← Tenders / Bagenalstown Public Realm Improvement Works
Awarded Construction & Civil Engineering Works SME Suitable Open

Bagenalstown Public Realm Improvement Works

Value

€500k

Deadline

24 Jun

Public realm improvement works in Bagenalstown by Carlow County Council

SME fit: Medium Bid effort: Medium 📍 Carlow

Public realm improvement works in Bagenalstown by Carlow County Council

Bidder profile

Mid-sized to large firms with public sector tender experience and operational capability in civil engineering.

Risks & flags

  • Qualification gate
  • Two-step process
  • Technical ambiguity

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Carlow County Council
Title Bagenalstown Public Realm Improvement Works
CPV / category works
Estimated value 500000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 7 years
Submission deadline 2024-06-24T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Carlow County Council ran this procurement for “Bagenalstown Public Realm Improvement Works” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Competition the successful Tenderer shall be required to supply its Tax
  • verification of their tax status by the Contracting Authority. By supplying
  • has prior knowledge of their organisation or service provision. Tenderers will
  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • the Contracting Authority’s third party service providers, such as
  • electronic submission to the eTenders platform, Tenderers are advised to
  • system has sufficient capacity to execute the upload of all the documents
  • drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] information on the site location, any constraints such as existing services or
  • electronic submission (including to the eTenders platform), Candidates must
  • are not construction operations subject to Relevant Contracts Tax (and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • and retention policy, a copy of which can be obtained from the Contracting
  • drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] information on the site location, any constraints such as existing services or

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 Tenderer Entry: Check the appropriate bo; Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 Suitability Assessment Questionnaire – W
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — Minimum Turnover Area of Work / Business: Overall Average Turnover to include other areas of business Minimum Average Turnover: Maximum Average Turnover: Civil engineering N/A €1.0m N/A Suitability Assessment Questionna
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Minimum Turnover Area of Work / Business: Overall Average Turnover to include other areas of business Minimum Average Turnover: Maximum Average Turnover: Civil engineering N/A €1.0m N/A Suitability Assessment Questionna
  • Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 Tenderer Entry: Check the appropriate bo
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 Suitability Assessment Questionnaire – W
  • ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event
  • 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works €10000 * public liability €6,500[9] * employer’s liability €6,500[10]

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
the amount inserted must not exceed 10 % of the tendered Price. not stated not stated not stated
method-related charges must not exceed 10% of the tendered Price. not stated not stated not stated
[202202 ITT-W4-v1.5-01-08-2023-2.pdf] not exceed 10% of the tendered Price. not stated not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 Suitability Assessment Questionnaire – W
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] Instruction to Tenderers
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] Applicants should not rely on any representation purportedly made on the
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] conditions precedent to its effectiveness have been met. The
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] view and will take such steps as it considers necessary to comply
  • [202202 ITT-W4-v1.5-01-08-2023-2.pdf] (but is not limited to) excluding the Applicant

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-06-24T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-06-24T11:00:00+00:00
Date surfaced in documents 01 August 2023
Date surfaced in documents 25 May 2018
Date surfaced in documents 19 July 2023

8. Contract terms that matter

Contract duration in the extract: 7 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
  • the Works within 12 months after the termination, the Contractor’s payment under this clause
  • h the Payment of Wages Act 1991 and have not been more than 1 month in arrears or unpaid
  • e Schedule says that a performance bond is required, within 7 days after the Employer sends

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 202202 ITT-W4-v1.5-01-08-2023-2.pdf, FTS-6-v1.6-19-07-2023-1.docx, ~$2202 ITT-W2-v2.5-01-08-2023-1.docx.
  • eTenders CFT / notice reference: contract notice for the Works to.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Schedule says that a performance bond is required, within 7 days after the Employer send, ITT-W4-v1.5-01-08-2023-2.pdf] Instruction to Tenderers, ITT-W4 v1.5.

This tender has been awarded

Can you bid?

Required certifications

  • Safe-T-Cert

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Technical Merit

60%

Price

40%

Lots (1)

Lot 1: Bagenalstown Public Realm Improvement Scheme €500k

Upgrading footpaths, resurfacing roads, constructing cycle lanes, and installing public lighting.

Documents (30)

PDF

202202 ITT-W4-v1.5-01-08-2023-2.pdf

298.2 KB · RFT / Invitation to Tender

DOCX

FTS-6-v1.6-19-07-2023-1.docx

58.4 KB · RFT / Invitation to Tender

PDF

202202 Vol C Pricing Document.pdf

277.1 KB · Pricing / BOQ / Schedule of Rates

PDF

Contract - PW-CF6-v1.14-19-07-2023.pdf

612.0 KB · Contract / Agreement / Terms

DOCX

MF-1.22-09-04-2020.docx

37.4 KB · Contract / Agreement / Terms

DOCX

MF-1.23-09-04-2020.docx

36.9 KB · Form / Declaration / Certificate

PDF

QW2_Suitability_Assessment_Open_Form.pdf

326.8 KB · Form / Declaration / Certificate

PDF

QW2_Supplement_3.4.1.pdf

111.4 KB · Form / Declaration / Certificate

PDF

QW2_Supplement_3.4.2.pdf

106.4 KB · Form / Declaration / Certificate

PDF

ESB.pdf

393.8 KB · Drawing / Plan / Layout

PDF

Uisce Eireann and Storm.pdf

489.4 KB · Drawing / Plan / Layout

PDF

Vol A Part B - Drawings.pdf

2.9 MB · Drawing / Plan / Layout

PDF

202202 Preliminary Health and Safety Plan.pdf

1.4 MB · Other

DOCX

~$2202 ITT-W2-v2.5-01-08-2023-1.docx

162 bytes · Other

PDF

Eir.pdf

276.5 KB

DOCX

QW2-Appendix-D.docx

16.9 KB · Appendix / Annex

DOCX

QW2-Appendix-E.docx

23.4 KB · Appendix / Annex

DOCX

QW2-Appendix-F.docx

22.0 KB · Appendix / Annex

DOCX

QW2-Appendix-G.docx

17.0 KB · Appendix / Annex

DOC

QW2_Appendix_A1.doc

32.0 KB

DOC

QW2_Appendix_B1.doc

69.0 KB

DOC

QW2_Appendix_B2.doc

47.0 KB

DOC

QW2_Appendix_B3.doc

50.5 KB

DOC

QW2_Appendix_C1.doc

46.0 KB

DOC

QW2_Appendix_C3.doc

47.0 KB

DOC

QW2_Appendix_C4.doc

47.0 KB

DOC

QW2_Suitability_Assessment_Open_Form.doc

453.5 KB

DOC

QW2_Supplement_3.4.1.doc

84.5 KB

DOC

QW2_Supplement_3.4.2.doc

99.0 KB

PDF

Vol A Part A - Works Requirements and Specifications.pdf

2.7 MB

Original notice text

This tender involves the Bagenalstown Public Realm Improvement Works, focusing on building, integrating, and operating specified services with compliance reporting and handover obligations.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€500k

Deadline

24 Jun

View on eTenders ↗

Location

Bagenalstown, Ireland

Procedure

Open

Clarification

10 Jun 2024

eTenders ID

3656518

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender