Works Contractor and PSCS for 17 Nr. Dwellings at Turagh Crescent, Cappamore, Co. Limerick
Value
€5.5m
Deadline
10 May
10 May 2024
Value
€5.5m
Deadline
10 May
Contract for construction of 17 dwellings in Cappamore, Limerick.
Contract for construction of 17 dwellings in Cappamore, Limerick.
Bidder profile
Ideal for mid-sized to large contractors with experience in public sector housing projects and established compliance processes.
Risks & flags
- High turnover requirement
- Insurance limits
- Complex compliance requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Clúid Housing Association |
| Title | Works Contractor and PSCS for 17 Nr. Dwellings at Turagh Crescent,Cappamore,Co. Limerick |
| CPV / category | works |
| Estimated value | 5500000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 Years |
| Submission deadline | 2024-05-10T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Clúid Housing Association ran this procurement for “Works Contractor and PSCS for 17 Nr. Dwellings at Turagh Crescent,Cappamore,Co. Limerick” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- independently supported on a minimum of 4No
- · Heating Systems in Buildings – BS EN 12828:2012+A1:2014
- · Steel Piping Systems – BS EN 13408-3 2011
- · Vessels for Unvented Storage systems – BS ISO 7026:1997
- tilation system shall be commissioned in accordance with IS EN 14134:2019
- basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden
- Persons under a contract of service or apprenticeship with the insured
- Persons under a contract of service or apprenticeship with the insured.
- Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial
- data, steam, air, or other services, and associated apparatus and structures.
- Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration
- The Contractor’s agent19 in the Republic of Ireland for service of legal process is: Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Contractors All Risks Insurance to provide a minimum policy limit of €7,000,000
- Property of the insured or in the insured’s custody or control other than existing premises and their contents
- Sub-clause 3.8 (Existing Facilities and Use or Occupation by Employer) shall not apply.
- Delay Events, Compensation Events, Programme Contingency, Delay Costs, Adjustments
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 3,500,000 Minimum level of Professional Indemnity Insurance required for € 2,500,000 Maximum permissible excess on Profe; Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liabili
- Certifications — not specified for this tender
- Past experience — 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 3,500,000 Minimum level of Professional Indemnity Insurance required for € 2,500,000 Maximum permissible excess on Profe
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 3 Years Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction € 3,500,000 Minimum level of Professional Indemnity Insurance required for € 2,500,000 Maximum permissible excess on Profe
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liabili
- Minimum indemnity limit for Public liability insurance: €6,500,000 with specific indemnities to Clúid Housi
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000 6,500,000 with specific indemnities to
- Maximum excess for Public liability: €10,00010 in respect of property damage only
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- the Pricing Document is more than €500.
- These are to be submitted within a minimum of 2 weeks and maximum of 4 weeks prior to the
- [Cappamore - FTS-1-v2.6-17-07-2023 (1).pdf] Tender and Schedule
- Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information,
- We submit with this Tender the completed Pricing Document and Schedule and Works Proposals which form part
- [Cappamore - FTS-1-v2.6-17-07-2023 (1).pdf] information,
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-05-10T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-05-10T11:00:00+00:00 |
| Date surfaced in documents | 17 July 2023 |
| Date surfaced in documents | July 2023 |
| Date surfaced in documents | Act 2010 |
8. Contract terms that matter
Contract duration in the extract: 3 Years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 0.00 14
- Minimum amount for interim payments, except release of retention, € 0
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 3
- · Steel Piping Systems – BS EN 13408-3 2011
- · Copper Pipe – BS EN 1057:2006+A1:2010
- · Pipe Fittings – BS EN 1092-2:1997
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Cappamore - FTS-1-v2.6-17-07-2023 (1).pdf, Please choose from the options in the drop-down menu on the left
[Cappamore - FTS-1-v2.6-17-07-2023 (1).pdf, W2032 Electrical Appendix No.1 - Electrical Equipment Schedule.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule, Schedule for the Public Works Contract for Building Works Designed by the Employer, Schedule for Public Works Contract for Building Works Designed by the Employer.
This tender has been awarded
- Finna Construction Ltd · 27 May 2025
Can you bid?
Required certifications
- EN 13242
Minimum turnover
€3,500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Technical Merit
Price
Lots (1)
Mechanical, civil, structural, and landscaping works for a residential development.
Documents (253)
20014 Civil and Structural Specification.pdf
1.7 MB · Specification
2020013 List of Preferred Products (tender).pdf
293.3 KB · Specification
20240315 BCAR LimCC Cluid.pdf
7.3 MB · Specification
21491-3-D02 revA Soft Landscape Specification 2023-12-22.pdf
360.0 KB · Specification
CJFA Residential Dev Turagh Cresent 21.11.2023.pdf
6.1 MB · Specification
KCC_2311005_2023_11_21.pdf
429.9 KB · Specification
M&E DCENG Preliminary DRA Tender.pdf
151.9 KB · Specification
W2032 Electrical Specification.pdf
254.9 KB · Specification
W2032 General Mechanical Specification Sect.03.pdf
803.4 KB · Specification
W2032 Particular Mechanical Specification Sect04.pdf
326.4 KB · Specification
W24174~1.PDF
480.5 KB · Specification
Cappamore - FTS-1-v2.6-17-07-2023 (1).pdf
494.5 KB · RFT / Invitation to Tender
Cappamore ITT-W2-v2.5-01-08-2023-1.pdf
369.3 KB · RFT / Invitation to Tender
21491-3-D01 revA Bills of Qty_Soft Landscape 2024-01-09.pdf
177.7 KB · Pricing / BOQ / Schedule of Rates
Residential Development Turagh Cresent Cappamore Build 21.11.2023 (1).pdf
1.7 MB · Pricing / BOQ / Schedule of Rates
W2032 Electrical Pricing Document.pdf
238.5 KB · Pricing / BOQ / Schedule of Rates
W2032 Mechanical Pricing Document.pdf
718.5 KB · Pricing / BOQ / Schedule of Rates
MF-1.10-09-04-2020.docx
51.1 KB · Contract / Agreement / Terms
20014 - C&S MOR - Design Risk Assessment Tender.pdf
192.1 KB · Form / Declaration / Certificate
2020013 List of Required Submittals (tender).pdf
314.6 KB · Form / Declaration / Certificate
AF1 CR97211.pdf
36.0 KB · Form / Declaration / Certificate
MF-1.13-09-04-2020.docx
46.0 KB · Form / Declaration / Certificate
MF-1.6-09-04-2020 (1).docx
55.6 KB · Form / Declaration / Certificate
SAQ Part-2-v1.0-28-07-2023-2.docx
69.9 KB · Form / Declaration / Certificate
SAQ QW2-Part-1-v2.0-28-07-2023.docx
193.5 KB · Form / Declaration / Certificate
100 - Site Layout - Rev 1.pdf
1.2 MB · Drawing / Plan / Layout
101 - Drainage Layout - Rev 3.pdf
1.6 MB · Drawing / Plan / Layout
102 - Watermain Layout - Rev 1.pdf
1.2 MB · Drawing / Plan / Layout
103 - Drainage Longsections - Rev 0.pdf
387.2 KB · Drawing / Plan / Layout
104 - Site Set Out and Visibility Splay - Rev 1.pdf
1.2 MB · Drawing / Plan / Layout
105 - Swept Path Analysis - Rev 1.pdf
1.1 MB · Drawing / Plan / Layout
106 - Surface Water SUDS Layout - Rev 2.pdf
1.5 MB · Drawing / Plan / Layout
107 - SUDS Property Layout - Rev 2.pdf
740.7 KB · Drawing / Plan / Layout
108 - Road Layout and Longitudinal sections - Rev 1.pdf
824.4 KB · Drawing / Plan / Layout
109 - Attenuation Tanks Details - Rev 1.pdf
775.1 KB · Drawing / Plan / Layout
110 - SUDS Details - Rev 2.pdf
765.3 KB · Drawing / Plan / Layout
120 - Site Development Details - Sheet 1 - Rev 0.pdf
471.0 KB · Drawing / Plan / Layout
121 - Site Development Details - Sheet 2 - Rev 1.pdf
612.2 KB · Drawing / Plan / Layout
122 - Site Development Details - Sheet 3 - Rev 2.pdf
1.0 MB · Drawing / Plan / Layout
200 - Block A - Ground, First Floor Plan & Roof Plan - Rev 3.pdf
424.9 KB · Drawing / Plan / Layout
210 - Block A1 - Ground Floor, First Floor Plan & Roof Plan - Rev 2.pdf
491.5 KB · Drawing / Plan / Layout
21491-3-301_Site Clearance Plan_2024-01-31.pdf
3.7 MB · Drawing / Plan / Layout
21491-3-401 revE General Arrangement Plan-2024-03-12.pdf
4.1 MB · Drawing / Plan / Layout
21491-3-701 revD Planting Plan _2024-03-12.pdf
1.9 MB · Drawing / Plan / Layout
21491-3-901 revA_Cappamore_Details_1_2023-12-20.pdf
535.5 KB · Drawing / Plan / Layout
21491-3-902 revA_Cappamore_Details_2_2023-12-20.pdf
2.0 MB · Drawing / Plan / Layout
21491-3-903_Cappamore_Details_3_2023-12-07.pdf
1.5 MB · Drawing / Plan / Layout
21491-3-904 revA_Cappamore_Details_4_2023-12-20.pdf
529.4 KB · Drawing / Plan / Layout
21491-3-905_Cappamore_Details_5_2023-12-07.pdf
397.1 KB · Drawing / Plan / Layout
220 - Block B - Ground Floor, First Floor Plan & Roof Plan - Rev 2.pdf
495.7 KB · Drawing / Plan / Layout
230 - Block C - Ground Floor, First Floor Plan & Roof Plan - Rev 1.pdf
515.9 KB · Drawing / Plan / Layout
240 - Block D - Ground Floor & Roof Plan - Rev 1.pdf
361.2 KB · Drawing / Plan / Layout
250 - Block D1 - Ground Floor & Roof Plan - Rev 1.pdf
365.2 KB · Drawing / Plan / Layout
260 - Block E - Ground Floor & Roof Plan - Rev 1.pdf
344.7 KB · Drawing / Plan / Layout
270 - Lean Mix Thickness Under Foundation - Rev 1.pdf
1.1 MB · Drawing / Plan / Layout
271 - Typical Structural Detail Sheet 1 - Rev 0.pdf
407.6 KB · Drawing / Plan / Layout
272 - Typical Roof & Bracing Details - Rev 0.pdf
459.4 KB · Drawing / Plan / Layout
276 - Boundary Wall Details - Rev 1.pdf
1.2 MB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0103 - Site Layout Plan.pdf
2.9 MB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0104 - Site Boundary Treatment.pdf
2.7 MB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0200 - HOUSE TYPE A - GROUND, FIRST FLOOR PLAN & ROOF PLAN.pdf
175.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0201 - HOUSE TYPE A1 - GROUND FLOOR, FIRST FLOOR PLAN & ROOF PLAN.pdf
174.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0202 - HOUSE TYPE B - GROUND FLOOR, FIRST FLOOR PLAN & ROOF PLAN.pdf
180.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0203 - HOUSE TYPE C - GROUND FLOOR, FIRST FLOOR PLAN.pdf
192.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0204 - HOUSE TYPE D - GENERAL ARRANGEMENT.pdf
108.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0205 - HOUSE TYPE D1 - GENERAL ARRANGEMENT.pdf
107.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0206 - HOUSE TYPE E - GENERAL ARRANGEMENT.pdf
141.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0300 - TYPICAL SECTION - HOUSE TYPE A+B.pdf
104.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0301 - HOUSE TYPE A1 - SECTION A-A.pdf
104.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0302 - HOUSE TYPE B - SECTION A-A.pdf
83.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0302 - HOUSE TYPE C - SECTION A-A & ROOF PLAN.pdf
116.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0303 - TYPICAL SECTION - HOUSE TYPE D + D1.pdf
81.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0304 - TYPICAL SECTION - HOUSE TYPE E.pdf
83.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0400 - HOUSE TYPE A - FRONT & REAR ELEVATIONS.pdf
501.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0401 - HOUSE TYPE A - SIDE ELEVATIONS.pdf
240.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0402 - HOUSE TYPE A1 - FRONT & REAR ELEVATIONS.pdf
464.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0403 - HOUSE TYPE A1 - SIDE ELEVATIONS.pdf
272.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0404 - HOUSE TYPE B - FRONT & REAR ELEVATIONS.pdf
502.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0405 - HOUSE TYPE B - SIDE ELEVATIONS.pdf
285.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0406 - HOUSE TYPE C - FRONT & REAR ELEVATIONS.pdf
879.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0407 - HOUSE TYPE C - SIDE ELEVATIONS.pdf
254.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0410 - HOUSE TYPE D - FRONT & REAR ELEVATION.pdf
412.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0411 - HOUSE TYPE D - SIDE ELEVATIONS.pdf
177.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0412 - HOUSE TYPE D1 - FRONT & REAR ELEVATION.pdf
403.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0413 - HOUSE TYPE D1 - SIDE ELEVATIONS.pdf
178.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0414 - HOUSE TYPE E - FRONT & REAR ELEVATION.pdf
361.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-PL-A - 0415 - HOUSE TYPE E - SIDE ELEVATIONS.pdf
167.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-XX-RG-A-0001_(20240313) Tender Issue.pdf
168.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0102_Site Location Plan & Site Notice.pdf
273.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0103.pdf
520.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0104.pdf
187.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0105_Site Survey Plan A1.pdf
620.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0110-Proposed Site Sections.pdf
1021.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0200_BLOCK A_FLOOR PLANS.pdf
547.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0201_BLOCK A_ROOF PLANS.pdf
148.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0202_BLOCK A_RADON PLAN.pdf
283.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0210_BLOCK A1_FLOOR PLANS.pdf
515.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0211_BLOCK A1_ROOF PLANS.pdf
149.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0212_BLOCK A1_RADON PLAN.pdf
275.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0220_BLOCK B_FLOOR PLANS.pdf
527.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0221_BLOCK B_ROOF PLANS.pdf
154.0 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0222_BLOCK B_RADON PLAN.pdf
278.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0230_BLOCK C_FLOOR PLANS.pdf
668.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0231_BLOCK C_ROOF PLANS.pdf
218.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0232_BLOCK C_RADON PLAN.pdf
325.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0240_BLOCK D_FLOOR PLANS.pdf
289.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0241_BLOCK D_ROOF PLANS.pdf
128.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0242_BLOCK D_RADON PLAN.pdf
243.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0250_BLOCK D1_FLOOR PLANS.pdf
292.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0251_BLOCK D1_ROOF PLANS.pdf
128.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0252_BLOCK D1_RADON PLAN.pdf
244.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0260_BLOCK E_FLOOR PLANS.pdf
283.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0261_BLOCK E_ROOF PLANS.pdf
127.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0262_BLOCK E_RADON PLAN.pdf
239.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0300_SECTION AA.pdf
424.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0301_SECTION BB.pdf
703.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0302_SECTION CC.pdf
403.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0400_BLOCK A_ELEVATIONS.pdf
231.0 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0401_BLOCK A_ELEVATIONS.pdf
188.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0402_BLOCK A1_ELEVATIONS.pdf
216.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0403_BLOCK A1_ELEVATIONS.pdf
188.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0404_BLOCK B_ELEVATIONS.pdf
219.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0405_BLOCK B_ELEVATIONS.pdf
183.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0406_BLOCK C_ELEVATIONS.pdf
243.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0407_BLOCK C_ELEVATIONS.pdf
185.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0408_BLOCK D_ELEVATIONS.pdf
166.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0409_BLOCK D_ELEVATIONS.pdf
142.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0410_BLOCK D1_ELEVATIONS.pdf
166.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0411_BLOCK D1_ELEVATIONS.pdf
143.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0412_BLOCK E_ELEVATIONS.pdf
158.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0413_BLOCK E_ELEVATIONS.pdf
132.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0500_WINDOW SCHEDULE_SHEET 1.pdf
153.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0501_WINDOW SCHEDULE_SHEET 2.pdf
149.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0505_EXTERNAL DOOR SCHEDULE.pdf
201.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0510_INTERNAL DOOR SCHEDULE.pdf
141.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0520_KITCHEN SCHEDULE_SHEET 1.pdf
311.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0521_KITCHEN SCHEDULE_SHEET 2.pdf
311.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0522_KITCHEN SCHEDULE_SHEET 3.pdf
316.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0523.pdf
380.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0523_KITCHEN SCHEDULE_SHEET 4.pdf
380.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0600.pdf
228.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0600_Bin Store.pdf
206.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0601.pdf
238.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0602.pdf
272.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0603.pdf
268.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0604.pdf
285.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0605.pdf
223.0 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0606.pdf
310.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0607.pdf
159.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0608.pdf
154.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0609.pdf
196.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0610.pdf
208.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0611.pdf
132.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0612.pdf
208.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0613.pdf
136.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0614.pdf
113.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0615.pdf
226.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0616.pdf
150.2 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0617.pdf
142.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0618.pdf
195.3 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0619.pdf
306.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0620.pdf
238.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0621.pdf
218.0 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0622.pdf
124.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0623.pdf
126.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0624.pdf
131.8 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0625.pdf
325.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0626.pdf
124.9 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0627.pdf
124.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0628.pdf
142.1 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0629.pdf
157.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0630.pdf
185.4 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0631.pdf
98.6 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A-0650_Boundary Treatment.pdf
183.7 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A_0101.pdf
2.1 MB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-DR-A_0102.pdf
634.5 KB · Drawing / Plan / Layout
CHC-CJFA-00-ZZ-PL-A-0007_Issue Sheet - 11.09.2023.pdf
105.7 KB · Drawing / Plan / Layout
W2032 A-C800.pdf
167.9 KB · Drawing / Plan / Layout
W2032 A-E100.pdf
297.7 KB · Drawing / Plan / Layout
W2032 A-E200.pdf
281.9 KB · Drawing / Plan / Layout
W2032 A-M100.pdf
303.1 KB · Drawing / Plan / Layout
W2032 A-M200.pdf
313.6 KB · Drawing / Plan / Layout
W2032 A-M300.pdf
287.4 KB · Drawing / Plan / Layout
W2032 A-M400.pdf
269.9 KB · Drawing / Plan / Layout
W2032 A1-E100.pdf
304.7 KB · Drawing / Plan / Layout
W2032 A1-E200.pdf
288.2 KB · Drawing / Plan / Layout
W2032 A1-M100.pdf
309.9 KB · Drawing / Plan / Layout
W2032 A1-M200.pdf
319.2 KB · Drawing / Plan / Layout
W2032 A1-M300.pdf
295.8 KB · Drawing / Plan / Layout
W2032 A1-M400.pdf
277.1 KB · Drawing / Plan / Layout
W2032 B-E100.pdf
306.0 KB · Drawing / Plan / Layout
W2032 B-E200.pdf
296.7 KB · Drawing / Plan / Layout
W2032 B-M100.pdf
314.8 KB · Drawing / Plan / Layout
W2032 B-M200.pdf
325.0 KB · Drawing / Plan / Layout
W2032 B-M300.pdf
298.4 KB · Drawing / Plan / Layout
W2032 B-M400.pdf
290.8 KB · Drawing / Plan / Layout
W2032 C-E100.pdf
395.8 KB · Drawing / Plan / Layout
W2032 C-E200.pdf
385.5 KB · Drawing / Plan / Layout
W2032 C-M100.pdf
403.6 KB · Drawing / Plan / Layout
W2032 C-M200.pdf
410.2 KB · Drawing / Plan / Layout
W2032 C-M300.pdf
388.8 KB · Drawing / Plan / Layout
W2032 C-M400.pdf
367.5 KB · Drawing / Plan / Layout
W2032 D-E100.pdf
199.0 KB · Drawing / Plan / Layout
W2032 D-E200.pdf
192.5 KB · Drawing / Plan / Layout
W2032 D-M100.pdf
198.1 KB · Drawing / Plan / Layout
W2032 D-M200.pdf
216.6 KB · Drawing / Plan / Layout
W2032 D-M300.pdf
191.0 KB · Drawing / Plan / Layout
W2032 D-M400.pdf
173.9 KB · Drawing / Plan / Layout
W2032 D1-E100.pdf
197.9 KB · Drawing / Plan / Layout
W2032 D1-E200.pdf
191.7 KB · Drawing / Plan / Layout
W2032 D1-M100.pdf
214.0 KB · Drawing / Plan / Layout
W2032 D1-M200.pdf
227.6 KB · Drawing / Plan / Layout
W2032 D1-M300.pdf
201.4 KB · Drawing / Plan / Layout
W2032 D1-M400.pdf
185.8 KB · Drawing / Plan / Layout
W2032 E-E100.pdf
193.7 KB · Drawing / Plan / Layout
W2032 E-E200.pdf
188.1 KB · Drawing / Plan / Layout
W2032 E-M100.pdf
195.5 KB · Drawing / Plan / Layout
W2032 E-M200.pdf
215.5 KB · Drawing / Plan / Layout
W2032 E-M300.pdf
185.6 KB · Drawing / Plan / Layout
W2032 E-M400.pdf
172.2 KB · Drawing / Plan / Layout
W2032 E700.pdf
89.2 KB · Drawing / Plan / Layout
W2032 E701.pdf
291.7 KB · Drawing / Plan / Layout
W2032 M180.pdf
80.9 KB · Drawing / Plan / Layout
W2032 MES1000-1.pdf
1.4 MB · Drawing / Plan / Layout
W2032 MES1000-2.pdf
1.4 MB · Drawing / Plan / Layout
W2032 MES1000-3.pdf
1.4 MB · Drawing / Plan / Layout
W2032 MES1000-4.pdf
1.1 MB · Drawing / Plan / Layout
2020013 Preliminary H&S Plan.pdf
2.2 MB · Other
18738-100-02.pdf
558.4 KB
18738-102-02.pdf
459.1 KB
2020013 Architectural Specification.pdf
1.8 MB
2020013 Finishes Schedule (tender).pdf
61.1 KB · Appendix / Annex
20230711_Notification of Grant of Permission.pdf
480.9 KB
21491-3- issue sheet_ Cappamore_2024-01-31.pdf
200.1 KB · Appendix / Annex
21491-3- issue sheet_ Cappamore_2024-03-12.pdf
235.4 KB · Appendix / Annex
23120-01-001-RSA1-2 (Signed).pdf
3.6 MB · Appendix / Annex
5738 Cappaghmore SI Report.pdf
12.5 MB
CHC-CJFA-Planning Tracker 02.02.24.pdf
540.5 KB · Appendix / Annex
CJFA PQP 6.02 DRA Tender.pdf
603.5 KB · Appendix / Annex
MF-1.11-09-04-2020.docx
46.6 KB · Insurance / Indemnity
Schedule of Testing.pdf
36.3 KB · Appendix / Annex
W2032 Appendix No.01 Schedule of Radiators.pdf
382.0 KB · Appendix / Annex
W2032 Appendix No.02 Schedule of DCV Units.pdf
24.3 KB · Appendix / Annex
W2032 Appendix No.03 Schedule of Extract Grilles & Wall Louvres.pdf
24.6 KB · Appendix / Annex
W2032 Appendix No.04 Schedule of External Wall Louvres & Roof Cowls.pdf
18.1 KB · Appendix / Annex
W2032 Appendix No.05 Schedule of Water Storage Tanks.pdf
19.5 KB · Appendix / Annex
W2032 Appendix No.06 Schedule of Booster Pumps.pdf
19.5 KB · Appendix / Annex
W2032 Appendix No.07 O&M Checklist.pdf
123.9 KB · Appendix / Annex
W2032 Appendix No.08 Schedule of Split Style Heat Pumps.pdf
43.5 KB · Appendix / Annex
W2032 Appendix No.09 Schedule of Fire Extinguishers and Blankets.pdf
52.5 KB · Appendix / Annex
W2032 Electrical Appendix No.1 - Electrical Equipment Schedule.pdf
433.5 KB · Appendix / Annex
W2032 Electrical Appendix No.2 - Utility Provider Typical Details.pdf
1.7 MB · Appendix / Annex
W2032 Electrical Document Register.pdf
200.0 KB · Appendix / Annex
Original notice text
Clúid Housing Association seeks a contractor for the construction of 17 dwellings at Turagh Crescent, Cappamore, Co. Limerick, with a contract duration of 3 years and an estimated value of €5.5 million.
AI analysis updated 4 months, 1 week ago
Value
€5.5m
Deadline
10 May
Location
Cappamore, Co. Limerick, Ireland.
Procedure
Open
Clarification
19 Apr 2024
eTenders ID
3342983
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender