Regional and Local Road Pavement Overlay Scheme 2024
Value
€2.0m
Deadline
25 Apr
25 Apr 2024
Value
€2.0m
Deadline
25 Apr
Clare County Council seeks contractors for road pavement overlay works.
Clare County Council seeks contractors for road pavement overlay works.
Bidder profile
Ideal for mid-sized to large contractors with experience in public sector road works and compliance processes.
Risks & flags
- Qualification gate
- Two-step process
- Technical ambiguity at qualification stage
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Clare County Council |
| Title | Regional and Local Road Pavement Overlay Scheme 2024 |
| CPV / category | works |
| Estimated value | 2000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 months |
| Submission deadline | 2024-04-25T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Clare County Council ran this procurement for “Regional and Local Road Pavement Overlay Scheme 2024” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- Details of the Contractor’s initial management arrangements for performing its Contract responsibilities, including systems, methods, planning and other preparations for providing personnel and resources, programming, recording, consultation, co-ordination and co-operation, and for flexibility, as referred to in the Contract. Details of the Applicant's project supervisor construction stage, if different from the Applicant (clause 2.4), details of the Applicant's representative and supervisor (4.2.3). Detailed CVs for key project staff (Contract Manager, PSCS, Project Manager, Site Engineer, Foreman, Traffic Management Design Specialist)
- Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
- Persons under a contract of service or apprenticeship with the insured
- Persons under a contract of service or apprenticeship with the insured.
- Effecting or maintenance of insurance of or in connection with
- Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial matters
- Existing Utility Services, Access to houses, Existing Structures, Bridges
- Utilities means conducting media and apparatus for water, sewage, electricity, gas, oil, telecommunications, data, steam, air, or other services, and associated apparatus and structures.
- The arbitration rules are the Capital Works Management Framework (CWMF) Arbitration Rules for use with Public Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration-rules/ on the date 10 days before the latest date for submission of Tenders for this contract (disregarding any amendments posted on that date).
- The Contractor’s agent[18] in the Republic of Ireland for service of legal process is:
- The Contractor’s tendered percentage addition to costs of labour shall include all costs incurred by the Contractor (excluding VAT) for those workers engaged on additional or substituted work required as a result of a Compensation Event, that are additional to the basic hourly rate of pay for the relevant category of worker in an applicable sectoral employment order made under the Industrial Relations Acts 1946-2015. It shall include (but not be limited to) the following components of cost: All costs incurred with meeting legal requirements (including but not limited to PRSI), pension contributions, death in service contributions, sick pay contributions; and Plus Rates; and Allowances; and overheads; and profit and loss of profit. Plus Rates A Plus Rate is the balance remaining when the basic hourly rate of pay for the relevant category of worker under an applicable sectoral employment order made under the Industrial Relations Acts 1946-2015 is deducted from the basic hourly rate of pay paid to a worker in accordance with the workers terms and conditions of employment. It does not include Allowances. Allowances Allowances are payments made to workers that are additional to the basic rate of pay paid to a worker and may include (but not limited to): 1. any bonuses, productivity, incentive or other bonus; 2. any special allowances particular to the category of worker ( Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
- The Employer have the risk of loss of and damage to its existing facilities and parts of the Works it uses or occupies, in accordance with sub-clause 3.8.
- Existing Utility Services, Access to houses, Existing Structures, Bridges
- K Delay Events, Compensation Events, Programme Contingency, Delay Costs, Adjustments(Sub-clauses 9.3, 9.4, 10.1, 10.6, 10.7)
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[7] for any one event
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, bu
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000[7] for any one event
- Maximum excess for Public liability €10,000~~[9]~~ in respect of pro
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| The Contractor’s tendered percentage addition to costs of labour *(If negative 0% not stated not stated | |||
| The Contractor’s tendered percentage addition to costs of materials *(If negat 0% not stated not stated | |||
| The Contractor’s tendered percentage addition/deduction to costs of plant *(A 50% not stated not stated | |||
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- We have examined and understand the Public Works Contract for Civil Engineering Works Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information, for the above contract.
- We submit with this Tender the completed Pricing Document and Schedule which form part of this Tender.
- [Tender and Schedule.docx] of Quantities measured in accordance with the: as included in Volume C.* [Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where TII’s Requirements for Measuring and Pricing (RMP) is selected from the drop down menu above, it shall be the latest edition as published by Transport Infrastructure Ireland] [CA Note: Please choose from the options in the drop down menu below for Mechanical & Electrical Works] Mechanical & Electrical Works measured in accordance with: [Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework]
- Details of the Contractor’s initial management arrangements for performing its Contract responsibilities, including systems, methods, planning and other preparations for providing personnel and resources, programming, recording, consultation, co-ordination and co-operation, and for flexibility, as referred to in the Contract. Details of the Applicant's project supervisor construction stage, if different from the Applicant (clause 2.4), details of the Applicant's representative and supervisor (4.2.3). Detailed CVs for key project staff (Contract Manager, PSCS, Project Manager, Site Engineer, Foreman, Traffic Management Design Specialist)
- 17 A difference between the Contract value of the Works according to the quantities and descriptions in the Pricing Document and the Contract value of the Works described in the Works Requirements, because the Pricing Document, when compared with the Works Requirements includes an incorrect quantity or includes an item that that is not included in the Works Requirements or excludes an item that is included in the Works Requirements or gives an incorrect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-04-25T15:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-04-25T15:00:00+00:00 |
| Date surfaced in documents | 7 January 2022 |
| Date surfaced in documents | Scheme 2024 |
| Date surfaced in documents | September 2023 |
8. Contract terms that matter
Contract duration in the extract: 3 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- ect item description and the difference for an item in, or that should have been in, the Pricing Document is more than €500. No Yes
- Minimum amount for interim payments, except release of retention, € 100,000 [14]
- recipe to IS EN13108-1, Clause 906 (March
- Asphalt Concrete recipe to IS EN13108-1,
- It is anticipated that the Works will take 10 weeks in total
- Terms used in this Tender that are defined in those documents have the same meaning in this Tender.
- We offer to complete the Works on the terms of and in conformity with the documents referred to in the preceding paragraph for the lump sum of
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Tender and Schedule.docx, Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5
[Tender and Schedule.docx, Appendix A Designers Risk Assessment Pavement Overlay Contract 2024.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule, part 3D is* *“1, Schedule.docx] for, Schedule for Public Works Contract for Civil Engineering Works Designed by the Employer.
This tender has been awarded
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Most Economically Advantageous Tender
Lots (1)
Bituminous pavement overlay works across multiple locations in County Clare.
Documents (65)
ITT - Regional and Local Road Pavement Overlay Scheme 2024.docx
101.0 KB · RFT / Invitation to Tender
Tender and Schedule.docx
105.2 KB · RFT / Invitation to Tender
Volume C Pricing Document 26032024.pdf
932.1 KB · Pricing / BOQ / Schedule of Rates
Appendix A Designers Risk Assessment Pavement Overlay Contract 2024.pdf
167.8 KB · Contract / Agreement / Terms
~$2_Suitability_Assessment_Open_Form.doc
162 bytes · Form / Declaration / Certificate
2024 Regional Overlay Layout Drawing-24-006-01 Location Plan.pdf
2.9 MB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-02 - Binden Street.pdf
435.1 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-03 - Steels Terrace.pdf
387.3 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-04 - Fahy Hall - L8301.pdf
359.0 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-05 - College Road - L4558.pdf
391.9 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-06 - Circular Road - R474.pdf
441.1 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-07 - Cusack Road - R352.pdf
370.5 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-08 - Quin Road Flyover.pdf
306.5 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-09 - Quin Road Gurteen.pdf
374.3 KB · Drawing / Plan / Layout
2024 Regional Overlay Layout Drawing-24-006-10 - Gort Road - R458.pdf
688.8 KB · Drawing / Plan / Layout
24-001-001.pdf
14.1 MB · Drawing / Plan / Layout
24-001-002.pdf
339.5 KB · Drawing / Plan / Layout
24-001-003.pdf
341.1 KB · Drawing / Plan / Layout
24-001-004.pdf
324.1 KB · Drawing / Plan / Layout
24-001-005.pdf
361.3 KB · Drawing / Plan / Layout
24.WCMD.K.04-01.pdf
6.9 MB · Drawing / Plan / Layout
24.WCMD.K.04-02.pdf
636.8 KB · Drawing / Plan / Layout
24.WCMD.K.04-03.pdf
665.0 KB · Drawing / Plan / Layout
24.WCMD.K.04-04.pdf
471.2 KB · Drawing / Plan / Layout
24.WCMD.K.04-05.pdf
490.2 KB · Drawing / Plan / Layout
24.WCMD.K.04-06.pdf
429.5 KB · Drawing / Plan / Layout
24.WCMD.K.04-07.pdf
438.7 KB · Drawing / Plan / Layout
Dwg.001 - L7370 Carraig Lia, Shannon.pdf
736.8 KB · Drawing / Plan / Layout
Dwg.002 - L-3303 Bothar na Loiste, Shannon.pdf
661.5 KB · Drawing / Plan / Layout
Dwg.003 - Mount Ivers, Sixmilbridge.pdf
439.8 KB · Drawing / Plan / Layout
Dwg.004 - L-3050 & L-3058 Clonlara.pdf
436.6 KB · Drawing / Plan / Layout
Dwg.005 -Fairyfields , Parteen.pdf
330.3 KB · Drawing / Plan / Layout
Dwg.006 - Garrun L7052.pdf
245.5 KB · Drawing / Plan / Layout
Dwg.007 - R463 Corbally United to O'Connors Cross.pdf
306.9 KB · Drawing / Plan / Layout
Preliminary Safety and Health Plan 2024 issue T1.pdf
367.9 KB · Other
Design Process Traffic Management Plan 2024 issue T1.pdf
239.2 KB · Appendix / Annex
Location Map.pdf
6.4 MB
QW2-Appendix-D.docx.doc
32.5 KB
QW2-Appendix-E.docx.doc
41.5 KB
QW2-Appendix-F.docx.doc
40.0 KB
QW2-Appendix-G.docx.doc
33.0 KB
QW2_Appendix_A1.doc
31.5 KB
QW2_Appendix_A2.doc
39.5 KB
QW2_Appendix_B1.doc
67.0 KB
QW2_Appendix_B2.doc
48.0 KB
QW2_Appendix_B3.doc
49.5 KB
QW2_Appendix_C1.doc
45.5 KB
QW2_Appendix_C2.doc
47.0 KB
QW2_Appendix_C3.doc
46.0 KB
QW2_Appendix_C4.doc
46.5 KB
QW2_Appendix_C5.doc
46.5 KB
QW2_Appendix_C6.doc
45.0 KB
QW2_Appendix_H.doc
33.5 KB
QW2_Appendix_I.doc
32.0 KB
QW2_Suitability_Assessment_Open_Form.doc
446.0 KB
QW2_Supplement_3.4.1.doc
82.5 KB
QW2_Supplement_3.4.2.doc
96.0 KB
QW2_Supplement_3.4.3.doc
100.5 KB
QW2_Supplement_3.4.4.doc
100.0 KB
Volume A - Works Requirements Book 1 26032024.pdf
2.8 MB
WCMDN-001.pdf
318.8 KB
WCMDN-002.pdf
395.3 KB
WCMDN-003.pdf
220.8 KB
WCMDN-004.pdf
344.2 KB
WCMDN-005.pdf
285.5 KB
Original notice text
This tender involves the implementation of the Regional and Local Road Pavement Overlay Scheme 2024, focusing on road maintenance and improvement across Ireland, with a contract duration of 3 months.
AI analysis updated 4 months ago
Value
€2.0m
Deadline
25 Apr
Buyer
Clare County CouncilLocation
The works will be conducted across various locations in Ireland as part of the pavement overlay scheme.
Procedure
Open
Clarification
10 Apr 2024
eTenders ID
3313968
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender