Public Realm and Mobility Plan for Mountshannon
Value
€400k
Deadline
30 Apr
30 Apr 2024
Value
€400k
Deadline
30 Apr
Public realm and mobility plan for Mountshannon by Clare County Council
Public realm and mobility plan for Mountshannon by Clare County Council
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in relevant service areas.
Risks & flags
- Qualification gate turnover requirement
- Two-step tender process
- Ambiguity in ITT details
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Clare County Council |
| Title | Public Realm and Mobility Plan for Mountshannon |
| CPV / category | works |
| Estimated value | 400000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 5 years |
| Submission deadline | 2024-04-30T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Clare County Council ran this procurement for “Public Realm and Mobility Plan for Mountshannon” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Where the estimated value of the contract is above €5m (Services) and €15m (Works) ↑
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- 1850 372 999 (24 HOUR/7 DAY SERVICE)
- For Faults/Emergencies (24 hours/7days service) Ring 1850 372 999 or
- mergencies (24 hours/7days service) Ring 1850 372 999 or
- 1 As a result of the introduction of the new electronic Relevant Contracts tax (e-RCT) system by the
- existing services or working hours, statutory consents and conditions attached thereto.
- are not construction operations subject to Relevant Contracts Tax (and Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- The Contractor may visit the site prior to submitting their tender in order to fully ascertain the existing
- existing services or working hours, statutory consents and conditions attached thereto.
- be refundable to all tenderers that submit bona fide tenders that are not
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ssional Indemnity Insurance required for € CA Entry[18] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[20] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Building Works / Pavings / Public Realm Works[16] € 750,000 *
- ssional Indemnity Insurance required for € CA Entry[18] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[20] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect
- Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[21] Entitles issuing
- 3 Minimum indemnity limit for public liability insurance: €6,500,000 for any one event
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| ssional Indemnity Insurance required for € CA Entry[18] The 2% not stated not stated | |||
| e claim below which the Contractor will bear the cost is the greater amount of 2 | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- [Invitation to Tender.pdf] Chartered Quantity Surveyors
- Suitability Assessment Questionnaire
- The Contractor may visit the site prior to submitting their tender in order to fully ascertain the existing
- Competitive tenders comprising the Schedule & Form of Tender, Suitability Assessment Questionnaire
- and the fully rated Pricing Document must be returned via the Etenders portal. Contractors shall refer
- [Invitation to Tender.pdf] , understanding or appreciation of the nature and complexities of
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-04-30T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-04-30T11:00:00+00:00 |
| Date surfaced in documents | 19 July 2023 |
| Date surfaced in documents | July 2023 |
| Date surfaced in documents | October 1998 |
8. Contract terms that matter
Contract duration in the extract: 5 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
- e Schedule says that a performance bond is required, within 7 days after the Employer sends
- When a payment is to be made, not later than 5 days after the date agreed between the
- Within 14 days of receiving the payment claim notice,
- n to put in place arrangements to complete the Works within 6 months after the termination, the Employer’s R
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Invitation to Tender.pdf, Instructions to Tenderers.pdf, where
[Instructions to Tenderers.pdf.
- eTenders CFT / notice reference: contract notice for the Works to etenders.2.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule says that a performance bond is required, within 7 days after the Employer send, Schedule and Form of Tender, scheduled to commence in May 2024..
This tender has been awarded
- ML. and S Boland Civil Engineering Ltd. · 17 Nov 2025
- ML. and S Boland Civil Engineering Ltd. · 03 Mar 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€750,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€50,000
Scoring
Lowest Price
Lowest Price
Lots (1)
Landscaping, tree removal, footpath widening, bicycle shelters, EV charging points, and other public infrastructure works.
Documents (38)
2024_02_29_Brochures_EN_V2_DUO.pdf
5.4 MB · Specification
23-1018-T-05-Landscaping.pdf
1.6 MB · Specification
23-1018-T-11-Bike Stands Detail.pdf
380.0 KB · Specification
Bicycle Shelter.pdf
1.8 MB · Specification
RS76.pdf
1.4 MB · Specification
Instructions to Tenderers.pdf
577.3 KB · RFT / Invitation to Tender
Invitation to Tender.pdf
379.5 KB · RFT / Invitation to Tender
Mountshannon BOQ.pdf
490.4 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx
47.9 KB · Contract / Agreement / Terms
PW-CF6-v1.14-19-07-2023.pdf
612.0 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS-v3.0-28-07-2023.docx
43.7 KB · Form / Declaration / Certificate
Form of Tender and Schedule.pdf
367.5 KB · Form / Declaration / Certificate
QW2-Part-1-v2.0-28-07-2023 (1).docx
199.9 KB · Form / Declaration / Certificate
23-1018-T-01-Site Location Plan.pdf
448.3 KB · Drawing / Plan / Layout
23-1018-T-02-Existing Survey.pdf
902.0 KB · Drawing / Plan / Layout
23-1018-T-03-Proposed Layout.pdf
1.4 MB · Drawing / Plan / Layout
23-1018-T-04-Proposed Layout.pdf
1.2 MB · Drawing / Plan / Layout
23-1018-T-06-Landscaping.pdf
1.6 MB · Drawing / Plan / Layout
23-1018-T-07-Overall Layout.pdf
1.6 MB · Drawing / Plan / Layout
23-1018-T-08-Drainage Layout.pdf
988.7 KB · Drawing / Plan / Layout
23-1018-T-09-Paving Details.pdf
1.3 MB · Drawing / Plan / Layout
23-1018-T-10-Bench Seating Detail.pdf
297.6 KB · Drawing / Plan / Layout
23-1018-T-12-Demolition Layout.pdf
615.8 KB · Drawing / Plan / Layout
23-1018-T-13-Road Markings.pdf
558.8 KB · Drawing / Plan / Layout
23-1018-T-14-Electrical Vehicle.pdf
1.0 MB · Drawing / Plan / Layout
CC-SCD-05138-01.pdf
282.6 KB · Drawing / Plan / Layout
ESB Networks-20230503-047_A3.pdf
466.6 KB · Drawing / Plan / Layout
plot.log
642 bytes · Drawing / Plan / Layout
TII Standard Traffic Calming Sign.pdf
89.8 KB · Drawing / Plan / Layout
ESB Construction Safety 28th 11.40.pdf
803.2 KB · Other
Preliminary H&S Plan.pdf
614.7 KB · Other
Gas Networks.pdf
1.1 MB
MF-1.31-Site-Closure-Costs-Supplement-29-07-2021 (1).docx
45.5 KB · Appendix / Annex
Mountshannon BOQ.xlsx
91.7 KB
MP3-1P2155-SD.pdf
375.2 KB
PW-CF6_Appointment_of_Project_Supervisor.doc
75.0 KB
RS-Foundation-Guide.compressed.pdf
548.3 KB
RS-Installation-Guide-01.compressed.pdf
1.2 MB
Original notice text
Clare County Council seeks to implement a Public Realm and Mobility Plan for Mountshannon, focusing on building, integrating, and operating specified services with compliant reporting and handover obligations over a 5-year period.
AI analysis updated 4 months ago
Value
€400k
Deadline
30 Apr
Buyer
Clare County CouncilLocation
Ireland
Procedure
Open
Clarification
18 Apr 2024
eTenders ID
3387189
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender