← Tenders / RFT - Refurbishment and Alteration of the Main Toilet and Welfare Facilities at Shannon Airport Arrivals Hall, Shannon Co. Clare
Awarded Construction & Civil Engineering Works SME Suitable Open

RFT - Refurbishment and Alteration of the Main Toilet and Welfare Facilities at Shannon Airport Arrivals Hall, Shannon Co. Clare

Value

€6.5m

Deadline

12 Aug

Refurbishment and alteration of toilet and welfare facilities at Shannon Airport.

SME fit: Medium Bid effort: Medium 📍 Clare

Refurbishment and alteration of toilet and welfare facilities at Shannon Airport.

Bidder profile

Firms with experience in public procurement and construction projects, particularly in airport or public facility refurbishments.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Airport Authority DAC
Title RFT - Refurbishment and Alteration of the Main Toilet and Welfare Facilities at Shannon Airport Arrivals Hall, Shannon Co. Clare
CPV / category works / Construction & Civil Engineering
Estimated value €6500000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2024-08-12T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for RFT - Refurbishment and Alteration of the Main Toilet and Welfare Facilities at Shannon Airport Arrivals Hall, Shannon Co. Clare. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Shannon Airport Authority DAC.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: 5% 3 Cost of Site Clearance 22 (b) (i) or (ii) €50,000 4 Minimum Sum for Employers Liability for Works Contractor, PSCS 23(d) (i) €13,000,000 Maximum excess €6,500 5 Minimum Sum for Public Liabilit; y for Works Contractor, PSCS 23(d) (ii) Minimum level of Public Liability for works up to €6,500,000 million limit Maximum excess €10,000 000,000 Maximum excess €6,500 5 Minimum Sum for Public Liabilit; y for Works Contractor, PSCS 23(d) (ii) Minimum level of Public Liability for works up to €6,500,000 million limit Maximum excess €10,000 6 Motor Insurances Motor Vehicle

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance
  • Public Liability — €6,500,000m
  • Motor — €6,500,000m
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: 5% 3 Cost of Site Clearance 22 (b) (i) or (ii) €50,000 4 Minimum Sum for Employers Liability for Works Contractor, PSCS 23(d) (i) €13,000,000 Maximum excess €6,500 5 Minimum Sum for Public Liabilit; y for Works Contractor, PSCS 23(d) (ii) Minimum level of Public Liability for works up to €6,500,000 million limit Maximum excess €10,000 000,000 Maximum excess €6,500 5 Minimum Sum for Public Liabilit; y for Works Contractor, PSCS 23(d) (ii) Minimum level of Public Liability for works up to €6,500,000 million limit Maximum excess €10,000 6 Motor Insurances Motor Vehicle

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Motor Insurances Motor Vehicle 5 not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2024-08-12T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): RFT main document (filename not stated), Suitability criteria attachment (filename not stated)
  • eTenders CFT ID: not stated
  • Clarification contact / portal: not stated
  • Priority attachments: RFT main document (filename not stated), Suitability criteria attachment (filename not stated), Pricing schedule attachment (filename not stated)

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Shannon Airport Terminal WC and Accessibility Facilities Upgrade Works

Upgrade of toilet and accessibility facilities at Shannon Airport Terminal.

Documents (4)

XLSX

SAA Terminal Toilet upgrade - Schedule of Rates.xlsx

25.3 KB · Pricing / BOQ / Schedule of Rates

DOCX

11968 - SAA Terminal Toilet Upgrade - Form of Tender.docx

20.9 KB · Form / Declaration / Certificate

PDF

11968 - SAA Terminal Toilet Upgrade - Form of Tender.pdf

285.7 KB · Form / Declaration / Certificate

PDF

24112_5005_0_Plan_Partition Types_Welfare Facilities..pdf

733.1 KB · Drawing / Plan / Layout

Original notice text

This tender involves the refurbishment and alteration of the main toilet and welfare facilities at Shannon Airport's arrivals hall, ensuring compliance with quality and administrative requirements.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€6.5m

Deadline

12 Aug

View on eTenders ↗

Location

Shannon Airport, Arrivals Hall, Shannon, Co. Clare.

Procedure

Open

Clarification

02 Aug 2024

eTenders ID

3956144

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender