CfT for the internal and external refurbishment works to Caritas College, Ballyfermot
Value
€2.5m
Deadline
30 Aug
30 Aug 2024
Value
€2.5m
Deadline
30 Aug
Refurbishment works for Caritas College in Ballyfermot over 3 years
Refurbishment works for Caritas College in Ballyfermot over 3 years
Bidder profile
Mid-sized to large contractors with experience in public sector refurbishment projects and strong financial standing.
Risks & flags
- High turnover requirement
- Complex compliance obligations
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | The Rehab Group |
| Title | CfT for the internal and external refubishment works to Caritas College, Ballyfermot |
| CPV / category | works |
| Estimated value | 2500000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 Years |
| Submission deadline | 2024-08-30T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The Rehab Group ran this procurement for “CfT for the internal and external refubishment works to Caritas College, Ballyfermot” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- As included in Volume D and attachments Category of Specialist Date for warranty Amount withheld Minimum indemnity limit for professional indemnity insurance Maximum excess for professional indemnity insurance Mechancial Services Installation 30 Days after contract start date €50,000 €2,000,000 maximum permitted level of excess t
- CA REQUIREMENTS: Minimum Requirement: balance sheets or extracts from balance sheets where publication of the balance sheet is required under law of the country in which the service provider is established
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- It will be a condition of the award of the Contract that the successful Tenderer shall, for the term of the contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by the Contracting Authority. By supplying these numbers the successful Tenderer acknowledges and agrees that the Contracting Authority has the permission of the successful Tenderer to verify its tax cleared position online. Candidates may obtain information regarding their obligations concerning * taxation from the Revenue Commissioners (www.revenue.ie) * environmental protection from the Environmental Protection Agency (www.epa.ie) * employment protection and working conditions from the Workplace Relations
- Candidates must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the information contained in their Tender (as may be clarified in accordance with these Instructions).
- [ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx] if applicable); and• Referees.Any personal data provided will be processed for the purposes of the Competition, the administration of any contract awarded on foot of this Competition, reporting to any regulators or oversight bodies and/or any disputes relating to the Competition or the contract.In connection with the above, the Contracting Authority may disclose personal data to various recipients including:• the Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable);• the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and• regulators or oversight bodies.If the Tenderer is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a contract is awarded to the Tenderer at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request. Any data subjects in respect of which the Contracting Authority holds or processes personal data have rights in relation to their personal data, including the right to request access to their data and, in certain circumstances to request rectification, erasure or restriction of the processing of their personal data. All such data subjects have the right to lodge a complaint with the Irish supervisory authority, the Data Protection Commission.
- 2.3 Queries Queries may be raised in writing by email using the means of communication stated in the Particulars. Queries must be raised as soon as possible, and should be raised in any event no later than when stated in the Particulars. The Contracting Authority has no obligation to respond to queries although the Contracting Authority may at its discretion respond to queries raised after that date. If the Contracting Authority responds to a query, it will issue the response on the e-tenders website, unless the query has been clearly designated as confidential. If the query has been designated as confidential, and the Contracting Authority decides that the response should be published on the e-Tenders website, the Contracting Authority will so notify the person raising the query, who will have the option of withdrawing the query or having any response published on the eTenders platform. The Contracting Authority may under section 2.2 still issue any information it considers appropriate on the eTenders platform following withdrawal of the query. As with these Instructions, responses to queries will not create any contractual relationship between the Contracting Authority and Tenderers, or form part of the Contract, unless they state that they are amending the Contract
- [ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx] still issue any information it considers appropriate on the eTenders platform following withdrawal of the query. As with these Instructions, responses to queries will not create any contractual relationship between the Contracting Authority and Tenderers, or form part of the Contract, unless they state that they are amending the Contract documents. It is the responsibility of the Candidate to monitor the means of communication stated in the Particulars for any correspondence or clarifications in relation to this competition. If a person intending to submit a Tender becomes aware of any ambiguity, discrepancy, error, or omission in or between these documents, it must immediately notify the Contracting Authority, even after the time for submitting queries has expired.
- 5.1 Delivery Tenders must be received in accordance with the means of tender delivery[1] stated in the Particulars, at or before the latest time stated in the Particulars (or a later date and time advised by the Contracting Authority to Applicants) in the manner described in the Particulars. Time is taken as standard time according to the Standard Time Act 1968 as amended by the Standard Time (Amendment) Act 1971 and any subsequent amendment or re-enactment thereof. Where the Particulars state that the required means of tender submission is to the eTenders platform, Candidates are advised to ensure that they give sufficient time to allow for the successful upload of all tender documents and that they have a reliable, continual connection speed available for this purpose. Candidates should ensure that their operating system has sufficient capacity to execute the upload of all the documents included in the tender submission before the deadline stated in the Particulars (or a later date and time advised by the Contracting Authority to all Candidates). The timely and complete upload of documents is the responsibility of each Candidate. All files submitted electronically must be capable of being readily viewed in their entirety in the format stated in the Particulars. It is the responsibility of the Candidate to ensure that electronic documents submitted are not corrupt. Candidates are advised to consult etenders.gov.ie for information on uploading electronic submissions. Completed delivery of the tender in advance of the submission deadline is the responsibility of each Tenderer. All Tenders received on time will be opened promptly after receipt.
- 5.7 Pricing Unless otherwise stated, all sums given in Tenders must be in euro, to two decimal places. Tenderers must not insert additional items in the Pricing Document, except where permitted to do so by the Pricing Document, or make any alterations to the Pricing Document. Tenderers must not amend (lump sums or Reserved Sums) inserted in the Pricing Document by the Contracting Authority that are associated with named Specialist works set out in Part 1F (iii) of the Form of Tender and Schedule and Standing Conciliator services (if required) at Part 1N of the Form of Tender and Schedule. Where named Specialists (novated) are required under the Contract, Candidates will be required to price lump sum items in the Pricing Document to cover: 1. General attendances; 2. Special attendances; and 3. Management, to incorporate the Contractor’s management, risk acceptance and indirect overhead costs associated with the employment of each of the named Specialists to be engaged for the Works. 4. In the
- 5.8 Value-Added Tax The Form of Tender states whether and to what extent, the tendered Contract Sum includes value-added tax (VAT). The amounts in the Schedule, Part 2 exclude VAT. The Pricing Document excludes VAT unless otherwise stated in the Pricing Document. If the Pricing Document includes a schedule of items that are not construction operations subject to Relevant Contracts Tax (and therefore to reverse-charge VAT), and, in the Contracting Authority’s opinion, the categorisation of an item, the VAT rate stated, or the value stated is not correct, the Contracting Authority may invoke section 8.2. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- [ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx] if applicable); and• Referees.Any personal data provided will be processed for the purposes of the Competition, the administration of any contract awarded on foot of this Competition, reporting to any regulators or oversight bodies and/or any disputes relating to the Competition or the contract.In connection with the above, the Contracting Authority may disclose personal data to various recipients including:• the Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable);• the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and• regulators or oversight bodies.If the Tenderer is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a contract is awarded to the Tenderer at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request. Any data subjects in respect of which the Contracting Authority holds or processes personal data have rights in relation to their personal data, including the right to request access to their data and, in certain circumstances to request rectification, erasure or restriction of the processing of their personal data. All such data subjects have the right to lodge a complaint with the Irish supervisory authority, the Data Protection Commission.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 7,500,000 Minimum level of Professional Indemnity Insurance required for € 3,000,000 Maximum permissible excess on Profe; Minimum level of Public Liability Insurance required in respect of any one accident: € 6, Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I
- Certifications — not specified for this tender
- Past experience — Turnover Requirement CA SUPPLEMENTARY REQUIREMENTS: Minimum Requirement: the evidence submitted must demonstrate that the Applicant's overall annual turnover over the three (3) previous financial years was at least €7,500,000. Evidence should be in the form of overal; 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 7,500,000 Minimum level of Professional Indemnity Insurance required for € 3,000,000 Maximum permissible excess on Profe
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Turnover Requirement CA SUPPLEMENTARY REQUIREMENTS: Minimum Requirement: the evidence submitted must demonstrate that the Applicant's overall annual turnover over the three (3) previous financial years was at least €7,500,000. Evidence should be in the form of overal
- 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 7,500,000 Minimum level of Professional Indemnity Insurance required for € 3,000,000 Maximum permissible excess on Profe
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6, Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Minimum level of Public Liability I
- one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
- Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Minimum level of Public Liability Insurance required in respect of any one a 2% not stated not stated | |||
| in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Turnover Requirement CA SUPPLEMENTARY REQUIREMENTS: Minimum Requirement: the evidence submitted must demonstrate that the Applicant's overall annual turnover over the three (3) previous financial years was at least €7,500,000. Evidence should be in the form of overal
- CA SUPPLEMENTARY REQUIREMENTS: Minimum Requirement: the evidence submitted must demonstrate that the Applicant's overall annual turnover over the three (3) previous financial years was at least €7,500,000
- : Minimum Requirement: the evidence submitted must demonstrate that the Applicant's overall annual turnover over the three (3) previous financial years was at least €7,500,000
- Number and type of Electronic Copies of Tender: One PDF
- 1.1 This procedure The Contracting Authority has sent a contract notice for the Works to etenders and where appropriate a similar notice has been simultaneously sent to the Publications Office of the EU for publication in the Official Journal of the European Union. These documents set out the suitability assessment criteria, the award criteria and the evaluation and award process which will be followed by the Contracting Authority in making the assessment of which tender is either the lowest price or the most economically advantageous. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
- [ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx] documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-08-30T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-08-30T11:00:00+00:00 |
| Date surfaced in documents | 01 August 2023 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | August 2023 |
8. Contract terms that matter
Contract duration in the extract: 3 Years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000 The amount of the Performance Bond
- The liability of the Surety under this Bond will not exceed € .
- Minimum amount for interim payments, except release of retention, €75,000
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 3
- The Main Contractor to allow for timber grounds for various M&E equipment
- • Timber fascia/soffit boards to the slate roofs were in poor condition and may require
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx, 24-035 Electrical Document Register (NLN College) - T1.pdf, Schedule, part 2D) .
- eTenders CFT / notice reference: contract notice for the Works to etenders and where appropriate a similar n.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule and, ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx] Instruction to Tenderers, ITT-W2 V2.5.
This tender has been awarded
- Bracegrade Limited · 04 Jun 2025
- Bracegrade Limited · 21 Jan 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€7,500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€3,000,000
Scoring
Most Economically Advantageous Tender
Construction Management Plan
Approach to MEP Works
Resourcing Histogram
Lots (1)
Comprehensive construction project including site setup, demolition, waste management, and fit-out stages.
Documents (118)
FTS-1-v2.6-17-07-2023 - Rehab Ballyfermot.docx
104.6 KB · RFT / Invitation to Tender
ITT-W2-v2.5-01-08-2023-1 - Rehab Group.docx
137.1 KB · RFT / Invitation to Tender
1013 - Rehab Group - Pricing Document.pdf
1.3 MB · Pricing / BOQ / Schedule of Rates
1013 - Rehab Group - General Summary.pdf
98.6 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor-v3.0-28-07-2023 - Rehab Group.docx
48.0 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS-v3.0-28-07-2023 - Rehab Group.docx
43.9 KB · Form / Declaration / Certificate
Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
37.8 KB · Form / Declaration / Certificate
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
25.6 KB · Form / Declaration / Certificate
QW-Part-2-v1.0-28-07-2023-2 - Rehab Group.docx
69.8 KB · Form / Declaration / Certificate
QW2-Part-1-v2.0-28-07-2023-1 - Rehab Group.docx
188.0 KB · Form / Declaration / Certificate
1013 -Rehah Group - Tender BOQ.xls
748.5 KB
23D23 TD 110 A Demolition GF.pdf
835.5 KB
23D23 TD 111 A Demolition 1stF.pdf
330.0 KB
23D23 TD 120 A Ground Floor.pdf
854.6 KB
23D23 TD 121 A First Floor.pdf
322.9 KB
23D23 TD 122 A Roof Plan.pdf
221.4 KB
23D23 TD 200 A Elevations.pdf
1.0 MB
23D23 TD 401 A Grnd Door, Window, Fire.pdf
856.2 KB
23D23 TD 402 A First Door, Window, and Fire.pdf
413.2 KB
23D23 TD 403 A Internal Doors.pdf
381.2 KB
23D23 TD 404 A Roller Shutter, Screens.pdf
302.0 KB
23D23 TD 405 A External Doors.pdf
299.0 KB
23D23 TD 406 A Door Details.pdf
233.4 KB
23D23 TD 410 A Windows 1.pdf
309.7 KB
23D23 TD 411 A Windows 2.pdf
309.3 KB
23D23 TD 412 A Windows 3.pdf
269.8 KB
23D23 TD 413 A Window details.pdf
356.1 KB
23D23 TD 420 V3 Internal Door Schedule.pdf
119.4 KB
23D23 TD 421 V2 Ironmongery Schedule.pdf
141.9 KB
23D23 TD 422 V1 Ironmongery Spec.pdf
254.6 KB
23D23 TD 423 V1 External Door Schedule.pdf
114.8 KB
23D23 TD 424 A External Ironmongery Schedule.pdf
105.2 KB
23D23 TD 425 A Window Schedule.pdf
95.5 KB
23D23 TD 426 A Rooflight Schedule.pdf
75.4 KB
23D23 TD 440 A Grd Floor Finishes.pdf
919.9 KB
23D23 TD 441 A First Floor Floor Finishes.pdf
430.2 KB
23D23 TD 500 A Site layout.pdf
692.6 KB
23D23 TD 501 A Ramp 1.pdf
279.4 KB
23D23 TD 502 A Ramp 2.pdf
234.6 KB
23D23 TD 503 A Ramp 3.pdf
237.8 KB
23D23 TD 504 A Ramp 4.pdf
223.7 KB
23D23 TD 505 A Ramp 5.pdf
262.0 KB
23D23 TD 506 A Patio Garden.pdf
291.6 KB
23D23 TD 507 A Main Entrance ramp.pdf
313.3 KB
23D23 TD 522 A Rooflights.pdf
349.9 KB
23D23 TD 523 A External cladding, perimeter detail.pdf
251.1 KB
23D23 TD 551 A Admin Office Reception.pdf
282.2 KB
23D23 TD 552 A UAWCs 1and 2.pdf
226.3 KB
23D23 TD 553 A Female WC.pdf
431.8 KB
23D23 TD 554 A Male WC.pdf
410.9 KB
23D23 TD 555 A WC Details.pdf
303.8 KB
23D23 TD 556 A Stair 1 & 2 Refurb.pdf
331.1 KB
23D23 TD 557 A Admin Office Reception.pdf
282.2 KB
23D23 TD 700 A Reflected Ceiling Plan.pdf
725.1 KB
24-035 51(M001) - T1.pdf
2.4 MB
24-035 51(M002) - T1.pdf
1.2 MB
24-035 52(M002) - T1.pdf
1.1 MB
24-035 52(M003) - T1.pdf
1.1 MB
24-035 52(M004) - T1.pdf
796.1 KB
24-035 53(M001) - T2.pdf
1.7 MB
24-035 53(M002) - T2.pdf
1.6 MB
24-035 53(M003) - T2.pdf
1.3 MB
24-035 53(M004) - T1.pdf
1.2 MB
24-035 56(M001) - T1.pdf
2.1 MB
24-035 56(M002) - T1.pdf
2.1 MB
24-035 56(M003) - T1.pdf
1.3 MB
24-035 57(M001) - T1.pdf
1.9 MB
24-035 57(M002) - T1.pdf
1.2 MB
24-035 57(M003) - T1.pdf
1.2 MB
24-035 57(M004) - T1.pdf
954.7 KB
24-035 BW Schedule for Elec Internal Services for Tender (Rev 1), 15.07.2024.pdf
17.7 KB
24-035 BW Schedule for M&E Site Services for Tender (Rev 1), 15.07.2024.pdf
22.1 KB
24-035 BW Schedule for Mech Internal Services for Tender (Rev 1), 15.07.2024.pdf
25.9 KB
24-035 Electrical Document Register (NLN College) - T1.pdf
169.3 KB
24-035 M(S001) - T1.pdf
2.2 MB
24-035 Mechanical Document Register (NLN College) - T1.pdf
181.6 KB
24-035 Volume E1 (Particular Electrical Spec) - T1.pdf
6.6 MB
24-035 Volume E2 (Electrical Form of Tender) - T1.pdf
135.5 KB
24-035 Volume M1 (Particular Mechanical Spec) - T1.pdf
5.4 MB
24-035 Volume M2 (Mechanical Form of Tender) - T1.pdf
140.8 KB
A-03133 Survey Report (Rev 1).pdf
6.1 MB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
31.3 KB · Appendix / Annex
BMS Controls Schematic.pdf
1.3 MB
BMS Field Devices Ground Floor.pdf
1.1 MB
Cable Containment Area A.pdf
1.8 MB
Cable Containment Area B.pdf
1.5 MB
Cable Containment Area C.pdf
1.9 MB
Cable Containment Area D.pdf
1.5 MB
Electrical Schematic for Switchboards.pdf
1.5 MB
Lighting First Floor.pdf
1.0 MB
Lighting Ground Floor Area B.pdf
1.3 MB
MF-1.10-09-04-2020 (1).docx
51.1 KB
MF-1.11-09-04-2020 (1).docx
46.6 KB
MF-1.12-09-04-2020 (1).docx
68.2 KB
MF-1.13-09-04-2020 (1).docx
48.0 KB
MF-1.14-09-04-2020.docx
54.9 KB
MF-1.16-21-03-2016-REV (1).docx
56.1 KB
MF-1.4-03-08-2010-rev.docx
53.1 KB
MF-1.5-28-07-2009-rev.docx
51.4 KB
MF-1.6-09-04-2020 (1).docx
57.5 KB
Power & General Services First Floor.pdf
1.3 MB
Power & General Services Ground Floor - Area A.pdf
2.2 MB
Power & General Services Ground Floor - Area B.pdf
1.6 MB
Power & General Services Ground Floor - Area C.pdf
1.3 MB
Power & General Services Ground Floor - Area D.pdf
1.4 MB
Protective Services Area B.pdf
1.4 MB
Protective Services Area C.pdf
1.2 MB
PW-CF1-A2-09-12-2019.docx
33.8 KB
PW-CF1-A3-09-12-2019.docx
34.2 KB
PW-CF1-A5-09-12-2019.docx
37.5 KB
PW-CF1-A5.1-09-12-2019.docx
34.7 KB
PW-CF1-Agreement-A1-04-11-2009-rev.docx
36.3 KB
PW-CF1-Agreement-A4-04-11-2009-rev.docx
32.0 KB
PW-CF1-v2.8-01-05-2024-.pdf
1.3 MB
Q-2024-083 MOD DLS Tender Proposal.pdf
438.9 KB
Roof Survey - Caritas College^J Ballyfermot.pdf
3.9 MB
Underground Mech Elec Services.pdf
2.0 MB
Original notice text
The Rehab Group seeks contractors for internal and external refurbishment works at Caritas College, Ballyfermot, focusing on building, integrating, and operating specified services with compliance obligations.
AI analysis updated 4 months ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender