Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Opera C Library Book Sorter Tender
Closed Building Services & Maintenance Works Restricted

Opera C Library Book Sorter Tender

Deadline

27 Aug

Tender for the implementation and operation of a library book sorting system.

SME fit: Medium Bid effort: Medium 📍 Limerick

Tender for the implementation and operation of a library book sorting system.

Bidder profile

Mid-sized to large specialists with experience in public sector tenders and library systems.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Limerick Twenty Thirty DAC
Title Opera C Library Book Sorter Tender
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 10 years
Submission deadline 2024-08-27T15:30:00+00:00
Go-live / start not stated

2. Scope of Work

Limerick Twenty Thirty DAC ran this procurement for “Opera C Library Book Sorter Tender” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  • 7 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • The lowest MEP services shall be elevated a minimum of 500mm above finished roof level to allow non
  • The heating system shall consist of a minimum of three identical high efficiency condensing gas fired boilers
  • Hot water storage shall be stored at a minimum of 60°C with a hot water return system (legionella
  • MANUFACTURER’S QUALITY SYSTEM: Registered and certified to ISO 9001:2008 Quality
  • Registered and certified to ISO 14001 for environmental management systems
  • In accordance with ISO 15686-5:2017 “Buildings and constructed assets — Service life planning — Part 5: Life
  • ISO 14001 Environmental Management Systems certification
  • arising out of this competition the successful Candidate shall be required to supply its Tax Clearance
  • Contracting Authority. By supplying these numbers the successful Candidate acknowledges and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

    1. the programme prepared by the successful tenderer for the main contract works.
  • The Deposit3 required for tender documents as stated in the Particulars will be refundable to all
  • the agreement of the Tenderer to the [main] Contractor’s programme issued during the course

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 28 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € . Section 3: Suitability Assessment Questi
  • 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € 1,500,000.00 CA SUPPLEMENTARY REQUIREMENTS: Wh
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm
  • issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00028 Maximum level of excess for property only

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
issible excess on Professional Indemnity Insurance in any one claim below which 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 28 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
  • International Standard ISO 14025–2006, Environmental labels and declarations (Type III
  • [ITT-W8-v2.0-18-11-24.pdf] Instructions to Tenderers- Restricted Procedure for Reserved Specialists
  • [ITT-W8-v2.0-18-11-24.pdf] makes no representation, warranty, or undertaking in or in connection
  • [ITT-W8-v2.0-18-11-24.pdf] tendering purposes, or as required by law.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-08-27T15:30:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-08-27T15:30:00+00:00
Date surfaced in documents 18 November 2024
Date surfaced in documents Belden 9502
Date surfaced in documents March 2024

8. Contract terms that matter

Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € . Section 3: Suitability Assessment Questi
  • 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € 1,500,000.00 CA SUPPLEMENTARY REQUIREMENTS: Wh
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm
  • issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • 13 CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • the successful tenderer will be awarded a sub-contract by the successful tenderer for the main
  • The Contracting Authority is making these documents available to Candidates for the sub-contract

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: ITT-W8-v2.0-18-11-24.pdf, ITT-W8-v2.0-18-11-24.pdf] Instructions to Tenderers- Restricted Procedure for Reser, ITT-W8 v 2.0 18/11/2024.
  • eTenders CFT / notice reference: contract notice for the Works to etenders and, where.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT-W8 v 2.0, ITT-W8-v2.0-18-11-24.pdf] makes no representation, warranty, or undertaking in or i, ITT-W8-v2.0-18-11-24.pdf] tendering purposes, or as required by law..

Can you bid?

Required certifications

  • ISO 9001:2008
  • ISO 14001

Minimum turnover

€1,500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Qualitative assessment

Pass/Fail criteria

Lots (1)

Lot 1

Documents (136)

PDF

OPRA-ARUP-3A-XX-SH-YC-0001-BMS_Pointslist-A4-C01.pdf

1.3 MB · Specification

PDF

OPRA-ARUP-3A-XX-SP-M-0001-Mechanical_Services_Particular_Specification-A4-C02.pdf

840.6 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-M-0030-EDS_Fire_Dampers-A4-C01.pdf

131.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-M-0031-EDS_MSD-A4-C01.pdf

134.9 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-M-0032-EDS_VCD-A4-C01.pdf

147.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-M-0033-EDS_CAV-A4-C01.pdf

156.7 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0001-EDS_Air_Handling_Units-A4-C01.pdf

216.8 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0002-EDS_Ductwork-A4-C01.pdf

68.7 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0003-EDS_Thermal_Insulation-A4-C01.pdf

166.5 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0004-EDS_Fans-A4-C01.pdf

70.6 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0005-EDS_Fan_Coil_Units-A4-C01.pdf

266.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0006-EDS_Pipework-A4-C01.pdf

93.4 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0007-EDS_Grilles_and_Diffusers-A4-C01.pdf

208.6 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0008-EDS_Pumps-A4-C01.pdf

126.0 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0009-EDS_Trace_Heating-A4-C01.pdf

85.6 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0010-EDS_LTHW_Radiators_and_Trench_Heater-A4-C01.pdf

64.3 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0011-EDS_AC_Split_Units-A4-C01.pdf

131.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0012-EDS_Calorifiers-A4-C01.pdf

158.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0013-EDS_Water_Storage_Tanks-A4-C01.pdf

89.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0014-EDS_Air_and_Dirt_Separators-A4-C01.pdf

135.7 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0015-EDS_Chemical_Dosing-A4-C01.pdf

63.4 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0016-EDS_Buffer_Tanks-A4-C01.pdf

74.0 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0017-EDS_Plate_Heat_Exchanger-A4-C01.pdf

84.3 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0018-EDS_Pressurisation_Units-A4-C01.pdf

82.0 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0019-EDS_Booster_Sets-A4-C01.pdf

83.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0020-EDS_Air_Source_Heat_Pumps-A4-C01.pdf

96.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0021-EDS_DHW_Heat_Pumps-A4-C01.pdf

178.5 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0022-EDS_Heating_Coil-A4-C01.pdf

70.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0023-EDS_Heat_Recovery_Units-A4-C01.pdf

183.8 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0024-EDS_Gas_Fired_Boilers-A4-C01.pdf

182.1 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0025-EDS_VRF_System-A4-C01.pdf

139.4 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0026-EDS_LTHW_Expansion_Vessel-A4-C01.pdf

75.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0027-EDS_CHW_Expansion_Vessel-A4-C01.pdf

135.8 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0028-EDS_Attenuators-A4-C01.pdf

201.2 KB · Specification

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0029-EDS_Magnetic_Filter-A4-C01.pdf

75.7 KB · Specification

PDF

OPRA-HJL-3A4-XX-SP-A-114001-Library_RFID_Gates-A4-C02.pdf

598.9 KB · Specification

PDF

OPRA-HJL-3A4-XX-SP-A-115125-Library_Book_Sorter_System-A4-C02.pdf

692.1 KB · Specification

PDF

ITT-W8-v2.0-18-11-24.pdf

579.5 KB · RFT / Invitation to Tender

PDF

4th-Edition-Mar-2024-CIF-NN-Sub-Contract.pdf

456.6 KB · Contract / Agreement / Terms

PDF

OPRA-COGPM-CC Book Sorter SAQ.pdf

739.4 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.0-28-07-2023-2.docx

72.9 KB · Form / Declaration / Certificate

PDF

OPRA-ARUP-3A-00-DR-E-1500-Electrical_Services_Distribution_Layout-A4-C01.pdf

329.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-E-2500-Electrical_Services_Lighting_Layout-A4-C01.pdf

398.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-E-3500-Electrical_Services_Small_Power_Tel_Layout-A4-C01.pdf

498.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-E-4500-Electrical_Services_Fire_Alarm_Safety_Layout-A4-C01.pdf

441.1 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-E-5500-Electrical_Services_Security_Layout-A4-C01.pdf

510.7 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-E-6500-Electrical_Services_Lightning_Prot_Layout-A4-C01.pdf

272.7 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-M-1500-Mechanical_Services_Heating_Cooling_Layout-A4-C02.pdf

1.1 MB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-M-4500-Mechanical_Services_Ventilation_Layout-A4-C01.pdf

986.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-ME-9500-Combined_Services_Coordination_Layout_Risers-A4-C01.pdf

220.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-P-1500-Public_Health_Services_Domestic_Water_PFE_Layout-A4-C02.pdf

449.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-P-3500-Public_Health_Services_Above_Ground_Drainage_Layout-A4-C01.pdf

510.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-YC-1500-BMS_Services_Instrumentation_Layout-A4-C01.pdf

474.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-E-1500-Electrical_Services_Distribution_Layout-A4-C01.pdf

614.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-E-2500-Electrical_Services_Lighting_Layout-A4-C01.pdf

554.4 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-E-3500-Electrical_Services_Small_Power_Tel_Layout-A4-C01.pdf

415.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-E-4500-Electrical_Services_Fire_Alarm_Safety_Layout-A4-C01.pdf

353.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-E-5500-Electrical_Services_Security_Layout-A4-C01.pdf

483.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-M-1500-Mechanical_Services_Heating_Cooling_Layout-A4-C02.pdf

548.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-M-4500-Mechanical_Services_Ventilation_Layout-A4-C02.pdf

854.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-P-1500-Public_Health_Services_Domestic_Water_PFE_Layout-A4-C02.pdf

980.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-P-3500-Public_Health_Services_Above_Ground_Drainage_Layout-A4-C02.pdf

642.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-BM-DR-YC-1500-BMS_Services_Instrumentation_Layout-A4-C01.pdf

326.4 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0001-Electrical_Services_Symbols_Legend-A4-C01.pdf

112.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0002-Electrical_Services_Sch_Notes-A4-C01.pdf

100.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0700-Electrical_Services_Standard_Details-A4-C01.pdf

102.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0701-Electrical_Services_Standard_Details-A4-C01.pdf

74.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0702-Electrical_Services_Standard_Details-A4-C01.pdf

195.4 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0703-Electrical_Services_Standard_Details-A4-C01.pdf

134.8 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0704-Electrical_Services_Standard_Details-A4-C01.pdf

251.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0705-Electrical_Services_Standard_Details-A4-C01.pdf

311.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0706-Electrical_Services_Standard_Details-A4-C01.pdf

190.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0707-Electrical_Services_Standard_Details-A4-C01.pdf

185.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0708-Electrical_Services_Standard_Details-A4-C01.pdf

239.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0709-Electrical_Services_Standard_Details-A4-C01.pdf

138.8 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0710-Electrical_Services_Standard_Details-A4-C01.pdf

250.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-0711-Electrical_Services_Standard_Details-A4-C01.pdf

101.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-1301-Electrical_Services_ESB_LV_Met_Switchboard_Sch-A4-C02.pdf

104.7 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-1302-Electrical_Services_Library_Main_Switchboard_Sch-A4-C01.pdf

90.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-1303-Electrical_Services_Core_Distribution_Board_Sch-A4-C01.pdf

39.7 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-1304-Electrical_Services_Mechanical_Plant_DB_Sch-A4-C01.pdf

132.1 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-3300-Electrical_Services_ICT_Topology_Sch-A4-C01.pdf

64.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-4300-Electrical_Services_Fire_Alarm_Safety_Sch-A4-C01.pdf

59.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-4301-Electrical_Services_Control_AOV_Sch-A4-C01.pdf

65.4 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-4302-Electrical_Services_Disable_Refuge_Sch-A4-C01.pdf

45.1 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-4303-Electrical_Services_PAVA_System_Sch-A4-C01.pdf

34.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-5300-Electrical_Services_Access_Control_Sch-A4-C01.pdf

46.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-5301-Electrical_Services_CCTV_Security_Sch-A4-C01.pdf

37.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-6300-Electrical_Services_Earthing_Sch-A4-C01.pdf

104.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-E-7300-Electrical_Services_PV_System_Sch-A4-C01.pdf

38.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-0001-Mechanical_Services_Symbols_Legend-A4-C01.pdf

183.1 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-0002-Mechanical_Services_Sch_Notes-A4-C01.pdf

114.8 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-2300-Mechanical_Services_LTHW_Plant_Sch-A4-C01.pdf

172.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-2301-Mechanical_Services_LTHW_Fanc_Sch-A4-C01.pdf

196.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-2302-Mechanical_Services_LTHW_Rad_Sch-A4-C01.pdf

127.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-3300-Mechanical_Services_CHW_Plant_Sch-A4-C01.pdf

142.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-3301-Mechanical_Services_CHW_Fanc_Sch-A4-C01.pdf

195.1 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-M-4300-Mechanical_Services_Ventilation_Sch-A4-C01.pdf

196.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-ME-9600-Combined_Services_Coordination_Layout-A4-C01.pdf

410.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-ME-9601-Combined_Services_Coordination_Layout-A4-C01.pdf

302.8 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-ME-9602-Combined_Services_Coordination_Layout-A4-C01.pdf

160.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-0001-Public_Health_Services_Symbols_Legend-A4-C01.pdf

161.6 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-0002-Public_Health_Services_Sch_Notes-A4-C01.pdf

106.5 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-0700-Public_Health_Services_Standard_Details-A4-C01.pdf

137.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-1300-Public_Health_Services_Water_Sch-A4-C01.pdf

138.3 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-1301-Public_Health_Services_Water_Sch-A4-C01.pdf

130.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-1302-Public_Health_Services_Water_Sch-A4-C01.pdf

154.7 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-1303-Public_Health_Services_Natural_Gas_Sch-A4-C01.pdf

114.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-3300-Public_Health_Services_Above_Ground_Drainage_Sch-A4-C01.pdf

140.2 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-P-3301-Public_Health_Services_Above_Ground_Drainage_Sch-A4-C01.pdf

145.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-DR-YC-1300-BMS_Services_Service_Network_Sch-A4-C01.pdf

214.9 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-ZZ-SH-ME-9001-Combined_Services_Uniclass_2015_Codes_Schedule-A4-C01.pdf

108.7 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-1010-GA_Plan_Library_Level_00-A4-C01.pdf

593.5 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-1410-Floor_Finishes_Library_Level_00-A4-C01.pdf

409.1 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-1510-Wall_Finishes_Library_Level_00-A4-C01.pdf

428.2 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-1810-Reflected_Ceiling_Plans_Library_Level_00-A4-C01.pdf

459.5 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-5210-Wall_Types_Plan_Library_Level_00-A4-C01.pdf

411.7 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-6420-Book_Sorter_&_Conveyor-A4-C01.pdf

467.9 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-00-DR-A-6838-J_GF_11_Book_Sorter-A4-C01.pdf

432.1 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-B1-DR-A-1009-GA_Plan_Library_Level_B1-A4-C01.pdf

580.8 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-B1-DR-A-1409-Floor_Finishes_Library_Level_B1-A4-C01.pdf

508.7 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-B1-DR-A-1509-Wall_Finishes_Library_Level_B1-A4-C01.pdf

532.8 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A-B1-DR-A-1809-Reflected_Ceiling_Plans_Library_Level_B1-A4-C01.pdf

434.1 KB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A4-ZZ-DR-A-2002-GA_Elevations_Sheet_02-A4-C01.pdf

1.1 MB · Drawing / Plan / Layout

PDF

OPRA-HJL-3A4-ZZ-DR-A-2102-External_Envelope_Key_Elevations_Sheet_02-A4-C01.pdf

802.6 KB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-00-DR-S-1001-GA_Plan_Ground_Floor-A4-C02.pdf

959.2 KB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-00-DR-S-4005-Ground_Floor_Details_Sheet01-A4-C02.pdf

544.1 KB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-01-DR-S-1002-GA_Plan_First_Floor-A4-C02.pdf

1.2 MB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-01-DR-S-4010-First_Floor_Details_Sheet03-A4-C02.pdf

434.4 KB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-ZZ-DR-S-5036-RC_Walls_Sheet_1-A4-C02.pdf

656.8 KB · Drawing / Plan / Layout

PDF

OPRA-PUNCH-3A4-ZZ-DR-S-5043-RC_Walls_Sheet_8-A4-C02.pdf

703.0 KB · Drawing / Plan / Layout

PDF

OPRA-ARUP-3A-00-DR-ME-9900-Combined_Services_Coordination_Layout-A4-C01.pdf

5.2 MB

PDF

OPRA-ARUP-3A-BM-DR-ME-9900-Combined_Services_Coordination_Layout-A4-C02.pdf

6.6 MB

PDF

OPRA-ARUP-3A-XX-SP-E-0001-Electrical_Specification-A4-C02.pdf

11.7 MB

PDF

OPRA-ARUP-3A-XX-SP-YC-0001-Building_Controls_Specification-A4-C02.pdf

1.9 MB

PDF

OPRA-ARUP-3A-ZZ-SH-ME-0000-EDS_INDEX-A4-C01.pdf

52.2 KB · Appendix / Annex

Original notice text

This tender involves the implementation and sustained operation of a book sorting system for the Opera C Library, requiring compliance with various quality and environmental standards.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

27 Aug

View on eTenders ↗

Location

Ireland

Procedure

Restricted

Clarification

13 Aug 2024

eTenders ID

3973783

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender