Specialist Bridge Maintenance Works (Contract 4.0) on Non National roads 2024, at various locations in Co. Donegal
Deadline
10 May
10 May 2024
Deadline
10 May
Specialist bridge maintenance works on non-national roads in Donegal over 3 years
Specialist bridge maintenance works on non-national roads in Donegal over 3 years
Bidder profile
Mid-sized to large firms with experience in public sector tenders and bridge maintenance.
Risks & flags
- Undisclosed contract value
- Qualification gate turnover threshold
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Donegal County Council_1193 |
| Title | Specialist Bridge Maintenance Works (Contract 4.0) on Non National roads 2024, at various locations in Co. Donegal |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 years |
| Submission deadline | 2024-05-10T13:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Donegal County Council_1193 ran this procurement for “Specialist Bridge Maintenance Works (Contract 4.0) on Non National roads 2024, at various locations in Co. Donegal” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: Specialist Bridge Maintenance Works (Contract 4.0) on Non National roads 2024, at various locations in Co. Donegal
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- Specialist Bridge Maintenance Works (Contract 4.0) on Non National
- Competition the successful Tenderer shall be required to supply its Tax
- verification of their tax status by the Contracting Authority. By supplying
- has prior knowledge of their organisation or service provision. Tenderers will
- information on the site location, any constraints such as existing services or working hours, statutory consents and
- the Contracting Authority’s third party service providers, such as
- electronic submission to the eTenders platform, Tenderers are advised to
- system has sufficient capacity to execute the upload of all the documents
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
- electronic submission (including to the eTenders platform), Candidates must Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- information on the site location, any constraints such as existing services or working hours, statutory consents and
- and retention policy, a copy of which can be obtained from the Contracting
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
- will be refundable to all Tenderers that submit bona fide Tenders that are
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 0[19] The excess as st; ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[17] € 200,000 CA SUPPLEMENTARY REQUIREMENTS: N/
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[17] € 200,000 CA SUPPLEMENTARY REQUIREMENTS: N/
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 0[19] The excess as st
- ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[21] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
- Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[22] Entitles issuing
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| ated here: Maximum permissible excess on Professional Indemnity In 2% not stated not stated | |||
| e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated |
| the amount inserted must not exceed 20% of the tendered Price. | 20% | not stated | not stated |
| method-related charges must not exceed 0% of the tendered Price. | 0% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- Unless directed by Appendix 0/4, parapets shall have a minimum height of 1100mm above
- This project number must correspond to the project number given in Appendix B1
- [400.1 ITT - Contract 4.0, 2024.pdf] Instruction to Tenderers
- [400.1 ITT - Contract 4.0, 2024.pdf] ing Authority has not authorised anyone to make any
- [400.1 ITT - Contract 4.0, 2024.pdf] stated) unless and
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-05-10T13:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-05-10T13:00:00+00:00 |
| Date surfaced in documents | 01 August 2023 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | Clause 1707 |
8. Contract terms that matter
Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- framework of qualifications) in civil engineering or a related discipline and a minimum of 3 years experience in supervising Bridge Maintenace & Civil Engineering Works contracts
- e Tenderer’s current principal banker dated within the past 3 months stating the duration of the relationshi
- cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
- (b) expiry of at least 21 days written notice to terminate this Tender
- Competition or any part of it and may terminate the Competition or any part
- relationship (including, for the avoidance of doubt, any contract about the
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 400.1 ITT - Contract 4.0, 2024.pdf, 406.6 - Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE (1).docx, 406.1 - QW2-Part-1-Contract 4.0 2024.docx.
- eTenders CFT / notice reference: contract notice for the Works to.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Appendix 0/4, parapets shall have a minimum height of 1100mm above, Appendix B1, scheduled risks, which in the opinion of.
This tender has been awarded
- Joseph Mc Menamin and Son (Stranorlar) Ltd. · 28 May 2025
- Joseph Mc Menamin and Son (Stranorlar) Ltd. · 04 Jul 2024
Can you bid?
Required certifications
- ISO 9001
- ISO 9002
Minimum turnover
€200,000
Public liability insurance
€6,500,000
Scoring
Lowest Price
Lots (1)
Works to strengthen and maintain bridges across County Donegal.
Documents (22)
402.1 - Volume A Works Requirements Contract 4.0, 2024.pdf
374.1 KB · Specification
402.2 - Volume A Works Requirements Drawings Contract 4.0.pdf
1.2 MB · Specification
400.1 ITT - Contract 4.0, 2024.pdf
216.1 KB · RFT / Invitation to Tender
404.1 Volume C Pricing Document Contract 4.0 2024.pdf
68.4 KB · Pricing / BOQ / Schedule of Rates
403.1 - Volume B - FTS - Contract 4.0,2024.pdf
59.8 KB · Contract / Agreement / Terms
405.1 - Bridge Photos Contract 4.0, 2024.pdf
6.2 MB · Contract / Agreement / Terms
405.2 Preliminary Safety & Health Plan - Contract 4.0, 2024.pdf
348.0 KB · Contract / Agreement / Terms
405.3 - Preliminary Traffic Management Plans Contract 4.0 2024.pdf
1.0 MB · Contract / Agreement / Terms
405.4 - Bridge Location Maps Contract 4.0, 2024.pdf
6.0 MB · Contract / Agreement / Terms
405.5 Risk Assesments Contract 4.0, 2024.pdf
393.7 KB · Contract / Agreement / Terms
406.1 - QW2-Part-1-Contract 4.0 2024.docx
183.9 KB · Contract / Agreement / Terms
406.2 - QW-Part-2-Contract 4.0 2024.docx
69.9 KB · Contract / Agreement / Terms
406.3 - 3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
49.6 KB · Contract / Agreement / Terms
406.4 - 3.4.2-HS-PSCS-v3.0-28-07-2023.docx
44.1 KB · Form / Declaration / Certificate
406.5 - Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
39.1 KB · Form / Declaration / Certificate
406.7 - Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
27.3 KB · Form / Declaration / Certificate
406.8 - Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services (1).docx
26.6 KB · Form / Declaration / Certificate
402.2a Volume A BatBox Detail.pdf
280.0 KB · Drawing / Plan / Layout
402.2b Volume A Dipper Nesting Detail.pdf
245.8 KB · Drawing / Plan / Layout
405 -Additional Information Pack.pdf
37.1 KB · Appendix / Annex
405.6 - Background Information Volume C Excel Version Contract 4.0 2024.xlsx
42.4 KB
406.6 - Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE (1).docx
32.6 KB · Appendix / Annex
Original notice text
This tender involves specialist bridge maintenance works on non-national roads across various locations in County Donegal, requiring compliance with operational and reporting standards over a 3-year contract period.
AI analysis updated 4 months ago
Deadline
10 May
Buyer
Donegal County CouncilLocation
Various locations in County Donegal, Ireland.
Procedure
Open
Clarification
02 May 2024
eTenders ID
3417519
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender