N59 Derradda to Newport Road Project – Main Construction Contract
Value
€29.0m
Deadline
18 Jul
18 Jul 2024
Value
€29.0m
Deadline
18 Jul
Main construction contract for the N59 Derradda to Newport Road project over 10 years
Main construction contract for the N59 Derradda to Newport Road project over 10 years
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in road construction.
Risks & flags
- Qualification gate turnover threshold
- Two-step process compliance effort
- Ambiguity in ITT requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Mayo County Council_1127 |
| Title | N59 Derradda to Newport Road Project – Main Construction Contract |
| CPV / category | works |
| Estimated value | 29000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 years |
| Submission deadline | 2024-07-18T16:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Mayo County Council_1127 ran this procurement for “N59 Derradda to Newport Road Project – Main Construction Contract” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- SUPPLEMENTARY REQUIREMENTS CThe Contractor shall operate an ISO 9001 certified quality management system or equivalent
- SUPPLEMENTARY REQUIREMENTS The Contractor shall operate an ISO 9001 certified quality management system or equivalent
- successful Tenderer shall be required to supply its Tax Clearance Access
- status by the Contracting Authority. By supplying these numbers the
- [Invitation to Tender, Instructions to Tenderers Rev3.pdf] Authority. By supplying these numbers the
- prior knowledge of their organisation or service provision. Tenderers will only be
- the Contracting Authority’s third party service providers, such as
- platform. The Contracting Authority may under section 2.2 still issue any
- information it considers appropriate on the eTenders platform following
- to the eTenders platform, Candidates are advised to ensure that they give
- purpose. Candidates should ensure that their operating system has
- Schedule and Standing Conciliator services (if required) at Part 1N of the Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- and retention policy, a copy of which can be obtained from the Contracting
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; s/Work: Yearly Turnover arising from the area of work specified: Road and Bridge Construction Works € 6 million per annum excluding VAT Minimum level of Professional Indemnity Insurance required for € 2,500,000 Maximum permissible excess on Profe; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liabili
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- s/Work: Yearly Turnover arising from the area of work specified: Road and Bridge Construction Works € 6 million per annum excluding VAT Minimum level of Professional Indemnity Insurance required for € 2,500,000 Maximum permissible excess on Profe
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 Minimum level of Employer’s Liabili
- Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000 Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 Minimum level of Employer’s Liabili
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| in any one claim below which the will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| claim below which the Contractor will bear the cost is the greater amount of 2% | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- The Applicant shall submit a minimum of 2 and a maximum of 5 reference projects where the Applicant has acted as PSCS in construction of Road Projects
- The Applicant shall submit a minimum of 2 and a maximum of 5 reference projects where the Applicant has acted as Main Contractor responsible for Health and Safety of Road Projects
- CA SUPPLEMENTARY REQUIREMENTS The Tenderer shall submit details of a minimum of 2 and a maximum of 5 reference projects, where the Tenderer acted as main contractor, whether as the sole main contractor, or as part of a joint venture in Civil Engineering works projects, using the
- CA REQUIREMENT: The Tenderer shall submit details of a minimum of 2 reference projects, where the Tenderer acted as main contractor, whether as the sole main contractor, or as part of a joint venture in Civil Engineering works projects, outlining how the Tenderer a
- CA REQUIREMENT: The Tenderer shall submit details of a minimum of 2 reference projects, where the Tenderer acted as main contractor, whether as the sole main contractor, or as part of a joint venture in Civil Engineering works projects, outlining how the Tenderer m
- [Invitation to Tender, Instructions to Tenderers Rev3.pdf] NRA Project Code:
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-07-18T16:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-07-18T16:00:00+00:00 |
| Date surfaced in documents | 0 March 2024 |
| Date surfaced in documents | 3 July 2024 |
| Date surfaced in documents | 1 April 2024 |
8. Contract terms that matter
Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
- we respectfully request an extension to the tender date of 4 weeks from the 16th May 2024 to the 13th June
- e Tenderer’s current principal banker dated within the past 3 months stating the duration of the relationshi
- cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
- e Tenderer’s current principal banker dated within the past 3 months
- procurement process or any part of it and may terminate the process or any
- [Invitation to Tender, Instructions to Tenderers Rev3.pdf] or any part of it and may terminate the process or any
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Invitation to Tender, Instructions to Tenderers Rev3.pdf, ITT-W2 v 2.5 01/08/2023, ITT-W2 V2.5.
- eTenders CFT / notice reference: contract notice for the Works to.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule, Appendix 3 to these Instructions, Schedule (Volume B).
This tender has been awarded
- Fox Contracts · 24 Feb 2025
- Fox Contracts · 19 Feb 2025
Can you bid?
Required certifications
- ISO 9001
Minimum turnover
€6,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Lots (1)
Documents (17)
Invitation to Tender, Instructions to Tenderers Rev3.pdf
432.1 KB · RFT / Invitation to Tender
N59 D-N - SAQ Supplement 3.4.1-HS-Contractor Rev 0 March2024.docx
51.3 KB · Contract / Agreement / Terms
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
25.6 KB · Form / Declaration / Certificate
Appendix-E-Declaration-in-relation-to-Russian-Sanctions.docx
24.0 KB · Form / Declaration / Certificate
N59 D-N - SAQ QW-Part-2-v1.0 Rev 0 March2024.docx
70.8 KB · Form / Declaration / Certificate
N59 D-N - SAQ QW2-Part-1-v2.0 Rev0 March2024.docx
201.3 KB · Form / Declaration / Certificate
N59 D-N - SAQ QW2-Part-1-v2.0 Rev1 June2024.docx
187.2 KB · Form / Declaration / Certificate
N59 D-N - SAQ Supplement 3.4.2-HS-PSCS Rev 0 March2024.docx
46.1 KB · Form / Declaration / Certificate
2024 N59 DN Sample Lines.txt
3.6 KB · Drawing / Plan / Layout
N59 Derradda to Newport -Archaeology Completion Letter_22-04-24.pdf
100.4 KB · Other
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
31.3 KB · Appendix / Annex
Appendix-C-Bankers-Letter.docx
29.9 KB · Appendix / Annex
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
26.8 KB · Appendix / Annex
N59 Derradda to Newport -Testing-Final-Report.pdf
14.8 MB
Tender Bulletin No1 25April2024.pdf
353.3 KB · Clarification / Addendum
Tender Bulletin No2 09 May2024.pdf
547.1 KB · Clarification / Addendum
Original notice text
Mayo County Council seeks a contractor for the N59 Derradda to Newport Road project, focusing on construction and operational service execution over a 10-year period.
AI analysis updated 4 months ago
Value
€29.0m
Deadline
18 Jul
Buyer
Mayo County CouncilLocation
N59 Derradda to Newport Road, Ireland
Procedure
Open
Clarification
16 May 2024
eTenders ID
3253296
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender