← Tenders / EST WORKS - Connolly Hospital Generator Resilience Project (including PSCS)
Awarded Construction & Civil Engineering Works Framework Restricted

EST WORKS - Connolly Hospital Generator Resilience Project (including PSCS)

Value

€3.0m

Deadline

31 May

Generator resilience project at Connolly Hospital for Health Service Executive.

SME fit: Medium Bid effort: Medium 📍 Dublin

Generator resilience project at Connolly Hospital for Health Service Executive.

Bidder profile

Mid-sized to large firms with experience in public sector projects and generator installations.

Risks & flags

  • Qualification gate
  • Two-step process
  • Technical ambiguity

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Health Service Executive (HSE)
Title EST WORKS - Connolly Hospital Generator Resilience Project (including PSCS)
CPV / category works
Estimated value 3000000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 8 months
Submission deadline 2024-05-31T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Health Service Executive (HSE) ran this procurement for “EST WORKS - Connolly Hospital Generator Resilience Project (including PSCS)” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Buyer: Health Service Executive (HSE)
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • The Project 2 NEW STANDBY GENERATOR SYSTEMS AND ASSOCIATED ELECTRICAL AND BUILDERS WORK. AT CONNOLLY HOSPITAL
  • Regarding: The Project NEW STANDBY GENERATOR SYSTEMS AND ASSOCIATED ELECTRICAL AND BUILDERS WORK. AT CONNOLLY HOSPITAL
  • Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
  • [FTS-5-v2.6-17-07-2023-1.docx] an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
  • Persons under a contract of service or apprenticeship with the insured
  • Persons under a contract of service or apprenticeship with the insured.
  • Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial matters
  • Utilities means conducting media and apparatus for water, sewage, electricity, gas, oil, telecommunications, data, steam, air, or other services, and associated apparatus and structures.
  • The arbitration rules are the Capital Works Management Framework (CWMF) Arbitration Rules for use with Public Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration-rules/ on the date 10 days before the latest date for submission of Tenders for this contract (disregarding any amendments posted on that date).
  • The Contractor’s agent[19] in the Republic of Ireland for service of legal process is: Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
  • K Delay Events, Compensation Events, Programme Contingency, Delay Costs, Adjustments(Sub-clauses 9.3, 9.4, 10.1, 10.6, 10.7)
    • The programme contingency is Site Working Days of delay caused by Compensation Events.

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu
  • Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event
  • Maximum excess for Public liability: €10,000~~[10]~~ in respect of p

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
The Contractor’s tendered percentage addition to costs of labour *(If negative 0% not stated not stated
The Contractor’s tendered percentage addition to costs of labour *(If negative 0% not stated not stated
The Contractor’s tendered percentage addition to costs of materials *(If negat 0% not stated not stated
The Contractor’s tendered percentage addition/deduction to costs of plant *(A 50% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — not specified in extract. Submission-related source lines:
  • ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
  • Deliver a Generator project within 8 months, the main contractor must submit a minimum of two previous projects that demonstrate they have completed Generator projects within 8 months of them starting
  • e that any variant tenders are permitted, a variant tender must comply with the minimum requirements set out in the Particulars If so stated in the Particulars, variant tenders may be submitted only by a Candidate who also submits a standard tender
  • ough relevant projects submitted for each Candidate team member and their maximum points are set out in the table below 10](#_Toc144211191)
  • ough relevant projects submitted for each Candidate team member and their maximum points are set out in the table below
  • onsortium Member/Sub-Consultant Proposal & Declarations (MEMBER Consortium Member/Sub-Consultant Proposal & Declarations (MEMBER)*’ which shall b

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-05-31T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-05-31T11:00:00+00:00
Date surfaced in documents 17 July 2023
Date surfaced in documents March 2021
Date surfaced in documents August 2021

8. Contract terms that matter

Contract duration in the extract: 8 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
  • Minimum amount for interim payments, except release of retention, € 0.00 [14]
  • Minimum amount for interim payments, except release of retention, € 0
  • t is aware of the multiple participation by the relevant member and that it has been brought to the attention of all the consortium/joint venture
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • (b) expiry of at least 21 days written notice to terminate this Tender

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: FTS-5-v2.6-17-07-2023-1.docx, Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as

[FTS-5-v2.6-17-07-2023-1.docx, ITT-W1-v2.3-07-01-2022.docx.

  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Schedule and, Schedule, part 3D is* *“1, ITT within 2 weeks of the completion of the SAQ.

This tender has been awarded

Can you bid?

Minimum turnover

€4,500,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Technical Merit

Relevant Experience

Price

Lots (1)

Lot 1: Connolly Generator Resilience Project €3.0m

Installation of two LV generators and retrofit of two substations at Connolly Hospital.

Documents (38)

DOCX

FTS-5-v2.6-17-07-2023-1.docx

92.8 KB · RFT / Invitation to Tender

DOCX

ITT-W1-v2.3-07-01-2022.docx

114.5 KB · RFT / Invitation to Tender

DOCX

PIM_&_SAQ_Connolly_Generator_Res_.docx

105.8 KB · RFT / Invitation to Tender

DOCX

Contract Notice_Connolly_Generator_Resilience.docx

17.7 KB · Contract / Agreement / Terms

PDF

PW-CF5-v2.4-05-06-2019.pdf

816.2 KB · Contract / Agreement / Terms

DOCX

QW1 SUPPLEMENT 3.4.1.docx

34.3 KB · Form / Declaration / Certificate

DOCX

QW1 SUPPLEMENT 3.4.2.docx

34.4 KB · Form / Declaration / Certificate

PDF

23618-VCE-XX-00-DR-E-100.pdf

324.3 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-1000.pdf

706.6 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-1001.pdf

1.0 MB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-101.pdf

411.7 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-102.pdf

370.5 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-103.pdf

377.3 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-150.pdf

433.6 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-151.pdf

415.1 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-00-DR-E-151A.pdf

253.2 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-152.pdf

526.4 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-153.pdf

263.0 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-154.pdf

350.0 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-155.pdf

268.1 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-156.pdf

336.8 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-157.pdf

380.7 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-158.pdf

365.3 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-DR-E-159.pdf

280.1 KB · Drawing / Plan / Layout

PDF

23618-VCE-XX-XX-RG-E-0001.pdf

334.8 KB · Drawing / Plan / Layout

DOC

23618 Summary of Tender.doc

161.5 KB

PDF

23618-VCE-XX-XX-SP-E-0001.pdf

2.3 MB

DOCX

QW1 APPENDIX A.docx

18.2 KB · Appendix / Annex

DOCX

QW1 APPENDIX A1.docx

15.3 KB · Appendix / Annex

DOCX

QW1 APPENDIX B1.docx

17.7 KB · Appendix / Annex

DOCX

QW1 APPENDIX B2.docx

14.0 KB · Appendix / Annex

DOCX

QW1 APPENDIX B3.docx

19.8 KB · Appendix / Annex

DOC

QW1 APPENDIX C1.doc

46.0 KB

DOCX

QW1 APPENDIX C3.docx

21.6 KB · Appendix / Annex

DOCX

QW1 APPENDIX C4.docx

21.6 KB · Appendix / Annex

DOCX

QW1 APPENDIX D.docx

46.1 KB · Appendix / Annex

DOCX

QW1 APPENDIX G.docx

15.9 KB · Appendix / Annex

DOCX

QW1 APPENDIX H.docx

17.2 KB · Appendix / Annex

Original notice text

The project involves the installation of two new standby generator systems and associated electrical and builders work at Connolly Hospital, aimed at enhancing the hospital's generator resilience.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€3.0m

Deadline

31 May

View on eTenders ↗

Location

Connolly Hospital, Ireland

Procedure

Restricted

Clarification

22 May 2024

eTenders ID

3388844

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender