← Tenders / Seaview Coastal Protection Works 2024
Awarded Construction & Civil Engineering Works Open

Seaview Coastal Protection Works 2024

Deadline

05 Jul

Coastal protection works at Seaview, Co. Wexford over 2 months

SME fit: Medium Bid effort: Medium 📍 Wexford

Coastal protection works at Seaview, Co. Wexford over 2 months

Bidder profile

Mid-sized to large firms with experience in public sector coastal protection projects and established compliance processes.

Risks & flags

  • Undisclosed contract value
  • Qualification gate may limit bidders
  • Two-step tender process increases compliance burden

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Wexford County Council
Title Seaview Coastal Protection Works 2024
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Bastardstown (Seaview), Co. Wexford
Contract length 2 months
Submission deadline 2024-07-05T15:00:00+00:00
Go-live / start not stated

2. Scope of Work

Wexford County Council ran this procurement for “Seaview Coastal Protection Works 2024” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 6 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • The AIA comprised systematic visual inspection and sample metal-detection of the
  • Service of the Department of Housing, Local Government, and Heritage (DHLGH).
  • Differential Geographic Positioning System
  • present-day, with road/trackways and surrounding field-systems retaining a similar layout
  • Sites and Monuments Record (SMR) files, maintained by the National Monuments Service at
  • shipwreck events recorded in Ireland since records began to be made systematically since c.
  • 1750 AD.3 It does not claim to represent a systematic record of wrecking prior to this date.
  • [ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf] not claim to represent a systematic record of wrecking prior to this date. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • existing cliff-face and safeguard a series of properties that are situated close to the shoreline
  • East-facing view along existing rock-armour protection at Seaview, placed
  • the existing cliff-face to prevent further erosion to the upper foreshore; ITM 502547E, 652177N
  • 300m section of rock-armour revetment, installed to protect the existing access-road to a

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; fessional Indemnity Insurance required for Works Contractor and as PSCS € N/A18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00020 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — Employer’s Liability Insurance Requirements 20 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • fessional Indemnity Insurance required for Works Contractor and as PSCS € N/A18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor and as PSCS will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,00020 Maximum level of excess for property only* for any one incident below which the Works Contractor and as PSCS will bear the cost: € 10,000 *No excess is permitted in respect of de
  • Employer’s Liability Insurance Requirements 20 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
  • 0 28/07/2023 Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,00021 Entitles issuing employer’s liability in
  •  Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
fessional Indemnity Insurance required for Works Contractor and as PSCS € N/A18 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • CVs are to include details of experience for a minimum of three projects of a similar nature and
  • CVs are to include of experience for a minimum of three projects of a similar nature and complexity
  • [ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf] Archaeological Impact Assessment (AIA)
  • [ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf] Conclusion
  • [ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf] measures undertaken in 2017, comprising

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-07-05T15:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-07-05T15:00:00+00:00
Date surfaced in documents Works 2024
Date surfaced in documents Natura 2000
Date surfaced in documents September 2018

8. Contract terms that matter

Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 10 CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • Minimum amount for interim payments, except release of retention, € 0
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • the date 10 days before the last day for receipt of the
  • (east terminus) to ITM 504292E 651252N (west terminus) (Figure 2). A rock-armour faced
  • [ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf] (east terminus) to ITM 504292E 651252N (west terminus) (Figure 2). A rock-armour faced

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf, 22643-MWP-XX-XX-DR-C-1104-P01-Proposed Works-Works Area 02-Sheet 2 of 2.pdf, Schedule and.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix/Schedule documents referenced in the source pack.

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Scoring

Lowest Price

Documents (31)

PDF

220530_Seaview_MWP_Profiles_Overview.pdf

468.7 KB

PDF

22643-MWP-X-XX-GE-V-6008-P03 Seaview EIA Screening 06122023.pdf

1.3 MB

PDF

22643-MWP-XX-XX-CT-C-6101-P01 PHSP.pdf

836.3 KB

PDF

22643-MWP-XX-XX-CT-C-6102-P01 DRA.pdf

225.8 KB

PDF

22643-MWP-XX-XX-CT-C-6102-P01 DRAR .pdf

293.6 KB

PDF

22643-MWP-XX-XX-CT-C-6103-P01 (3.4.1-HS).pdf

226.8 KB

PDF

22643-MWP-XX-XX-CT-C-6103-P01 (3.4.2-HS-PSCS).pdf

273.4 KB

PDF

22643-MWP-XX-XX-CT-C-6103-P01 QW2-Part 1.pdf

614.5 KB

DOCX

22643-MWP-XX-XX-CT-C-6103-P01 QW2-Part 2.docx

70.1 KB

PDF

22643-MWP-XX-XX-CT-C-6104-P01-ITT (W2-v2.5-01-08-2023-1).pdf

346.2 KB

PDF

22643-MWP-XX-XX-CT-C-6105-P01 (Volume A-WR).pdf

720.9 KB

PDF

22643-MWP-XX-XX-CT-C-6106-P01- FTS-5 (v2.6-17-07-2023-1).pdf

461.4 KB

XLSX

22643-MWP-XX-XX-CT-C-6107-P02 (Vol C-PD).xlsx

43.1 KB

PDF

22643-MWP-XX-XX-CT-C-6108-P01 (Volume D-Works Proposals) .pdf

193.9 KB

PDF

22643-MWP-XX-XX-DR-C-0101-P01-Existing Site Location and Layout.pdf

690.2 KB

PDF

22643-MWP-XX-XX-DR-C-1101-P01-Proposed Works Site Plan.pdf

477.6 KB

PDF

22643-MWP-XX-XX-DR-C-1102-P01-Proposed Works-Works Area 01-Cross Sections.pdf

395.8 KB

PDF

22643-MWP-XX-XX-DR-C-1103-P01-Proposed Works-Works Area 02-Sheet 1 of 2.pdf

411.6 KB

PDF

22643-MWP-XX-XX-DR-C-1104-P01-Proposed Works-Works Area 02-Sheet 2 of 2.pdf

357.6 KB

PDF

22643-MWP-XX-XX-DR-C-1105-P01-Proposed Works-Works Area 03-Cross Sections.pdf

389.4 KB

PDF

22643-MWP-XX-XX-DR-C-1106-P01-Proposed Works-Works Area 04-Plan and Details.pdf

660.8 KB

PDF

ADCO_AIA_SeaviewCoastalProtectionProject_FinalReport_20122023.pdf

15.1 MB

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57 (1).docx

37.8 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

26.0 KB

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

25.6 KB

PDF

comms services map open eir.pdf

115.8 KB

PDF

ESB_20240503-052_A3.pdf

383.5 KB

PDF

Gas newtworks mapping_seaview.pdf

1021.2 KB

PDF

PW-CF5-v2.8-01-05-2024.pdf

1.2 MB

DOCX

site photographs.docx

2.8 MB

Original notice text

Wexford County Council seeks contractors for coastal protection works at Seaview, focusing on building and integrating rock-armour revetment to safeguard properties from erosion.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

05 Jul

View on eTenders ↗

Location

Bastardstown (Seaview), Co. Wexford

Procedure

Open

Clarification

21 Jun 2024

eTenders ID

3719287

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender