Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Development Works at NZEB Centre, Collooney - SIUF
Awarded Construction & Civil Engineering Works Open

Development Works at NZEB Centre, Collooney - SIUF

Value

€1.9m

Deadline

26 Jul

Development works at NZEB Centre in Collooney for Mayo Sligo and Leitrim ETB

SME fit: Medium Bid effort: Medium 📍 Sligo

Development works at NZEB Centre in Collooney for Mayo Sligo and Leitrim ETB

Bidder profile

Ideal for firms experienced in public procurement and construction projects, with strong compliance and insurance capabilities.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mayo Sligo and Leitrim ETB
Title Development Works at NZEB Centre, Collooney - SIUF
CPV / category works / Construction & Civil Engineering
Estimated value €1900000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Applicant Entry
Contract length not stated
Submission deadline 2024-07-26T10:00:00+00:00
Go-live / start Applicant Entry Date of Substantial Completion of the Works: Applicant Entry

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Development Works at NZEB Centre, Collooney - SIUF. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Mayo Sligo and Leitrim ETB.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor and as PSCS € 750,00019 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00021 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — turnover, or €5,000.
  • Insurance
  • Public Liability — €6,500,00021M
  • Employer's Liability — €13,000,00022
  • Professional Indemnity — €750,00019
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for Works Contractor and as PSCS € 750,00019 The excess as stated here: Maximum perm; issible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00021 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2024-07-26T10:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 6737 M201 Heating Services - First Floor.pdf, 23051-MA-XX-XX-DR-0001-PL-P01-Ordnance Survey Map.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: 6737 M201 Heating Services - First Floor.pdf, 23051-MA-XX-XX-DR-0001-PL-P01-Ordnance Survey Map.pdf, 6737 E800A - LV Schematic.pdf

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€5,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€750,000

Scoring

Most Economically Advantageous Tender

Documents (111)

PDF

23035 - Fire Safety Certificate Report - NZEB Training Centre Sligo.pdf

424.4 KB

PDF

23035-D01.pdf

278.2 KB

PDF

23035-D02.pdf

663.4 KB

PDF

23035-D03.pdf

264.7 KB

PDF

23035-D04.pdf

269.0 KB

PDF

23035-F01.pdf

801.6 KB

PDF

23035-F02.pdf

303.2 KB

PDF

23035-F03.pdf

897.9 KB

PDF

23035-F04.pdf

267.6 KB

PDF

23035-F05.pdf

386.4 KB

PDF

23051-MA-01-XX-HS-A-XXXX-D2-P01-Preliminary Health & Safety Plan.pdf

1.3 MB

PDF

23051-MA-01-XX-SF-A-XXXX-D2-P01-Safety File Checklist.pdf

560.7 KB

PDF

23051-MA-01-XX-SP-A-XXXX-D2-P01-Main Architectural Specification.pdf

1.0 MB

PDF

23051-MA-XX-XX-DR-0001-PL-P01-Ordnance Survey Map.pdf

4.4 MB

PDF

23051-MA-XX-XX-DR-0002-PL-P01-Ordnance Survey Map.pdf

511.3 KB

PDF

23051-MA-XX-XX-DR-0003-PL-P01-Existing Site Layout.pdf

451.6 KB

PDF

23051-MA-XX-XX-DR-0004-PL-P01-Proposed Site Layout.pdf

473.5 KB

PDF

23051-MA-XX-XX-DR-0005-PL-P01-Steeltech Shed.pdf

387.7 KB

PDF

23051-MA-XX-XX-DR-0006-PL-P01- Signage.pdf

591.5 KB

PDF

23051-MA-XX-XX-DR-0007-PL-P01-Tank Enclolsure.pdf

530.8 KB

PDF

23051-MA-XX-XX-DR-1103-PL-P01-Existing Floor Plans.pdf

2.3 MB

PDF

23051-MA-XX-XX-DR-1104-PL-P01-Demolition Plans.pdf

676.3 KB

PDF

23051-MA-XX-XX-DR-1202-PL-P01-Proposed Floor Plans.pdf

967.6 KB

PDF

23051-MA-XX-XX-DR-2003-PL-P01-Proposed Elevations & Sections.pdf

2.5 MB

PDF

23051-MA-XX-XX-DR-2004-PL-P01- Existing Elevations & Section.pdf

3.1 MB

PDF

23051-MA-XX-XX-DR-2005-PL-P01-Demolition Elevations & Section.pdf

3.2 MB

PDF

23051-MA-XX-XX-DR-A-0001-D1-P01-PROPOSED SITE LAYOUT.pdf

609.4 KB

PDF

23051-MA-XX-XX-DR-A-0002-D1-P01-LPG & SKIP ENCLOSURE.pdf

540.2 KB

PDF

23051-MA-XX-XX-DR-A-0003-D1-P01-EXISTING SITE LAYOUT.pdf

586.4 KB

PDF

23051-MA-XX-XX-DR-A-0005-D1-P01-STEELTECH SHED.pdf

387.7 KB

PDF

23051-MA-XX-XX-DR-A-0006-D1-P01- SIGNANGE.pdf

591.5 KB

PDF

23051-MA-XX-XX-DR-A-1101-D1-P01-EXISTING FLOOR PLANS.pdf

226.6 KB

PDF

23051-MA-XX-XX-DR-A-1102-D1-P01-DEMOLITION PLANS.pdf

214.1 KB

PDF

23051-MA-XX-XX-DR-A-1201-D1-P01-PROPOSED FLOOR PLANS.pdf

1.4 MB

PDF

23051-MA-XX-XX-DR-A-1301-D1-P01-PROPOSED REFLECTED CEILING PLANS.pdf

294.1 KB

PDF

23051-MA-XX-XX-DR-A-1401-D1-P01-PROPOSED FLOOR FINISHES PLANS.pdf

1.2 MB

PDF

23051-MA-XX-XX-DR-A-1601-D1-P01-PROPOSED WALL TYPE PLANS.pdf

517.0 KB

PDF

23051-MA-XX-XX-DR-A-2001-D1-P01-EXISTING ELEVATIONS & SECTIONS.pdf

214.4 KB

PDF

23051-MA-XX-XX-DR-A-2002-D1-P01-PROPOSED ELEVATIONS & SECTIONS.pdf

682.1 KB

PDF

23051-MA-XX-XX-DR-A-4001-D1-P01-BALUSTRADE DETAILS.pdf

376.7 KB

PDF

23051-MA-XX-XX-DR-A-5001-D1-P01-STAIR CORE A DETAILS.pdf

308.3 KB

PDF

23051-MA-XX-XX-DR-A-5002-D1-P01-STAIR CORE B DETAILS.pdf

307.7 KB

PDF

23051-MA-XX-XX-DR-A-6001-D1-P01-EXTERNAL WINDOW & DOOR SCHEDULE.pdf

434.5 KB

PDF

23051-MA-XX-XX-DR-A-6002-D1-P02-INTERNAL DOOR & SCREEN SCHEDULE.pdf

623.1 KB

PDF

23051-MA-XX-XX-DR-A-7001-D1-P01-PLAN & SECTION OF VENTILATION RIGS.pdf

165.1 KB

PDF

23051-MA-XX-XX-DR-A-7002-D1-P01-ELEVATION OF VENTILATION RIGS.pdf

239.8 KB

PDF

23051-MA-XX-XX-DR-A-7003-D1-P01-VENTILATION BAYS PLAN & SECTION.pdf

152.5 KB

PDF

23051-MA-XX-XX-DR-A-7004-D1-P01-VENTILATION BAYS FITOUT.pdf

956.6 KB

PDF

23051-MA-XX-XX-DR-A-7005-D1-P01-AIR TIGHTNESS CLASSROOM FLOOR PLAN.pdf

256.2 KB

PDF

23051-MA-XX-XX-DR-A-7006-D1-P01-AIR TIGHTNESS CLASSROOM ELEVATIONS 1&2.pdf

228.5 KB

PDF

23051-MA-XX-XX-DR-A-7007-D1-P01-AIR TIGHTNESS CLASSROOM ELEVATIONS 3&4.pdf

250.0 KB

PDF

23051-MA-XX-XX-DR-A-7008-D1-P01-RETROFIT WALL TYPES.pdf

174.6 KB

PDF

23051-MA-XX-XX-IS-A-XXXX-D2-P01-Tender Issue Sheet-2024-06-24.pdf

135.5 KB

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

51.7 KB

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

47.1 KB

DOCX

3.4.3-HS-Works-Specialist-with-Design-v3.0-28-07-2023.docx

47.4 KB

PDF

6737 - Lift Specification.pdf

701.8 KB

PDF

6737 - Mechanical Pricing Document.pdf

419.3 KB

PDF

6737 - Mechanical Specification.pdf

1.1 MB

PDF

6737 BLD100 Site Plan - Builders Work.pdf

589.2 KB

PDF

6737 BLD101 Ground Floor - Builders Work.pdf

476.9 KB

PDF

6737 BLD102 First Floor - Builders Work.pdf

376.0 KB

PDF

6737 E100 Site Plan.pdf

739.5 KB

PDF

6737 E200 Ground Floor - Lighting.pdf

786.2 KB

PDF

6737 E201 First Floor - Lighting.pdf

808.7 KB

PDF

6737 E300 Ground Floor - Power & General Services.pdf

642.9 KB

PDF

6737 E301 First Floor - Power & General Services.pdf

597.3 KB

PDF

6737 E400 Ground Floor - Life Protection.pdf

630.6 KB

PDF

6737 E401 First Floor - Life Protection.pdf

484.0 KB

PDF

6737 E500 Ground Floor - Security & Access Control.pdf

502.9 KB

PDF

6737 E501 First Floor - Security & Access Control.pdf

334.1 KB

PDF

6737 E600 Ground Floor - Containment.pdf

499.5 KB

PDF

6737 E601 First Floor - Containment.pdf

395.9 KB

PDF

6737 E800A - LV Schematic.pdf

331.8 KB

PDF

6737 E800B - LV Schematic.pdf

347.7 KB

PDF

6737 Electrical Pricing Document.pdf

345.0 KB

PDF

6737 Electrical Specification.pdf

992.0 KB

PDF

6737 M100 Site Plan.pdf

500.6 KB

PDF

6737 M200 Heating Services - Ground Floor.pdf

1.1 MB

PDF

6737 M201 Heating Services - First Floor.pdf

718.2 KB

PDF

6737 M300 Water Services - Ground Floor.pdf

400.0 KB

PDF

6737 M400 Ventilation - Ground Floor.pdf

795.5 KB

PDF

6737 M401 Ventilation - First Floor.pdf

321.5 KB

PDF

6737 M500 Soils & Wastes and Fire Protection - Ground Floor.pdf

413.8 KB

PDF

6737 M501 Soils & Wastes and Fire Protection - First Floor.pdf

342.9 KB

PDF

6737 M900 BMS Schematic.pdf

218.7 KB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

41.2 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

34.7 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

29.4 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

29.0 KB

DOCX

Appendix-C-Bankers-Letter.docx

33.3 KB

DOCX

Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx

36.6 KB

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

30.2 KB

DOCX

Appendix-E-Declaration-in-relation-to-Russian-Sanctions.docx

27.4 KB

DOCX

Appendix-F-Declaration-re-International-Procurement-Instrument.docx

26.3 KB

PDF

Builders Work Schedule.pdf

59.7 KB

PDF

DAC Report 23035 (issued).pdf

434.3 KB

PDF

ITT-W2-v2.5-01-08-2023-1.pdf

349.4 KB

PDF

MSL-JQA-GEN-SS-5000_(P01) Structural Specification.pdf

581.8 KB

PDF

MSL-JQA-S-102.pdf

547.6 KB

PDF

MSL-JQA-ST-100.pdf

422.1 KB

PDF

MSL-JQA-ST-101.pdf

279.7 KB

PDF

MSL-JQA-ST-102.pdf

339.5 KB

XLSX

Note for Use of MS Excel File.xlsx

28.3 KB

DOCX

PW-CF5-A2-09-12-2019.docx

37.2 KB

PDF

PW-CF5-v2.8-01-05-2024-1.pdf

1.2 MB

DOCX

QW-Part-2-v1.0-28-07-2023-2.docx

73.0 KB

PDF

QW2-Part-1-v2.0-28-07-2023-1.pdf

620.9 KB

PDF

Volume B - Tender & Schedule.pdf

763.2 KB

PDF

Volume C - Pricing Document.pdf

2.6 MB

XLSX

W1111 New Training Centre Collooney.xlsx

186.9 KB

Original notice text

This tender involves development works at the NZEB Centre in Collooney, focusing on compliance with public procurement standards and quality specifications.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€1.9m

Deadline

26 Jul

View on eTenders ↗

Location

NZEB Centre, Collooney, Sligo

Procedure

Open

Clarification

19 Jul 2024

eTenders ID

3872450

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender