Opera C Library Book Sorter Tender
Deadline
27 Aug
27 Aug 2024
Deadline
27 Aug
Tender for the implementation and operation of a library book sorting system.
Tender for the implementation and operation of a library book sorting system.
Bidder profile
Mid-sized to large specialists with experience in public sector tenders and library systems.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Limerick Twenty Thirty DAC |
| Title | Opera C Library Book Sorter Tender |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 years |
| Submission deadline | 2024-08-27T15:30:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Limerick Twenty Thirty DAC ran this procurement for “Opera C Library Book Sorter Tender” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- 7 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- The lowest MEP services shall be elevated a minimum of 500mm above finished roof level to allow non
- The heating system shall consist of a minimum of three identical high efficiency condensing gas fired boilers
- Hot water storage shall be stored at a minimum of 60°C with a hot water return system (legionella
- MANUFACTURER’S QUALITY SYSTEM: Registered and certified to ISO 9001:2008 Quality
- Registered and certified to ISO 14001 for environmental management systems
- In accordance with ISO 15686-5:2017 “Buildings and constructed assets — Service life planning — Part 5: Life
- ISO 14001 Environmental Management Systems certification
- arising out of this competition the successful Candidate shall be required to supply its Tax Clearance
- Contracting Authority. By supplying these numbers the successful Candidate acknowledges and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
-
- the programme prepared by the successful tenderer for the main contract works.
- The Deposit3 required for tender documents as stated in the Particulars will be refundable to all
- the agreement of the Tenderer to the [main] Contractor’s programme issued during the course
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 28 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € . Section 3: Suitability Assessment Questi
- 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € 1,500,000.00 CA SUPPLEMENTARY REQUIREMENTS: Wh
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm
- issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00028 Maximum level of excess for property only
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| issible excess on Professional Indemnity Insurance in any one claim below which | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- 3g EMPLOYER’S LIABILITY INSURANCE Requirement: YES Response Type: DECLARATION REQUIRED Type of Evaluation: PASS/FAIL 28 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
- International Standard ISO 14025–2006, Environmental labels and declarations (Type III
- [ITT-W8-v2.0-18-11-24.pdf] Instructions to Tenderers- Restricted Procedure for Reserved Specialists
- [ITT-W8-v2.0-18-11-24.pdf] makes no representation, warranty, or undertaking in or in connection
- [ITT-W8-v2.0-18-11-24.pdf] tendering purposes, or as required by law.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-08-27T15:30:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-08-27T15:30:00+00:00 |
| Date surfaced in documents | 18 November 2024 |
| Date surfaced in documents | Belden 9502 |
| Date surfaced in documents | March 2024 |
8. Contract terms that matter
Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € . Section 3: Suitability Assessment Questi
- 1 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: Library Equipment 24 € 1,500,000.00 CA SUPPLEMENTARY REQUIREMENTS: Wh
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Specialist Works w/Design sub-contractor € 6,500,00026 The excess as stated here: Maximum perm
- issible excess on Professional Indemnity Insurance in any one claim below which the Contractor as a Specialist Works with Design sub-contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
- 13 CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- the successful tenderer will be awarded a sub-contract by the successful tenderer for the main
- The Contracting Authority is making these documents available to Candidates for the sub-contract
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-W8-v2.0-18-11-24.pdf, ITT-W8-v2.0-18-11-24.pdf] Instructions to Tenderers- Restricted Procedure for Reser, ITT-W8 v 2.0 18/11/2024.
- eTenders CFT / notice reference: contract notice for the Works to etenders and, where.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT-W8 v 2.0, ITT-W8-v2.0-18-11-24.pdf] makes no representation, warranty, or undertaking in or i, ITT-W8-v2.0-18-11-24.pdf] tendering purposes, or as required by law..
Can you bid?
Required certifications
- ISO 9001:2008
- ISO 14001
Minimum turnover
€1,500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Qualitative assessment
Pass/Fail criteria
Lots (1)
Documents (136)
OPRA-ARUP-3A-XX-SH-YC-0001-BMS_Pointslist-A4-C01.pdf
1.3 MB · Specification
OPRA-ARUP-3A-XX-SP-M-0001-Mechanical_Services_Particular_Specification-A4-C02.pdf
840.6 KB · Specification
OPRA-ARUP-3A-ZZ-SH-M-0030-EDS_Fire_Dampers-A4-C01.pdf
131.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-M-0031-EDS_MSD-A4-C01.pdf
134.9 KB · Specification
OPRA-ARUP-3A-ZZ-SH-M-0032-EDS_VCD-A4-C01.pdf
147.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-M-0033-EDS_CAV-A4-C01.pdf
156.7 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0001-EDS_Air_Handling_Units-A4-C01.pdf
216.8 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0002-EDS_Ductwork-A4-C01.pdf
68.7 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0003-EDS_Thermal_Insulation-A4-C01.pdf
166.5 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0004-EDS_Fans-A4-C01.pdf
70.6 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0005-EDS_Fan_Coil_Units-A4-C01.pdf
266.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0006-EDS_Pipework-A4-C01.pdf
93.4 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0007-EDS_Grilles_and_Diffusers-A4-C01.pdf
208.6 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0008-EDS_Pumps-A4-C01.pdf
126.0 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0009-EDS_Trace_Heating-A4-C01.pdf
85.6 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0010-EDS_LTHW_Radiators_and_Trench_Heater-A4-C01.pdf
64.3 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0011-EDS_AC_Split_Units-A4-C01.pdf
131.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0012-EDS_Calorifiers-A4-C01.pdf
158.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0013-EDS_Water_Storage_Tanks-A4-C01.pdf
89.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0014-EDS_Air_and_Dirt_Separators-A4-C01.pdf
135.7 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0015-EDS_Chemical_Dosing-A4-C01.pdf
63.4 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0016-EDS_Buffer_Tanks-A4-C01.pdf
74.0 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0017-EDS_Plate_Heat_Exchanger-A4-C01.pdf
84.3 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0018-EDS_Pressurisation_Units-A4-C01.pdf
82.0 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0019-EDS_Booster_Sets-A4-C01.pdf
83.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0020-EDS_Air_Source_Heat_Pumps-A4-C01.pdf
96.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0021-EDS_DHW_Heat_Pumps-A4-C01.pdf
178.5 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0022-EDS_Heating_Coil-A4-C01.pdf
70.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0023-EDS_Heat_Recovery_Units-A4-C01.pdf
183.8 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0024-EDS_Gas_Fired_Boilers-A4-C01.pdf
182.1 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0025-EDS_VRF_System-A4-C01.pdf
139.4 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0026-EDS_LTHW_Expansion_Vessel-A4-C01.pdf
75.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0027-EDS_CHW_Expansion_Vessel-A4-C01.pdf
135.8 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0028-EDS_Attenuators-A4-C01.pdf
201.2 KB · Specification
OPRA-ARUP-3A-ZZ-SH-ME-0029-EDS_Magnetic_Filter-A4-C01.pdf
75.7 KB · Specification
OPRA-HJL-3A4-XX-SP-A-114001-Library_RFID_Gates-A4-C02.pdf
598.9 KB · Specification
OPRA-HJL-3A4-XX-SP-A-115125-Library_Book_Sorter_System-A4-C02.pdf
692.1 KB · Specification
ITT-W8-v2.0-18-11-24.pdf
579.5 KB · RFT / Invitation to Tender
4th-Edition-Mar-2024-CIF-NN-Sub-Contract.pdf
456.6 KB · Contract / Agreement / Terms
OPRA-COGPM-CC Book Sorter SAQ.pdf
739.4 KB · Form / Declaration / Certificate
QW-Part-2-v1.0-28-07-2023-2.docx
72.9 KB · Form / Declaration / Certificate
OPRA-ARUP-3A-00-DR-E-1500-Electrical_Services_Distribution_Layout-A4-C01.pdf
329.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-E-2500-Electrical_Services_Lighting_Layout-A4-C01.pdf
398.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-E-3500-Electrical_Services_Small_Power_Tel_Layout-A4-C01.pdf
498.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-E-4500-Electrical_Services_Fire_Alarm_Safety_Layout-A4-C01.pdf
441.1 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-E-5500-Electrical_Services_Security_Layout-A4-C01.pdf
510.7 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-E-6500-Electrical_Services_Lightning_Prot_Layout-A4-C01.pdf
272.7 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-M-1500-Mechanical_Services_Heating_Cooling_Layout-A4-C02.pdf
1.1 MB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-M-4500-Mechanical_Services_Ventilation_Layout-A4-C01.pdf
986.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-ME-9500-Combined_Services_Coordination_Layout_Risers-A4-C01.pdf
220.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-P-1500-Public_Health_Services_Domestic_Water_PFE_Layout-A4-C02.pdf
449.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-P-3500-Public_Health_Services_Above_Ground_Drainage_Layout-A4-C01.pdf
510.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-YC-1500-BMS_Services_Instrumentation_Layout-A4-C01.pdf
474.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-E-1500-Electrical_Services_Distribution_Layout-A4-C01.pdf
614.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-E-2500-Electrical_Services_Lighting_Layout-A4-C01.pdf
554.4 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-E-3500-Electrical_Services_Small_Power_Tel_Layout-A4-C01.pdf
415.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-E-4500-Electrical_Services_Fire_Alarm_Safety_Layout-A4-C01.pdf
353.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-E-5500-Electrical_Services_Security_Layout-A4-C01.pdf
483.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-M-1500-Mechanical_Services_Heating_Cooling_Layout-A4-C02.pdf
548.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-M-4500-Mechanical_Services_Ventilation_Layout-A4-C02.pdf
854.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-P-1500-Public_Health_Services_Domestic_Water_PFE_Layout-A4-C02.pdf
980.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-P-3500-Public_Health_Services_Above_Ground_Drainage_Layout-A4-C02.pdf
642.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-BM-DR-YC-1500-BMS_Services_Instrumentation_Layout-A4-C01.pdf
326.4 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0001-Electrical_Services_Symbols_Legend-A4-C01.pdf
112.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0002-Electrical_Services_Sch_Notes-A4-C01.pdf
100.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0700-Electrical_Services_Standard_Details-A4-C01.pdf
102.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0701-Electrical_Services_Standard_Details-A4-C01.pdf
74.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0702-Electrical_Services_Standard_Details-A4-C01.pdf
195.4 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0703-Electrical_Services_Standard_Details-A4-C01.pdf
134.8 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0704-Electrical_Services_Standard_Details-A4-C01.pdf
251.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0705-Electrical_Services_Standard_Details-A4-C01.pdf
311.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0706-Electrical_Services_Standard_Details-A4-C01.pdf
190.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0707-Electrical_Services_Standard_Details-A4-C01.pdf
185.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0708-Electrical_Services_Standard_Details-A4-C01.pdf
239.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0709-Electrical_Services_Standard_Details-A4-C01.pdf
138.8 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0710-Electrical_Services_Standard_Details-A4-C01.pdf
250.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-0711-Electrical_Services_Standard_Details-A4-C01.pdf
101.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-1301-Electrical_Services_ESB_LV_Met_Switchboard_Sch-A4-C02.pdf
104.7 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-1302-Electrical_Services_Library_Main_Switchboard_Sch-A4-C01.pdf
90.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-1303-Electrical_Services_Core_Distribution_Board_Sch-A4-C01.pdf
39.7 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-1304-Electrical_Services_Mechanical_Plant_DB_Sch-A4-C01.pdf
132.1 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-3300-Electrical_Services_ICT_Topology_Sch-A4-C01.pdf
64.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-4300-Electrical_Services_Fire_Alarm_Safety_Sch-A4-C01.pdf
59.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-4301-Electrical_Services_Control_AOV_Sch-A4-C01.pdf
65.4 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-4302-Electrical_Services_Disable_Refuge_Sch-A4-C01.pdf
45.1 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-4303-Electrical_Services_PAVA_System_Sch-A4-C01.pdf
34.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-5300-Electrical_Services_Access_Control_Sch-A4-C01.pdf
46.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-5301-Electrical_Services_CCTV_Security_Sch-A4-C01.pdf
37.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-6300-Electrical_Services_Earthing_Sch-A4-C01.pdf
104.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-E-7300-Electrical_Services_PV_System_Sch-A4-C01.pdf
38.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-0001-Mechanical_Services_Symbols_Legend-A4-C01.pdf
183.1 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-0002-Mechanical_Services_Sch_Notes-A4-C01.pdf
114.8 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-2300-Mechanical_Services_LTHW_Plant_Sch-A4-C01.pdf
172.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-2301-Mechanical_Services_LTHW_Fanc_Sch-A4-C01.pdf
196.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-2302-Mechanical_Services_LTHW_Rad_Sch-A4-C01.pdf
127.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-3300-Mechanical_Services_CHW_Plant_Sch-A4-C01.pdf
142.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-3301-Mechanical_Services_CHW_Fanc_Sch-A4-C01.pdf
195.1 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-M-4300-Mechanical_Services_Ventilation_Sch-A4-C01.pdf
196.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-ME-9600-Combined_Services_Coordination_Layout-A4-C01.pdf
410.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-ME-9601-Combined_Services_Coordination_Layout-A4-C01.pdf
302.8 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-ME-9602-Combined_Services_Coordination_Layout-A4-C01.pdf
160.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-0001-Public_Health_Services_Symbols_Legend-A4-C01.pdf
161.6 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-0002-Public_Health_Services_Sch_Notes-A4-C01.pdf
106.5 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-0700-Public_Health_Services_Standard_Details-A4-C01.pdf
137.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-1300-Public_Health_Services_Water_Sch-A4-C01.pdf
138.3 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-1301-Public_Health_Services_Water_Sch-A4-C01.pdf
130.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-1302-Public_Health_Services_Water_Sch-A4-C01.pdf
154.7 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-1303-Public_Health_Services_Natural_Gas_Sch-A4-C01.pdf
114.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-3300-Public_Health_Services_Above_Ground_Drainage_Sch-A4-C01.pdf
140.2 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-P-3301-Public_Health_Services_Above_Ground_Drainage_Sch-A4-C01.pdf
145.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-DR-YC-1300-BMS_Services_Service_Network_Sch-A4-C01.pdf
214.9 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-ZZ-SH-ME-9001-Combined_Services_Uniclass_2015_Codes_Schedule-A4-C01.pdf
108.7 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-1010-GA_Plan_Library_Level_00-A4-C01.pdf
593.5 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-1410-Floor_Finishes_Library_Level_00-A4-C01.pdf
409.1 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-1510-Wall_Finishes_Library_Level_00-A4-C01.pdf
428.2 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-1810-Reflected_Ceiling_Plans_Library_Level_00-A4-C01.pdf
459.5 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-5210-Wall_Types_Plan_Library_Level_00-A4-C01.pdf
411.7 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-6420-Book_Sorter_&_Conveyor-A4-C01.pdf
467.9 KB · Drawing / Plan / Layout
OPRA-HJL-3A-00-DR-A-6838-J_GF_11_Book_Sorter-A4-C01.pdf
432.1 KB · Drawing / Plan / Layout
OPRA-HJL-3A-B1-DR-A-1009-GA_Plan_Library_Level_B1-A4-C01.pdf
580.8 KB · Drawing / Plan / Layout
OPRA-HJL-3A-B1-DR-A-1409-Floor_Finishes_Library_Level_B1-A4-C01.pdf
508.7 KB · Drawing / Plan / Layout
OPRA-HJL-3A-B1-DR-A-1509-Wall_Finishes_Library_Level_B1-A4-C01.pdf
532.8 KB · Drawing / Plan / Layout
OPRA-HJL-3A-B1-DR-A-1809-Reflected_Ceiling_Plans_Library_Level_B1-A4-C01.pdf
434.1 KB · Drawing / Plan / Layout
OPRA-HJL-3A4-ZZ-DR-A-2002-GA_Elevations_Sheet_02-A4-C01.pdf
1.1 MB · Drawing / Plan / Layout
OPRA-HJL-3A4-ZZ-DR-A-2102-External_Envelope_Key_Elevations_Sheet_02-A4-C01.pdf
802.6 KB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-00-DR-S-1001-GA_Plan_Ground_Floor-A4-C02.pdf
959.2 KB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-00-DR-S-4005-Ground_Floor_Details_Sheet01-A4-C02.pdf
544.1 KB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-01-DR-S-1002-GA_Plan_First_Floor-A4-C02.pdf
1.2 MB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-01-DR-S-4010-First_Floor_Details_Sheet03-A4-C02.pdf
434.4 KB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-ZZ-DR-S-5036-RC_Walls_Sheet_1-A4-C02.pdf
656.8 KB · Drawing / Plan / Layout
OPRA-PUNCH-3A4-ZZ-DR-S-5043-RC_Walls_Sheet_8-A4-C02.pdf
703.0 KB · Drawing / Plan / Layout
OPRA-ARUP-3A-00-DR-ME-9900-Combined_Services_Coordination_Layout-A4-C01.pdf
5.2 MB
OPRA-ARUP-3A-BM-DR-ME-9900-Combined_Services_Coordination_Layout-A4-C02.pdf
6.6 MB
OPRA-ARUP-3A-XX-SP-E-0001-Electrical_Specification-A4-C02.pdf
11.7 MB
OPRA-ARUP-3A-XX-SP-YC-0001-Building_Controls_Specification-A4-C02.pdf
1.9 MB
OPRA-ARUP-3A-ZZ-SH-ME-0000-EDS_INDEX-A4-C01.pdf
52.2 KB · Appendix / Annex
Original notice text
This tender involves the implementation and sustained operation of a book sorting system for the Opera C Library, requiring compliance with various quality and environmental standards.
AI analysis updated 4 months, 1 week ago
Deadline
27 Aug
Location
Ireland
Procedure
Restricted
Clarification
13 Aug 2024
eTenders ID
3973783
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender