← Tenders / Request for Tender for an Out of Guage Baggage System for Shannon Airport Authority DAC
Awarded Supplies Supplies Open

Request for Tender for an Out of Guage Baggage System for Shannon Airport Authority DAC

Deadline

26 Aug

Tender for an Out of Gauge Baggage System at Shannon Airport

SME fit: Medium Bid effort: Medium 📍 Clare

Tender for an Out of Gauge Baggage System at Shannon Airport

Bidder profile

Ideal for mid-sized to large firms with public sector experience and operational capabilities in baggage handling systems.

Risks & flags

  • Qualification gate
  • Undisclosed contract value
  • Two-step process complexity
  • Technical granularity dependent on ITT

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Airport Authority DAC
Title Request for Tender for an Out of Guage Baggage System for Shannon Airport Authority DAC
CPV / category supplies
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 6 years
Submission deadline 2024-08-26T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Shannon Airport Authority DAC ran this procurement for “Request for Tender for an Out of Guage Baggage System for Shannon Airport Authority DAC” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Title: Request for Tender for an Out of Guage Baggage System for Shannon Airport Authority DAC
  • ndicates by notice to the Sub- Contractor in writing within 10 days of service of the Notice to Refer, the
  • [Appendix 3 - Ground Floor Masterplan.pdf] IMMIGRATION
  • [OOG System Request for Tender 23.07.24.docx] specification outlined in this tender including outline drawings and baggage flow diagram/drawing. 25% 2,500 Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • in writing to the Architect for his ruling and such a ruling shall be conclusive as to the meaning or application of these conditions. 12. All information shown relating to existing structure and construction detail is preliminary and subject to 'opening up' and
  • for compliance with design detail. 15. Contractor is responsible for procuring any proprietary items required/specified with due attention to 'lead-in' times ensuring compliance with programme dates.

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Maximum excess permitted for public liability and employer’s liability insurance: Maximum excess for Public liability insurance: € in respect of property damage only (If not stated, €10,000); If required, the minimum indemnity limit for professional indemnity insurance shall be € (If not stated, €6,500,000) for each and every claim or series of
  • Certifications — not specified for this tender
  • Past experience — 5 Insurance The successful bidder will maintain the following insurances (until project completion): Employers Liability: €13,000,000 Public / Products Liability: €6,500,000 Airside Liability: €127,000,000 Professional Indemnity: €1,000,000 (and for 6 years after project completio
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Maximum excess permitted for public liability and employer’s liability insurance: Maximum excess for Public liability insurance: € in respect of property damage only (If not stated, €10,000)
  • If required, the minimum indemnity limit for professional indemnity insurance shall be € (If not stated, €6,500,000) for each and every claim or series of
  • 5 Insurance The successful bidder will maintain the following insurances (until project completion): Employers Liability: €13,000,000 Public / Products Liability: €6,500,000 Airside Liability: €127,000,000 Professional Indemnity: €1,000,000 (and for 6 years after project completio

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • Minimum requirement to remain eligible in the competition: Applicants must complete the self-declaration providing information regarding their tax compliance
  • Minimum requirement to remain eligible in the competition: Applicants should complete the self-declaration providing information regarding the insurances in place
  • ce to half of this amount to be in place for the subsequent,12 months, or whatever is stated in the Appendix
  • [Appendix 3 - Ground Floor Masterplan.pdf] D01
  • [Appendix 3 - Ground Floor Masterplan.pdf] 3.0 m²

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-08-26T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-08-26T11:00:00+00:00
Date surfaced in documents January 2020
Date surfaced in documents Space 8450
Date surfaced in documents Room 4910

8. Contract terms that matter

Contract duration in the extract: 6 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • laim Date for the Sub-Contract which shall be not more than 30 days after the Commencement Date and may als
  • subsequent Payment Claim Dates which shall be not more than 30 days apart [see Clause 11(a)]
  • for the Sub-Contract which shall be not more than 30 days after the Commencement Date and may als
  • subsequent Payment Claim Dates which shall be not more than 30 days apart
  • y the Sub- Contractor of any such deduction, not later than 21 days after the relevant Payment Claim Date,
  • y the Sub- Contractor of any such deduction, not later than 21 days after the relevant Payment Claim Date g
  • vered by sub-clauses 11(b)(1) and (2) above] not later than 21 days after the relevant Payment Claim Date,

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Appendix 3 - Ground Floor Masterplan.pdf, Appendix 1 - Basement As-Built Survey.pdf, Appendix 4 - RIAI-CIF-Nominated-Sub-Contract-Form.docx.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: OOG System Request for Tender 23.07.24.docx, Appendix 2 - Ground Floor As-Built Survey.pdf, Appendix.

This tender has been awarded

Can you bid?

Required certifications

  • Airside Insurance
  • Public Liability
  • Professional Indemnity

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Supply and Maintenance of Baggage System

Supply, installation, and maintenance of a new baggage/carousel system, including training for the client's in-house maintenance team.

Documents (7)

DOCX

Appendix 4 - RIAI-CIF-Nominated-Sub-Contract-Form.docx

84.4 KB · Contract / Agreement / Terms

PDF

Appendix 1 - Basement As-Built Survey.pdf

1.8 MB · Appendix / Annex

PDF

Appendix 2 - Ground Floor As-Built Survey.pdf

8.5 MB

PDF

Appendix 3 - Ground Floor Masterplan.pdf

3.3 MB · Appendix / Annex

DOC

Appendix 5 - Design Subconsultancy Agreement DRAFT.doc

129.5 KB

DOCX

OOG System Request for Tender 23.07.24.docx

14.4 MB

DOCX

Tender Response Document - OOG Baggage System.docx

273.9 KB · Tender Response Template

Original notice text

Shannon Airport Authority DAC seeks a contractor for an Out of Gauge Baggage System, requiring implementation and ongoing service execution over a 6-year contract.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

26 Aug

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

09 Aug 2024

eTenders ID

4010856

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender