240322 Works Contractor for Estate Support Services at University College Cork
Value
€2.0m
Deadline
29 Apr
29 Apr 2024
Value
€2.0m
Deadline
29 Apr
Contract for estate support services at University College Cork over 2 months
Contract for estate support services at University College Cork over 2 months
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in estate services.
Risks & flags
- Qualification gate turnover threshold
- Two-step process complexity
- Ambiguity for non-incumbents
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | University College Cork |
| Title | 240322 Works Contractor for Estate Support Services at University College Cork |
| CPV / category | works |
| Estimated value | 2000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 2 months |
| Submission deadline | 2024-04-29T18:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
University College Cork ran this procurement for “240322 Works Contractor for Estate Support Services at University College Cork” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: 240322 Works Contractor for Estate Support Services at University College Cork
- with a construction contract value greater than €5,000 and less than €100,000 ex VAT, for Estate Services
- carrying out these services are €6.5m & €13m
- dy (INAB) or United Kingdom Accreditation Service (UKAS) to ISO 17025 (EN
- [240322 ITTW-7 UCC Estate Services rev 1.docx] Instruction to Tenderers
- Works Contractor for Estate Support Services at University College Cork
- TERM MAINTENANCE AND REFURBISHMENT WORKS CONTRACT
- using the Term Maintenance and Refurbishment Works Contract
- [240322 ITTW-7 UCC Estate Services rev 1.docx] the procurement process or any part of it and may terminate the process or any part of it at any time, with or without procuring the subject works in another way. If this happens, neither the Employer nor its officers, employees, or advisers will be liable to any Tenderer or other person. The Employer also reserves the right to change any part of these documents, including the procedures and time limits described in them. The Employer does not bind itself to accept any outcome of the process described in these documents and is not obliged to enter into a contract with anyone.
- [240322 ITTW-7 UCC Estate Services rev 1.docx] Continued on next page
- [240322 ITTW-7 UCC Estate Services rev 1.docx] the National Employment Rights Authority (www.employmentrights.ie)
- 1.2 These documents The documents being made available to those expressing interest are: * These Instructions * Suitability Questionnaire(s) * Volume A: Works Requirements * Volume B: Form of Tender and Schedule * Volume C: Pricing Document * Volume D: Framework or Standard Agreement depending on which option is stated in the Particulars; Term Maintenance and Refurbishment Works Contract; model form Project Supervisor Appointment; Task Order and Rates of Pay and Conditions of Employment Certificate Any post tender clarifications that are to be part of the contract will be attached to the Tender Acceptance. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The extract showed a structured PQQ-to-ITT sequence intended to shortlist capable bidders before full award-stage submission. Programme and policy framing was only partially visible, but continuity and modernisation drivers were evident in the procurement design.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 2 Maximum levels of excess for * public liability (property damage) €50,000[16] * public liability (death, illness or injury) €6,500[17] * employer’s liability €6,500[18]
- Certifications — not specified for this tender
- Past experience — Candidates must have a minimum annual average turnover of €350,000 per annum for the last three years 2021,
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Candidates must have a minimum annual average turnover of €350,000 per annum for the last three years 2021,
- 2 Maximum levels of excess for * public liability (property damage) €50,000[16] * public liability (death, illness or injury) €6,500[17] * employer’s liability €6,500[18]
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| 1. If the award criteria below indicate that the Notional Tender Total will rece | 100% | not stated | not stated |
| Criterion % Weighing not stated not stated not stated | |||
| Quality - Quality Control & Communications 5% 5% not stated not stated | |||
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Number and type of Electronic Copies of Tender: PDF uploaded on e-tenders portal
- kly site visit to inspect/adjust the marquee – minimum hire 1 week
- 1.1 This procedure The Employer has sent a contract notice for the Works to etenders. These documents set out the suitability assessment criteria,
- 1.1 This procedure The Employer has sent a contract notice for the Works to etenders. These documents set out the suitability assessment criteria, the award criteria and the evaluation and award process to be followed by the Employer in making the assessment of which tender is the most economically advantageous. These documents also set out the information to be supplied by Tenderers. Tenders must be submitted in compliance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Employer. These documents set out the suitability assessment criteria, the award criteria and the evaluation and award process which will be followed by the Employer in making the assessment of which tender is either (i) the most economically advantageous or (ii) lowest price only depending on the award criterion stated in Appendix 3 to these Instructions. The documents also set out the information which must be supplied by Tenderers. Tenders must be submitted in compliance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Employer.
- 1.2 These documents The documents being made available to those expressing interest are: * These Instructions * Suitability Questionnaire(s) * Volume A: Works Requirements * Volume B: Form of Tender and Schedule * Volume C: Pricing Document * Volume D: Framework or Standard Agreement depending on which option is stated in the Particulars; Term Maintenance and Refurbishment Works Contract; model form Project Supervisor Appointment; Task Order and Rates of Pay and Conditions of Employment Certificate Any post tender clarifications that are to be part of the contract will be attached to the Tender Acceptance.
- 1.3 Documents outside the Contract These Instructions; the Suitability Questionnaire(s); any other information issued
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-04-29T18:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-04-29T18:00:00+00:00 |
| Date surfaced in documents | 1 March 2014 |
| Date surfaced in documents | 1 April 2013 |
| Date surfaced in documents | 31 May 2016 |
8. Contract terms that matter
Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the construction stage for the Projects, unless the appointment is terminated earlier
- ensure that it is insured by insurances in the same terms as the insurances it is required to have under the Contract, and that those insurances comply with all the requirements of the Contract, and are kept in force for the same period as required by the Contract, and include cover for death or i
- All work at height equipment must be given a unique number and must be inspected formally on a monthly basis on the form GA3
- (b) expiry of at least 21 days written notice to terminate this Tender
- 6 Time for payment 15 days[15] after Employer rece
- TERM MAINTENANCE AND REFURBISHMENT WORKS CONTRACT
- using the Term Maintenance and Refurbishment Works Contract
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 240322 ITTW-7 UCC Estate Services rev 1.docx, ITTW-7 UCC Estate Services rev 1.docx] Instruction to Tenderers, ITT-W7 v 1.1.
- eTenders CFT / notice reference: contract notice for the Works to etenders. These documents set out the sui.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: ITTW-7 UCC Estate Services rev 1.docx] the procurement process or any part of it, ITTW-7 UCC Estate Services rev 1.docx] Continued on next page, ITTW-7 UCC Estate Services rev 1.docx] the National Employment Rights Authority (.
This tender has been awarded
- Michael Barrett Partnership · 16 May 2025
- Michael Barrett Partnership · 30 Jul 2024
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€350,000
Public liability insurance
€6,500
Professional indemnity insurance
€13,000,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Maintenance of external areas such as roadways, footpaths, and green spaces at UCC.
Documents (28)
240117 UCC B&E Guidance Document for Estate Support Works Rev 1.docx
12.9 MB · Specification
240307 TERM MAINTENANCE Estates Support Works - Works Requirements -Rev 1.docx
31.1 KB · Specification
SOP 08 Electrical Installations Rev B.pdf
349.8 KB · Specification
240320 FTS12-v1.4-30-06-2016.docx
42.8 KB · RFT / Invitation to Tender
240322 ITTW-7 UCC Estate Services rev 1.docx
65.8 KB · RFT / Invitation to Tender
240322 Estate Support Services TIM- Rev 2.pdf
530.5 KB · RFT / Invitation to Tender
CPO Guidance on Permit To Work for Contractors.pdf
316.2 KB · Contract / Agreement / Terms
PW-CF11 Contract-v1.6-29-07-2021.pdf
383.5 KB · Contract / Agreement / Terms
PW-CF11 MF-1.27 - PSDP-09-04-2020.docx
35.5 KB · Contract / Agreement / Terms
210927 Information-Note-GDPR-05-06-2019.pdf
265.7 KB · Form / Declaration / Certificate
240320 Applicants Personal Situation Declaration Appendix A.docx
17.7 KB · Form / Declaration / Certificate
PW-CF11 MF-Rates of Pay 1.28-09-04-2020.docx
49.3 KB · Form / Declaration / Certificate
UCC PTW Template.pdf
146.6 KB · Form / Declaration / Certificate
240116 UCC Campus Map_ V18.pdf
1.2 MB · Drawing / Plan / Layout
SOP 14 Mechanical Safe System of Work-Rev B.pdf
601.8 KB · Other
SOP 18 Movement of Vehicles - Rev 0 3 Aug 2013.pdf
4.2 MB · Other
SOP 20 Asbestos Rev A.pdf
549.7 KB · Other
235656-00_UCC Traffic Manage Plan_Issue2-Final.pdf
10.0 MB · Appendix / Annex
240313 De-icing Schedule.xlsx
13.9 KB
240322 Appendix 1_Suitability Questionnaire Rev1.docx
47.6 KB · Appendix / Annex
240322 Appendix 2_Aide Memoire.docx
16.6 KB · Appendix / Annex
240322 Pricing Document - Estate Services Rev 1.xlsx
25.9 KB
240326 TC 1 ESS.pdf
91.8 KB · Clarification / Addendum
240327 TC 2 ESS.pdf
92.2 KB · Clarification / Addendum
240425 TC 3 ESS.pdf
88.1 KB · Clarification / Addendum
PW-CF11_Agreement.doc
44.0 KB
PW-CF11_Task Order Model_Form.doc
40.0 KB
SOP 06 MV Safe System of Work Rev B.pdf
1.4 MB
Original notice text
University College Cork seeks a contractor for estate support services, requiring implementation and sustained service execution within a 2-month timeframe.
AI analysis updated 4 months ago
Value
€2.0m
Deadline
29 Apr
Buyer
University College CorkLocation
Services to be provided at University College Cork, located in Ireland.
Procedure
Open
Clarification
22 Apr 2024
eTenders ID
3298488
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender