Provision of Managed Print Solution
Deadline
14 Jun
14 Jun 2024
Deadline
14 Jun
Managed print solution services for the Department of Culture Communications Sport
Managed print solution services for the Department of Culture Communications Sport
Bidder profile
Mid-sized to large firms with experience in public sector print management and compliance.
Risks & flags
- Qualification gate for turnover
- Undisclosed contract value
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Department of Culture Communications Sport |
| Title | Provision of Managed Print Solution |
| CPV / category | services |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 6 months |
| Submission deadline | 2024-06-14T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Department of Culture Communications Sport ran this procurement for “Provision of Managed Print Solution” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- successful Tenderer shall be required to hold for the term of the Services Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 (For any one claim or series of claims
- ▪ Demonstrate a minimum annual turnover of €2,000,000 in relation to similar services in the
- by the proposed Services Contract may amount to some €290,000 (excl
- Culture, Arts, Gaeltacht, Sport and Media ICT Unit supports circa 450 users
- from economic operators (“Tenderers”) for the provision of the services as described in
- Appendix 1 to this RFT (the “Services”).
- may result from this Competition (the “Services Contract”) will be issued for a term of 3 years
- The Contracting Authority estimates that the expenditure on the Services to be covered
- by the proposed Services Contract may amount to some €290,000 (excl. VAT) over
- Note, the appointment of the successful Tenderer (the “Service Provider”) does not
- Gaeltacht, Sport and Media to purchase any Services from the Service Provider
- the successful implementation of any Services Contract that may result from this Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Contracting Authority policy seeks to encourage participation on a fair and equal basis by
- detail is provided, and the response has fundamental flaws, or is seriously inadequate or
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; successful Tenderer shall be required to hold for the term of the Services Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 (For any one claim or series of claims; Public Liability €6,500,000 (For any one claim or series of claims
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- successful Tenderer shall be required to hold for the term of the Services Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 (For any one claim or series of claims
- Public Liability €6,500,000 (For any one claim or series of claims
- ) Product Liability €6,500,000 (For any one claim or series of claims
- ) Professional Indemnity €500,000 (In the aggregate per insurance year) Cyber Liability €1,000,000 (In the aggregate per insurance year) D
- ▪ Demonstrate a minimum annual turnover of €2,000,000 in relation to similar services in the
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Tenderers should note that they must achieve a **minimum of 60% on each individu | 60% | not stated | not stated |
| a minimum of 60% on each individual non-cost related criterion in order to a | 60% | not stated | not stated |
| Tenderers should note that they must achieve **a minimum of 60% on each individu | 60% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- [TCAGSM Managed Print - May 2024.pdf] 1
- Declaration as to Personal Circumstances of Tenderer
- Appendix 1 to this RFT (the “Services”).
- [TCAGSM Managed Print - May 2024.pdf] the right to extend the Term for a period or periods of up to
- [TCAGSM Managed Print - May 2024.pdf] Part 2: Instructions to Tenderers
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-06-14T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-06-14T11:00:00+00:00 |
| Date surfaced in documents | 12 March 2001 |
| Date surfaced in documents | June 2024 |
| Date surfaced in documents | May 2024 |
8. Contract terms that matter
Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- Sector: Office Supplies & Equipment
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- successful Tenderer shall be required to hold for the term of the Services Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 (For any one claim or series of claims
- NOW IT IS HEREBY AGREED in consideration of the sum of €2.00 (the receipt of which is hereby
- • The Minimum requirement for user Authentication on a MFD is a swipe card
- remedy) within 30 days after receipt of a request in writing f
- For the Term and for a period of 12 months thereafter (and save in respect of publ
- may result from this Competition (the “Services Contract”) will be issued for a term of 3 years
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: TCAGSM Managed Print - May 2024.pdf, Appendix 1:, Appendix 2:.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule, Appendix 3:, Appendix 4:.
Can you bid?
Minimum turnover
€2,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€500,000
Scoring
Most Economically Advantageous Tender
Technical Merit
SLA and On-Site Support
Cost
Lots (1)
Provision of managed print services including supply, installation, and maintenance of devices.
Documents (5)
TCAGSM Device Specifications - Updated - 5th June 2024.pdf
791.8 KB · Specification
TCAGSM Managed Print - May 2024.pdf
1.5 MB · RFT / Invitation to Tender
Appendix 2 - Pricing Schedule.xlsx
23.7 KB · Pricing / BOQ / Schedule of Rates
Appendix 2a - Print Volume.xlsx
31.7 KB · Appendix / Annex
TCAGSM Tender Response Document - May 2024.docx
134.7 KB · Tender Response Template
Original notice text
The Department of Culture Communications Sport seeks a managed print solution, requiring implementation and ongoing service execution for approximately 450 users across various departments.
AI analysis updated 4 months ago
Deadline
14 Jun
Location
Services to be provided across Ireland for the Department of Culture Communications Sport.
Procedure
Open
Clarification
07 Jun 2024
eTenders ID
3617412
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender