Monaghan County Council invite you to tender for N2 Moy to Mullabryan Pavement Scheme
Deadline
22 May
22 May 2024
Deadline
22 May
Tender for N2 Moy to Mullabryan Pavement Scheme by Monaghan County Council
Tender for N2 Moy to Mullabryan Pavement Scheme by Monaghan County Council
Bidder profile
Mid-sized to large firms with experience in public sector tenders and civil engineering projects.
Risks & flags
- Qualification gate turnover threshold
- Undisclosed contract value
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Monaghan County Council |
| Title | Monaghan County Council invite you to tender for N2 Moy to Mullabryan Pavement Scheme |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 5 years |
| Submission deadline | 2024-05-22T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Monaghan County Council ran this procurement for “Monaghan County Council invite you to tender for N2 Moy to Mullabryan Pavement Scheme” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- It will be a condition of the award of the Contract that the successful Tenderer shall, for the term of the contract, comply with all applicable EU and domestic tax laws. Prior to the award of the Contract arising out of this competition the successful Tenderer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by the Contracting Authority. By supplying these numbers the successful Tenderer acknowledges and agrees that the Contracting Authority has the permission of the successful Tenderer to verify its tax cleared position online. Candidates may obtain information regarding their obligations concerning * taxation from the Revenue Commissioners (www.revenue.ie) * environmental protection from the Environmental Protection Agency (www.epa.ie) * employment protection and working conditions
- Candidates must not make any assumptions that the Contracting Authority has prior knowledge of their organisation or service provision. Tenderers will only be evaluated on the information contained in their Tender (as may be clarified in accordance with these Instructions).
- [ITT-W2-v2.5-01-08-2023.docx] by the Applicant.The Contracting Authority collects personal data from the Applicant directly, and from the following sources:• Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable); and• Referees.Any personal data provided will be processed for the purposes of the Competition, the administration of any contract awarded on foot of this Competition, reporting to any regulators or oversight bodies and/or any disputes relating to the Competition or the contract.In connection with the above, the Contracting Authority may disclose personal data to various recipients including:• the Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable);• the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and• regulators or oversight bodies.If the Tenderer is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a contract is awarded to the Tenderer at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request. Any data subjects in respect of which the Contracting Authority holds or processes personal data have rights in relation to their personal data, including the right to request access to their data and, in certain circumstances to request rectification, erasure or restriction of the processing of their personal data. All such data subjects have the right to lodge a complaint with the Irish supervisory authority, the Data Protection Commission.
- 2.3 Queries Queries may be raised in writing by email using the means of communication stated in the Particulars. Queries must be raised as soon as possible, and should be raised in any event no later than when stated in the Particulars. The Contracting Authority has no obligation to respond to queries although the Contracting Authority may at its discretion respond to queries raised after that date. If the Contracting Authority responds to a query, it will issue the response on the e-tenders website, unless the query has been clearly designated as confidential. If the query has been designated as confidential, and the Contracting Authority decides that the response should be published on the e-Tenders website, the Contracting Authority will so notify the person raising the query, who will have the option of withdrawing the query or having any response published on the eTenders platform. The Contracting Authority may under section 2.2 still issue any information it considers appropriate on the eTenders platform following withdrawal of the query. As with these
- [ITT-W2-v2.5-01-08-2023.docx] person raising the query, who will have the option of withdrawing the query or having any response published on the eTenders platform. The Contracting Authority may under section 2.2 still issue any information it considers appropriate on the eTenders platform following withdrawal of the query. As with these Instructions, responses to queries will not create any contractual relationship between the Contracting Authority and Tenderers, or form part of the Contract, unless they state that they are amending the Contract documents. It is the responsibility of the Candidate to monitor the means of communication stated in the Particulars for any correspondence or clarifications in relation to this competition. If a person intending to submit a Tender becomes aware of any ambiguity, discrepancy, error, or omission in or between these documents, it must immediately notify the Contracting Authority, even after the time for submitting queries has expired.
- 5.1 Delivery Tenders must be received in accordance with the means of tender delivery[1] stated in the Particulars, at or before the latest time stated in the Particulars (or a later date and time advised by the Contracting Authority to Applicants) in the manner described in the Particulars. Time is taken as standard time according to the Standard Time Act 1968 as amended by the Standard Time (Amendment) Act 1971 and any subsequent amendment or re-enactment thereof. Where the Particulars state that the required means of tender submission is to the eTenders platform, Candidates are advised to ensure that they give sufficient time to allow for the successful upload of all tender documents and that they have a reliable, continual connection speed available for this purpose. Candidates should ensure that their operating system has sufficient capacity to execute the upload of all the documents included in the tender submission before the deadline stated in the Particulars (or a later date and time advised by the Contracting Authority to all Candidates). The timely and complete upload of documents is the responsibility of each Candidate. All files submitted electronically must be capable of being readily viewed in their entirety in the format stated in the Particulars. It is the responsibility of the Candidate to ensure that electronic documents submitted are not corrupt. Candidates are advised to consult etenders.gov.ie for information on uploading electronic submissions. Completed delivery of the tender in advance of the submission deadline is the responsibility of each Tenderer.
- 5.7 Pricing Unless otherwise stated, all sums given in Tenders must be in euro, to two decimal places. Tenderers must not insert additional items in the Pricing Document, except where permitted to do so by the Pricing Document, or make any alterations to the Pricing Document. Tenderers must not amend (lump sums or Reserved Sums) inserted in the Pricing Document by the Contracting Authority that are associated with named Specialist works set out in Part 1F (iii) of the Form of Tender and Schedule and Standing Conciliator services (if required) at Part 1N of the Form of Tender and Schedule. Where named Specialists (novated) are required under the Contract, Candidates will be required to price lump sum items in the Pricing Document to cover: 1. General attendances; 2. Special attendances; and 3. Management, to incorporate the Contractor’s management, risk acceptance and indirect overhead costs associated with
- 5.8 Value-Added Tax The Form of Tender states whether and to what extent, the tendered Contract Sum includes value-added tax (VAT). The amounts in the Schedule, Part 2 exclude VAT. The Pricing Document excludes VAT unless otherwise stated in the Pricing Document. If the Pricing Document includes a schedule of items that are not construction operations subject to Relevant Contracts Tax (and therefore to reverse-charge VAT), and, in the Contracting Authority’s opinion, the categorisation of an item, the VAT rate stated, or the value stated is not correct, the Contracting Authority may invoke section 8.2. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- [ITT-W2-v2.5-01-08-2023.docx] by the Applicant.The Contracting Authority collects personal data from the Applicant directly, and from the following sources:• Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable); and• Referees.Any personal data provided will be processed for the purposes of the Competition, the administration of any contract awarded on foot of this Competition, reporting to any regulators or oversight bodies and/or any disputes relating to the Competition or the contract.In connection with the above, the Contracting Authority may disclose personal data to various recipients including:• the Tenderer’s organisation;• other members of the Tenderer’s consortium (if applicable);• the Contracting Authority’s third party service providers, such as financial, legal and technical advisors; and• regulators or oversight bodies.If the Tenderer is unsuccessful as part of the tender process, such personal data will be retained until three years after the conclusion of the tender process or the award of the Contract to the successful Tenderer, whichever is later. If the Tenderer is successful, and a contract is awarded to the Tenderer at the end of the tender process, such personal data will be retained in accordance with the Contracting Authority’s record management and retention policy, a copy of which can be obtained from the Contracting Authority upon request. Any data subjects in respect of which the Contracting Authority holds or processes personal data have rights in relation to their personal data, including the right to request access to their data and, in certain circumstances to request rectification, erasure or restriction of the processing of their personal data. All such data subjects have the right to lodge a complaint with the Irish supervisory authority, the Data Protection Commission.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[[8 note-7) for any one event, but this
- Certifications — not specified for this tender
- Past experience — * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Personnel — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering [17] € 5,000,000 CA SUPPLEMENTARY REQUIREMENTS: "N
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000[[8 note-7) for any one event, but this
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
- Maximum excess for Public liability: €10,000~~[10]~~ in respect of p
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering [17] € 5,000,000 CA SUPPLEMENTARY REQUIREMENTS: "N
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|
- The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated | [ITT-W2-v2.5-01-08-2023.docx] includes using strategies that might allow the Ten | 5% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a Certifi
- 1.1 This procedure The Contracting Authority has sent a contract notice for the Works to etenders and where appropriate a similar notice has been simultaneously sent to the Publications Office of the EU for publication in the Official Journal of the European Union. These documents set out the suitability assessment criteria, the award criteria and the evaluation and award process which will be followed by the Contracting Authority in making the assessment of which tender is either the lowest price or the most economically advantageous. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
- [ITT-W2-v2.5-01-08-2023.docx] economically advantageous. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
- 1.2 These documents The documents being made available to those Applicants expressing interest are: Documents (when fully completed by the relevant parties) to be included in the Contract * Volume A: Works Requirements * Volume B: Form of Tender and Schedule * Volume C: Pricing Document Also included in the contract but not part of the documentation being made available to Applicants at the start of the tendering period is the Letter of Acceptance, the Agreement (where relevant), and the Conditions of Contract which the Contracting Authority issues at award stage. The successful Tenderer’s Works Proposals will also be part of the Contract. Furthermore, any post tender clarifications that are part of the contract will be included in the Letter of Acceptance. Documents not to be included in the Contract * the invitation letter * these Instructions * Suitability Questionnaire(s) as follows: * - QW2 Suitability Assessment and Appendices * - QW2 Supplements 3.4.1 and 3.4.2 * - QW2 Supplement 3.5 * the information referred to in Appendix 3 to these Instructions * any other information made available to Applicants not stated to amend the Contract documents. Further information may be issued as described in the information referred to in Appendix 3 to these Instructions
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-05-22T15:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-05-22T15:00:00+00:00 |
| Date surfaced in documents | 01 August 2023 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | January 2010 |
8. Contract terms that matter
Contract duration in the extract: 5 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- Minimum amount for interim payments, except release of retention, € 0.00 [14]
- Minimum amount for interim payments, except release of retention, € 0
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 3
- Remember any damage to gas pipes, even if the pipe does not appear
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-W2-v2.5-01-08-2023.docx, FTS-5-v2.6-17-07-2023-1.docx, Schedule and.
- eTenders CFT / notice reference: contract notice for the Works to etenders and where appropriate a similar n.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Appendix B1 List of Previous Works projects for which there is a Certifi, ITT-W2-v2.5-01-08-2023.docx] Instruction to Tenderers, ITT-W2 V2.5.
This tender has been awarded
- Gibson Bros. (Ireland) Ltd · 15 Jan 2025
- Gibson Bros. (Ireland) Ltd · 13 Nov 2024
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€5,000,000
Public liability insurance
€6,500,000
Scoring
Lowest Price
Documents (60)
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
48.2 KB
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
44.3 KB
Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
37.8 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
32.8 KB
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
27.4 KB
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
25.6 KB
Appendix-C-Bankers-Letter.docx
29.9 KB
Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx
35.1 KB
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond (1).docx
28.4 KB
Appendix-E-Declaration-in-relation-to-Russian-Sanctions.docx
25.6 KB
Appendix-F-Declaration-re-International-Procurement-Instrument.docx
23.9 KB
EBS N2 Moy Mullabryan.pdf
341.8 KB
Eir Utilities Combined.pdf
1.1 MB
ESB Construction Safety 28th 11.40.pdf
803.2 KB
ESB Utilities Combined.pdf
2.9 MB
FTS-5-v2.6-17-07-2023-1.docx
92.7 KB
GAS N2 Moy to Mullabryan.pdf
338.5 KB
GAS Utilities Combined.pdf
3.8 MB
HSF08 Contractor Competence Assessment Form.doc
214.5 KB
HSF09 Preliminary Health and Safety Plan Resurfacing 2024.doc
246.5 KB
Information Pack - Cover Sheet.pdf
417.7 KB
ITT-W2-v2.5-01-08-2023.docx
133.1 KB
ITTW2_Invitation_to_Tender.doc
30.5 KB
MF-1.10-09-04-2020 - Appointment of Project Supervisor.docx
52.8 KB
MF-1.13-09-04-2020 - Rates of Pay and Conditions of Employment Certificate.docx
47.8 KB
MF-1.6-09-04-2020 - Performance Bond.docx
56.8 KB
PW-CF5-v2.7-17-07-2023-2.pdf
1.2 MB
QW-Part-2-v1.0-28-07-2023-2.docx
70.2 KB
QW2-Part-1-v2.0-28-07-2023-1.docx
189.4 KB
Safety Advice for working in the vicinity of Gas pipes 2021.pdf
4.2 MB
Uisce Eireann Waste and Storm Water N2 Moy to Mullabryan.pdf
349.1 KB
Uisce Eireann Water Data N2 Moy to Mullabryan.pdf
341.8 KB
Volume B - Cover Sheet.pdf
302.1 KB
Volume E - Cover Sheet.pdf
212.2 KB
WH9621 N2 Moy to Mullabryan Bill of Quantities.pdf
542.1 KB
WH9621 N2 Moy to Mullabryan Specification.pdf
1.7 MB
WH9621-06-000 - Drawing index.pdf
251.9 KB
WH9621-06-001 Site location map.pdf
2.2 MB
WH9621-06-002 Site Limits.pdf
799.2 KB
WH9621-06-003 VMS Location.pdf
3.8 MB
WH9621-06-1201 Pavement Line Markings.pdf
946.1 KB
WH9621-06-1202 Pavement Line Markings.pdf
966.8 KB
WH9621-06-1203 Pavement Line Markings.pdf
945.0 KB
WH9621-06-1204 Pavement Line Markings.pdf
949.2 KB
WH9621-06-1205 Pavement Line Markings.pdf
945.3 KB
WH9621-06-1206 Pavement Line Markings.pdf
951.4 KB
WH9621-06-1500 Inductive Loop Works.pdf
1.4 MB
WH9621-06-2700 Accommodation Works.pdf
1.4 MB
WH9621-06-500 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-501 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-502 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-503 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-504 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-505 Pavement Drainage Works.pdf
1.1 MB
WH9621-06-700 Pavement Types.pdf
973.7 KB
WH9621-06-701 Pavement Types.pdf
1016.9 KB
WH9621-06-702 Pavement Types.pdf
996.0 KB
WH9621-06-703 Pavement Types.pdf
1008.5 KB
WH9621-06-704 Pavement Types.pdf
1.0 MB
WH9621-06-705 Pavement Types.pdf
1000.0 KB
Original notice text
Monaghan County Council seeks tenders for the N2 Moy to Mullabryan Pavement Scheme, focusing on building and integrating specified service stacks with compliance reporting over a 5-year contract.
AI analysis updated 4 months ago
Deadline
22 May
Buyer
Monaghan County CouncilLocation
The project is located in Ireland, specifically along the N2 route.
Procedure
Open
Clarification
15 May 2024
eTenders ID
3516654
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender