Electrical Services Upgrade Works
Deadline
05 Jun
05 Jun 2024
Deadline
05 Jun
Electrical services upgrade works at St. Declan's National School
Electrical services upgrade works at St. Declan's National School
Bidder profile
Mid-sized to large firms with experience in public sector electrical services tenders.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | St. Declan's National School (Ashbourne) |
| Title | Electrical Services Upgrade Works |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 months |
| Submission deadline | 2024-06-05T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
St. Declan's National School (Ashbourne) ran this procurement for “Electrical Services Upgrade Works” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: Electrical Services Upgrade Works
- Sector: Building Services & Maintenance
- It shall be, fixed within 1 metre of the fitting and in an accessible position for future maintenance
- , fixed within 1 metre of the fitting and in an accessible position for future maintenance
- volves mainly the upgrade of the electrical services to the 2050m² main school building,
- Electrical Services Upgrade Works at St. Declan's National School,
- 1 As a result of the introduction of the new electronic Relevant Contracts tax (e-RCT) system by the
- existing services or working hours, statutory consents and conditions attached thereto.
- not construction operations subject to Relevant Contracts
- not construction operations subject to Relevant Contracts Tax (and therefore Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- existing services or working hours, statutory consents and conditions attached thereto.
- refundable to all tenderers that submit bona fide tenders that are not
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event; ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event
- ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| the amount inserted must not exceed ______ % of the tendered Price. | not stated | not stated | not stated |
| method-related charges must not exceed ____% of the tendered Price. | not stated | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- with a value of less than €250,000. Projects in excess of €50,000 must be advertised on etenders
- certificate shall be submitted to the Engineer within 14 days of completion of the tests
- [Instructions_to_tender - Open Procedure.pdf] Instruction to Tenderers
- [Instructions_to_tender - Open Procedure.pdf] representation purportedly made on the
- [Instructions_to_tender - Open Procedure.pdf] been filed, registered, or approved in any jurisdiction. Possession or
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-06-05T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-06-05T11:00:00+00:00 |
| Date surfaced in documents | 27 January 2014 |
| Date surfaced in documents | January 2014 |
| Date surfaced in documents | Acts 1997 |
8. Contract terms that matter
Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- stating the circuit reference number and the item of equipment to be served
- via a separate industrial type plug and socket outlet to IS/EN 60309 from a dedicated MCB so as to eliminate the risk of nuisance tripping
- label stating the circuit reference number and the item of equipment being served e
- They shall contact the School Principal prior at least 7 days before the tender
- ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
- For the attention of1 School Principal - Cian Kearns
- expiry of at least 21 days written notice to terminate this Tender
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Instructions_to_tender - Open Procedure.pdf, ITTW4 v1.2 27/01/2014, ITT-W4 V1.2.
- eTenders CFT / notice reference: contract notice for the Works to etenders.2.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule (Volume B), Appendix 3 to these Instructions, Appendix 2 to these Instructions.
Can you bid?
Required certifications
- NSAI National Wiring Rules
Scoring
Most Economically Advantageous Tender
Technical Merit
Price
Lots (1)
Upgrade of electrical services including luminaires and associated building fabric repairs.
Documents (21)
Vol A.2(01) Title.pdf
85.8 KB · Specification
Vol A.2(02) Section A - Tech Specification.pdf
576.2 KB · Specification
Vol A.2(04) Section C - Luminaire Schedule.pdf
113.4 KB · Specification
Instructions_to_tender - Open Procedure.pdf
304.6 KB · RFT / Invitation to Tender
Volume C - Pricing Document.pdf
132.8 KB · Pricing / BOQ / Schedule of Rates
Volume A.1 - Project Particulars.pdf
78.7 KB · Contract / Agreement / Terms
Volume B Form of Tender & Schedules.pdf
145.9 KB · Form / Declaration / Certificate
61-00.pdf
818.0 KB · Drawing / Plan / Layout
62-00.pdf
922.0 KB · Drawing / Plan / Layout
62-01.pdf
650.4 KB · Drawing / Plan / Layout
63-00.pdf
1.2 MB · Drawing / Plan / Layout
65-00.pdf
541.4 KB · Drawing / Plan / Layout
66-00.pdf
576.2 KB · Drawing / Plan / Layout
69-00.pdf
301.8 KB · Drawing / Plan / Layout
BW-01.pdf
540.2 KB · Drawing / Plan / Layout
CT-01.pdf
725.2 KB · Drawing / Plan / Layout
SS-01.pdf
841.9 KB · Drawing / Plan / Layout
Vol A.2(03) Section B - Drg Issue Sheet.pdf
107.4 KB · Drawing / Plan / Layout
WF-01.pdf
179.2 KB · Drawing / Plan / Layout
Schedule of Tender Documentation.pdf
111.8 KB · Appendix / Annex
Volume A.4 Sample Images of Required Building Fabric Repair Works.pdf
1.5 MB · Appendix / Annex
Original notice text
This tender involves upgrading the electrical services at St. Declan's National School, ensuring compliance with operational standards and future maintenance accessibility.
AI analysis updated 4 months, 1 week ago
Deadline
05 Jun
Location
Ireland
Procedure
Open
Clarification
27 May 2024
eTenders ID
3578796