FIRE DOOR UPGRADE for Royal Victoria Eye and Ear Hospital
Value
€870k
Deadline
23 Jul
23 Jul 2024
Value
€870k
Deadline
23 Jul
Fire door upgrade project for Royal Victoria Eye and Ear Hospital over 15 years
Fire door upgrade project for Royal Victoria Eye and Ear Hospital over 15 years
Bidder profile
Mid-sized to large firms with experience in public sector tenders and fire safety upgrades.
Risks & flags
- High turnover requirement
- Long contract duration
- Complex compliance requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Royal Victoria Eye and Ear |
| Title | FIRE DOOR UPGRADE for Royal Victoria Eye and Ear Hospital |
| CPV / category | works |
| Estimated value | 870000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 15 years |
| Submission deadline | 2024-07-23T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Royal Victoria Eye and Ear ran this procurement for “FIRE DOOR UPGRADE for Royal Victoria Eye and Ear Hospital” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- onents and sections of AHUs) states “if a single stage filter system is used, a minimum of filter class F7
- Internal Timber Door hardware systems
- expected of properly qualified persons providing works, services or supply comparable in value, size,
- [4. MF1_12_Collateral Warranties.pdf] properly qualified persons providing works, services or supply comparable in value, size,
- The Specialist shall pay and indemnify the Employer against all royalties and other sums for the supply
- the successful Tenderer shall be required to supply its Tax Clearance Access
- status by the Employer. By supplying these numbers the successful Tenderer
- 2B submitted with its Tender that the parent company will supply a parent Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- ● Patients with ≥2 weeks of neutropenia or with a history of IA
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 1b are left in or deleted the default text for the sub-clause is “The Specialist shall maintain professional indemnity insurance in the amount of at least €6,500,000.00 on an annual aggregate limit until a dat; 9 Provision of Public Liability Insurance (€13.5M
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[17] € 3.00m CA SUPPLEMENTARY REQUIREMENTS:; 0 28/07/2023 Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category17 € 3.00m CA SUPPLEMENTARY REQUIREMENTS:
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 1b are left in or deleted the default text for the sub-clause is “The Specialist shall maintain professional indemnity insurance in the amount of at least €6,500,000.00 on an annual aggregate limit until a dat
- 9 Provision of Public Liability Insurance (€13.5M
- 10 Provision of Employers Liability Insurance (€13.5M
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[17] € 3.00m CA SUPPLEMENTARY REQUIREMENTS:
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 1.50m[19] The excess as st
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| ated here: Maximum permissible excess on Professional Indemnity In 2% not stated not stated | |||
| 0 28/07/2023 Maximum permissible excess on Professional Indemnity Insurance in a | 2% | not stated | not stated |
| e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated |
| We have bond facilities in place which would enable us to act as sureties on you | not stated | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Appendix H: ISO 16890 - Air Filters for General Ventilation
- [Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (1).docx] [On Surety’s letterhead]
-
- we meet any other requirements set out in criterion 3.3h of the relevant Suitability Assessment Questionnaire issued in connection with the above contract.
- We have bond facilities in place which would enable us to act as sureties on your behalf in relation to the above contract, the amount of the performance bond to be not more than _____% of the eventual contract sum and meeting any supplementary requirements set out in criterion 3.3h of the relevant Suitability Assessment Questionnaire as required by the contract.
- [Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (1).docx] Contracting Authority]*
- [4. MF1_12_Collateral Warranties.pdf] MF 1.12 02/06/10
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-07-23T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-07-23T11:00:00+00:00 |
| Date surfaced in documents | 7 January 2022 |
| Date surfaced in documents | March 2021 |
| Date surfaced in documents | August 2021 |
8. Contract terms that matter
Contract duration in the extract: 15 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- IT IS AGREED as follows in consideration of the payment of €1 by the Employer to the Specialist (receipt of
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- short time span, thus multiple samples will be required weekly for a minimum of four weeks in order
- short time span, thus multiple samples will be required weekly for a minimum of four weeks in order to establish a true
- cluded on each B2 form (a combination of smaller works contracts to satisfy the minimum requirements in terms of value, nature and complexity cannot be used as evidence and will not be acceptable)
- Minimum amount for interim payments, except release of retention, € 0
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (1).docx, Name of Surety
[Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (1).docx, 4. MF1_12_Collateral Warranties.pdf.
- eTenders CFT / notice reference: contract notice for the Works to etenders and where.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: DW22165_Instructions To Tenderers.pdf, RVHFDS-RAU-HC-B1-DR-AR-05.0510.pdf, Schedule and.
Can you bid?
Required certifications
- EN 779
- ISO 16890
Minimum turnover
€3,000,000
Public liability insurance
€13,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Documents (55)
1. PW-CF5-v2.8-01-05-2024.pdf
1.2 MB
2. Bond_MF1_6 (4).pdf
145.7 KB
23164-MCE-ZZ-00-DR-E-5000 - T02.pdf
372.2 KB
23164-MCE-ZZ-01-DR-E-5000.pdf
271.3 KB
23164-MCE-ZZ-02-DR-E-5000 - T02.pdf
219.7 KB
23164-MCE-ZZ-LG-DR-E-5000 - T02.pdf
579.9 KB
23164_Electrical Pricing Schedule.pdf
533.8 KB
3. PSCS_MF1_10 (8).pdf
142.7 KB
3.4.1-HS-Works-Contractor-v3.0-28-07-2023 (1).docx
48.7 KB
3.4.2-HS-PSCS-v3.0-28-07-2023 (1).docx
44.4 KB
4. MF1_12_Collateral Warranties.pdf
169.7 KB
5. Rates of Pay_MF1.13-27-06-18.pdf
50.4 KB
6. Unfixed Bond_MF1_14 (1).pdf
145.9 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57 (1).docx
37.8 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE (1).docx
31.3 KB
Appendix-B2-Certificate-of-Satisfactory-Project-Execution (1).docx
26.0 KB
Appendix-C-Bankers-Letter (1).docx
29.9 KB
Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond (1).docx
33.2 KB
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond (1).docx
26.8 KB
Appendix-E-Declaration-in-relation-to-Russian-Sanctions (1).docx
24.0 KB
Appendix-F-Declaration-re-International-Procurement-Instrument (1).docx
22.9 KB
Asbestos Register of the Royal Victoria Eye and Ear Hospital.docx
742.0 KB
DW22165_Instructions To Tenderers.pdf
1.2 MB
DW22165_Invitation_to_Tender.pdf
63.3 KB
DW22165_Volume B_Form of Tender and Schedule.pdf
1.2 MB
DW22165_Volume C Pricing Document_BoQ.pdf
1.9 MB
Fire doors Schedule T02.pdf
111.3 KB
NG Prev of Nosocomial Aspergillosis.pdf
577.6 KB
QW-Part-2-v1.0-28-07-2023-2 (1).docx
70.0 KB
QW2-Part-1-v2.0-28-07-2023-1.docx
188.9 KB
QW2-Part-1-v2.0-28-07-2023-1.pdf
619.3 KB
RVHFDS-05-HC-XX-DR-RAU-AR-0599 - Phase 1 - All Plans Summary.pdf
588.7 KB
RVHFDS-RAU-HC-00-DR-AR-05.0520.pdf
479.3 KB
RVHFDS-RAU-HC-01-DR-AR-05.0530.pdf
377.7 KB
RVHFDS-RAU-HC-02-DR-AR-05.0540.pdf
345.3 KB
RVHFDS-RAU-HC-B1-DR-AR-05.0510.pdf
962.2 KB
RVHFDS-RAU-HC-B1-DR-AR-91.9100.pdf
995.4 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3001.pdf
658.0 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3002.pdf
829.5 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3003.pdf
768.4 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3004.pdf
825.7 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3005.pdf
812.6 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3006.pdf
1020.3 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3007.pdf
834.7 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3008.pdf
721.8 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3009.pdf
1.1 MB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3011.pdf
919.6 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3012.pdf
919.7 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3013.pdf
1012.0 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3014.pdf
975.0 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3015.pdf
840.4 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3016.pdf
413.3 KB
RVHFDS-RAU-HC-ZZ-SH-AR-30.3017.pdf
1.1 MB
RVHFDS-RAU-HC-ZZ-SH-AR-30.4001.pdf
305.0 KB
RVHFDS-ZZ-HC-ZZ-SW-RAU-AR-9001 - Scope of Works Rev2.pdf
239.7 KB
Original notice text
This tender involves the upgrade of fire doors at the Royal Victoria Eye and Ear Hospital, focusing on compliance and operational efficiency over a long-term contract.
AI analysis updated 4 months, 1 week ago
Value
€870k
Deadline
23 Jul
Location
Royal Victoria Eye and Ear Hospital, Ireland
Procedure
Open
Clarification
02 Jul 2024
eTenders ID
3775924
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender