← Tenders / Proposed Fit-out of new MARA offices on the Second Floor of Menapia House, Wexford
Awarded Construction & Civil Engineering Works SME Suitable Open

Proposed Fit-out of new MARA offices on the Second Floor of Menapia House, Wexford

Deadline

21 Jun

Fit-out of new MARA offices in Wexford over 2 months

SME fit: Medium Bid effort: Medium 📍 Wexford

Fit-out of new MARA offices in Wexford over 2 months

Bidder profile

Firms with experience in public sector office fit-outs and compliance with procurement regulations.

Risks & flags

  • Undisclosed contract value
  • Two-step qualification process
  • Ambiguity in technical requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Maritime Area Regulatory Authority
Title Proposed Fit-out of new MARA offices on the Second Floor of Menapia House, Wexford
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 2 months
Submission deadline 2024-06-21T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Maritime Area Regulatory Authority ran this procurement for “Proposed Fit-out of new MARA offices on the Second Floor of Menapia House, Wexford” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • successful Tenderer shall be required to supply its Tax Clearance Access
  • status by the Contracting Authority. By supplying these numbers the
  • prior knowledge of their organisation or service provision. Tenderers will only be
  • the Contracting Authority’s third party service providers, such as
  • platform. The Contracting Authority may under section 2.2 still issue any
  • information it considers appropriate on the eTenders platform following
  • to the eTenders platform, Candidates are advised to ensure that they give
  • purpose. Candidates should ensure that their operating system has
  • Schedule and Standing Conciliator services (if required) at Part 1N of the
  • construction operations subject to Relevant Contracts Tax (and therefore to
  • [06.ITT-W2-Instruction to Tenderers.pdf] to cover the estimated fee for the service. The Tender Sum on the Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • and retention policy, a copy of which can be obtained from the Contracting

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • shall be submitted not less than 2 weeks or 10 working days before manufacture b
  • [06.ITT-W2-Instruction to Tenderers.pdf] ITT-W2 v 2.5 01/08/2023
  • [06.ITT-W2-Instruction to Tenderers.pdf] has not authorised anyone to make any representation in
  • [06.ITT-W2-Instruction to Tenderers.pdf] Letter of Acceptance and any conditions precedent to its effectiveness have
  • [06.ITT-W2-Instruction to Tenderers.pdf] take such steps as it considers necessary to comply with its obligations

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-06-21T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-06-21T11:00:00+00:00
Date surfaced in documents 01 August 2023
Date surfaced in documents 25 May 2018
Date surfaced in documents Act 1991

8. Contract terms that matter

Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
  • IT IS AGREED as follows in consideration of the payment of €1 by the Employer to the Specialist (receipt of which the Specialist acknowledges
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 3
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • Surety will be released from its liability under this Bond 450 days after the certificate of Substantial Co

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 06.ITT-W2-Instruction to Tenderers.pdf, MF-1.12-09-04-2020.docx, Schedule and.
  • eTenders CFT / notice reference: contract notice for the Works to.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT-W2-Instruction to Tenderers.pdf] ITT-W2 v 2.5 01/08/2023, ITT-W2 v 2.5 01/08/2023, ITT-W2 V2.5.

This tender has been awarded

Can you bid?

Required certifications

  • BS 8000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: MARA Office Fitout

Internal office fitout of north and south blocks on the second floor of Menapia House, Wexford.

Documents (60)

PDF

182-LAW-XX-XX-SC-M-1016.pdf

192.7 KB · Specification

PDF

23-553-T-1207 Proposed Furniture Specification plan.pdf

1.8 MB · Specification

PDF

23-553-T-5001 - Door and Screen Schedule.pdf

1.4 MB · Specification

PDF

Vol A1 Proj Particulars - MARA 29 02 2024.pdf

695.5 KB · Specification

PDF

06.ITT-W2-Instruction to Tenderers.pdf

374.0 KB · RFT / Invitation to Tender

PDF

182-LAW-XX-XX-SP-M-1003_APPROXIMATE BWiC SCHEDULE_T0.pdf

388.4 KB · Pricing / BOQ / Schedule of Rates

PDF

Mara, Fit-Out - Bill of Quantities.pdf

493.3 KB · Pricing / BOQ / Schedule of Rates

XLSX

Mara, Fit-Out - Bill of Quantities.xlsx

468.6 KB · Pricing / BOQ / Schedule of Rates

PDF

04. Contract.pdf

1.2 MB · Contract / Agreement / Terms

DOCX

MF-1.10-09-04-2020.docx

53.9 KB · Contract / Agreement / Terms

DOCX

MF-1.12-09-04-2020.docx

69.1 KB · Contract / Agreement / Terms

DOCX

MF-1.13-09-04-2020.docx

48.9 KB · Form / Declaration / Certificate

DOCX

MF-1.30-Reliance-Warranty-18-07-2022.docx

59.3 KB · Form / Declaration / Certificate

DOCX

MF-1.32-Declaration-re-Regulation-57-28-07-2023.docx

37.7 KB · Form / Declaration / Certificate

DOCX

MF-1.33-Declaration-Oath-still-Valid-28-07-2023.docx

33.7 KB · Form / Declaration / Certificate

DOCX

MF-1.6-09-04-2020.docx

58.4 KB · Form / Declaration / Certificate

DOCX

MF-1.7-Reliance-Guarantee-18-07-2023.docx

64.5 KB · Form / Declaration / Certificate

PDF

182-LAW-XX-XX-RG-ME-0001 - Drawing Register.pdf

230.1 KB · Drawing / Plan / Layout

PDF

182-LAW-XX-XX-SC-M-1009.pdf

142.0 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6201.pdf

434.1 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6202.pdf

393.1 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6301.pdf

471.7 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6302.pdf

436.6 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6701.pdf

422.0 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-E-6702.pdf

390.2 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5301.pdf

366.7 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5302.pdf

323.1 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5701.pdf

548.7 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5702.pdf

466.6 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5703.pdf

237.9 KB · Drawing / Plan / Layout

PDF

182-LAW-ZZ-XX-02-DR-M-5704.pdf

232.0 KB · Drawing / Plan / Layout

PDF

23-553-T-1200 Existing GA-1.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-553-T-1201 Demolitions GA-1.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-553-T-1202 Proposed GA-1.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23-553-T-1202 Proposed GA.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23-553-T-1203 Proposed Floor finishes plan.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23-553-T-1204 Reflected Ceiling Plan.pdf

1.7 MB · Drawing / Plan / Layout

PDF

23-553-T-1205 Proposed Partiton plan.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23-553-T-1206 Proposed Wall finishes plan.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-553-T-4000 - Coat Hangers 01 - 02.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-553-T-4001 - Boardroom TV.pdf

226.5 KB · Drawing / Plan / Layout

PDF

23-553-T-4002 - Reception Desk.pdf

361.8 KB · Drawing / Plan / Layout

PDF

23-553-T-4003 - Reception Feature Wall and Cabinet.pdf

289.9 KB · Drawing / Plan / Layout

PDF

23-553-T-4004 - Paper Storage Unit.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-553-T-4005 - High Table Detail.pdf

355.4 KB · Drawing / Plan / Layout

PDF

23-553-T-4006 - Reception Planter Detail.pdf

284.2 KB · Drawing / Plan / Layout

PDF

23-553-T-4007 - Teapoint pdf.pdf

181.1 KB · Drawing / Plan / Layout

PDF

23-553-T-4008 - Reception Bulkhead Feature.pdf

254.3 KB · Drawing / Plan / Layout

PDF

23-553-T-4009 - Reception Panelled Wall.pdf

256.9 KB · Drawing / Plan / Layout

PDF

23-553-T-4010 - Kitchen.pdf

233.9 KB · Drawing / Plan / Layout

PDF

Mara May Issue .pdf

86.5 KB · Drawing / Plan / Layout

PDF

07. ITT-W2_Invitation_to_Tenderers.pdf

172.3 KB

XLSX

182 MARA ELECTRICAL BOQ.xlsx

639.5 KB

XLSX

182 MARA MECHANICAL BOQ.xlsx

566.8 KB

PDF

182-LAW-XX-XX-SP-E-1001_ELEC PARTICULAR + GENERAL SPEC_T0.pdf

1.9 MB

DOCX

Clarification Document 1_.docx

68.4 KB · Clarification / Addendum

DOCX

Clarification Document 2.docx

153.0 KB · Clarification / Addendum

DOCX

Clarification Document 3.docx

67.8 KB · Clarification / Addendum

PDF

FTS-5-v2.6-17-07-2023-1 (1).pdf

444.6 KB

DOCX

MF-1.31-Site-Closure-Costs-Supplement-29-07-2021.docx

49.0 KB · Appendix / Annex

Original notice text

This tender involves the fit-out of new offices for the Maritime Area Regulatory Authority on the second floor of Menapia House, Wexford, requiring compliance with operational and reporting standards.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

21 Jun

View on eTenders ↗

Location

Menapia House, Wexford, Ireland

Procedure

Open

Clarification

14 Jun 2024

eTenders ID

3612055

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender