Railway Road Playground Refurbishment Stranorlar, Co. Donegal for Donegal County Council
Deadline
30 Jul
30 Jul 2024
Deadline
30 Jul
Refurbishment of Railway Road Playground in Stranorlar, Co. Donegal
Refurbishment of Railway Road Playground in Stranorlar, Co. Donegal
Bidder profile
Mid-sized to large firms with experience in public sector playground projects and a strong compliance framework.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Donegal County Council_1193 |
| Title | Railway Road Playground Refurbishment Stranorlar, Co. Donegal for Donegal County Council |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 7 years |
| Submission deadline | 2024-07-30T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Donegal County Council_1193 ran this procurement for “Railway Road Playground Refurbishment Stranorlar, Co. Donegal for Donegal County Council” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Where the estimated value of the contract is above €5m (Services) and €15m (Works) ↑
- [Volume D Guidance for Tenderer's Quality Submission Railway Road Playground.pdf] Community Development & Planning Services Directorate
- programme information provided with logical sequence of operations,
- information provided with logical sequence of operations, timescales, and
-
- It has not been guilty of serious misinterpretation in supplying the information required for the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria, 1. Yes [ ] No [ ]
-
- It has been able, without delay, to submit the supporting documents required by a contracting authority or contracting entity, and 1. Yes [ ] No [ ]
-
- As defined in Article 1 of the Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15). ↑
- [Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx] Entry / NA
-
- This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certificate of Satisfactory Certificate where PSCS Services were provided. ↑ Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Existing street light to be removed
- Site specific risks and constraints (e.g., working within the existing
- Question 2: Programme & Methodology (Maximum Mark Available: 20)
- Provide methodologies and an outline Programme of Works demonstrating how you intend to
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
- Certifications — not specified for this tender
- Past experience — The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € [18] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
- Maximum excess for Public liability: €10,000~~[10]~~ in respect of p
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Playground Construction[16] € 200,000.00 CA SUPPLEMENTARY REQUIREMENTS: Co
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € [18] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|
- The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated | e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated | | The assessment of Contractor’s Quality Submission will equate to a maximum 30% o | 30% | not stated | not stated | | The assessment of a Tenderers Price Score will equate to a maximum 70% of the ov | 70% | not stated | not stated | | 33.33% of Quality Score | 33.33% | not stated | not stated | | 33.33% of Quality Score | 33.33% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
- This project number must correspond to the project number given in Appendix B1
- [2023016-04-003 Proposed Site Clerance -v1.0.pdf] Railway Road
- [2023016-04-003 Proposed Site Clerance -v1.0.pdf] to be incorporated into new ramp
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-07-30T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-07-30T11:00:00+00:00 |
| Date surfaced in documents | 24 October 2008 |
| Date surfaced in documents | 22 July 2003 |
| Date surfaced in documents | 13 June 2002 |
8. Contract terms that matter
Contract duration in the extract: 7 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- Minimum amount for interim payments, except release of retention, € 1,000.00 [14]
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- Minimum amount for interim payments, except release of retention, € 1,000
- nderers shall demonstrate that the proposed Director and Project Manager have a minimum of 7 years relevant experience in the delivery of playground projects of similar scale and complexity including the installation of playground equipment and wet pour safety surfacing
- ia, tenderers shall demonstrate that the proposed Site Agent and Foreman have a minimum of 7 years relevant experience in the delivery of playground projects of similar scale and complexity including the installation of playground equipment and wet pour safety surfacing
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: not later than 5 days after the date agreed between the
- Within 14 days of receipt of the payment claim notice
- pay the amount due on the invoice within 21 days after receiving the invoice
- If, within 14 days of the issue of the certificate of Subs
- 3 within 21 days after receiving the invoice [less any a
TENDER DOCUMENTS [2023016-04-003 Proposed Site Clerance -v1.0.pdf, 2023016-04-003 Proposed Site Clerance -v1.0.pdf, Volume D Guidance for Tenderer's Quality Submission Railway Road Playground.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: 2023016-04-006 Proposed foundation details-v0.2.pdf, 2023016-04-004 Proposed site layout-v0.2.pdf, 2023016-04-001 Site Location & Extents.pdf.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€200,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Scoring
Most Economically Advantageous Tender
Documents (26)
2023016-04-001 Site Location & Extents.pdf
6.0 MB
2023016-04-002 Existing Site Layout -v1.0.pdf
1.3 MB
2023016-04-003 Proposed Site Clerance -v1.0.pdf
1.3 MB
2023016-04-004 Proposed site layout-v0.2.pdf
1.4 MB
2023016-04-005 Foundation wall details-v0.2.pdf
509.2 KB
2023016-04-006 Proposed foundation details-v0.2.pdf
620.7 KB
2023016-04-007 Ramp and fence details-v2.1 JD.pdf
546.4 KB
2023016-04-008 1.8m Wall details .pdf
550.5 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
39.1 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
31.3 KB
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
26.0 KB
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
25.6 KB
Appendix-E-Declaration-in-relation-to-Russian-Sanctions.docx
24.0 KB
ITTW2 Instructions to Tenderers Railway Road Playground.pdf
833.6 KB
Preliminary S&H Plan Railway Road.pdf
3.1 MB
PW-CF5 Contract (v2.8 01.05.2024).pdf
1.2 MB
QW2 Suitability Assessment Part 1 Railway Road Playground.docx
189.9 KB
QW2 Suitability Assessment Part 2 Railway Road Playground.docx
69.8 KB
QW2 Supplement 3.4.1 HS Works Contractor.docx
47.7 KB
QW2 Supplement 3.4.2 HS PSCS.docx
43.6 KB
Volume A Works Requirements Railway Road Playground Revision B.pdf
1.9 MB
Volume A Works Requirements Railway Road Playground.pdf
1.9 MB
Volume B Tender & Schedule Railway Road Playground.docx
99.4 KB
Volume C Pricing Document Railway Road Playground v1.2.xlsx
256.0 KB
Volume C Pricing Document Railway Road Playground v1.3 Revision B.xlsx
256.0 KB
Volume D Guidance for Tenderer's Quality Submission Railway Road Playground.pdf
1.1 MB
Original notice text
This tender involves the refurbishment of the Railway Road Playground in Stranorlar, Co. Donegal, requiring construction, integration, and operational services over a 7-year contract period.
AI analysis updated 4 months ago
Deadline
30 Jul
Buyer
Donegal County CouncilLocation
Railway Road Playground, Stranorlar, Co. Donegal, Ireland
Procedure
Open
Clarification
19 Jul 2024
eTenders ID
3877038
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender