM).pdf] sites It is envisaged that the units will be manufactured

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-08-23T14:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-08-23T14:00:00+00:00
Date surfaced in documents 13 October 2014
Date surfaced in documents 6 February 2017
Date surfaced in documents Regulations 2018

8. Contract terms that matter

Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • Title: Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation
  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
  • centre, the written description of services, and the number and needs of the residents
  • Medium Term Residential Accommodation July 2024
  • 2 16-Aug Could I please request an extension of time of 1 week on the tender return date, due to
  • Applicant’s current principal banker dated within the past 3 months stating the duration of the relationshi
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 1-Project Information Memorandum (PIM).pdf, Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx, QC1 Appendix D1 Staff CV.docx.
  • eTenders CFT / notice reference: contract notice has been published on e-tenders and the Official Journal of.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise:

[QC1 Appendix D1 Staff CV.docx, Applicant must describe the relevance of this project to

[QC1 Appendix D1 Staff CV.docx, Person’s Employer while providing professional service on

[QC1 Appendix D1 Staff CV.docx.

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€5,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€3,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Prefabricated 3D Modular Volumetric Emergency Residential Accommodation

Provision of modular emergency residential units under a framework agreement.

Documents (15)

PDF

2-IP National Standards.pdf

1.2 MB · Specification

PDF

1-Project Information Memorandum (PIM).pdf

278.5 KB · RFT / Invitation to Tender

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

48.5 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

44.5 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

40.0 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

29.1 KB · Form / Declaration / Certificate

DOCX

Appendix-F-Declaration-re-International-Procurement-Instrument.docx

24.8 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.0-28-07-2023-2.docx

68.1 KB · Form / Declaration / Certificate

DOCX

QW1-Part-1-v2.1-28-07-2023-3.docx

236.6 KB · Form / Declaration / Certificate

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

33.5 KB · Appendix / Annex

DOCX

Appendix-C-Bankers-Letter.docx

32.1 KB · Appendix / Annex

PDF

MA Framework Queries 09.08.2024.pdf

31.9 KB · Clarification / Addendum

PDF

MA Framework Queries 1 02.08.2024.pdf

20.3 KB · Clarification / Addendum

PDF

MA Framework Queries 3 16.08.2024.pdf

34.7 KB · Clarification / Addendum

DOCX

QC1 Appendix D1 Staff CV.docx

60.5 KB · Appendix / Annex

Original notice text

This framework agreement involves the design, manufacture, supply, and installation of prefabricated modular residential units, including all necessary site services and fittings.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

23 Aug

View on eTenders ↗

Location

Ireland

Procedure

Restricted

Clarification

16 Aug 2024

eTenders ID

4009194

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender