Design, Supply, Build and Certification of Turnkey Prefabricated Modular Residential Units
Value
€5.5m
Deadline
23 Apr
23 Apr 2024
Value
€5.5m
Deadline
23 Apr
Turnkey modular residential units project for Limerick Twenty Thirty DAC
Turnkey modular residential units project for Limerick Twenty Thirty DAC
Bidder profile
Ideal for mid-sized to large firms with experience in public sector projects and modular construction.
Risks & flags
- Qualification gate
- Two-step process
- Compliance evidence requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Limerick Twenty Thirty DAC |
| Title | DESIGN, SUPPLY, BUILD AND CERTIFICATION OF TURNKEY PREFABRICATED MODULAR RESIDENTIAL UNITS |
| CPV / category | works |
| Estimated value | 5500000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 2 months |
| Submission deadline | 2024-04-23T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Limerick Twenty Thirty DAC ran this procurement for “DESIGN, SUPPLY, BUILD AND CERTIFICATION OF TURNKEY PREFABRICATED MODULAR RESIDENTIAL UNITS” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: DESIGN, SUPPLY, BUILD AND CERTIFICATION OF TURNKEY PREFABRICATED MODULAR RESIDENTIAL UNITS
- The Department of Children, Equality, Disability, Integration and Youth (the ‘Contracting Authority’)
- Open Procedure process to appoint an economic operator for design, supply, build and certification of
- of supplies or services from a particular economic operator.
- the design, supply, build and certification of prefabricated modular residential (and sanitary) units for
- equipment etc. along with getting an appreciation of the services currently being administered on the
- recognised as a registered contractor with the Modular System Manufacturer.
- information is being provided in a certified or audited supporting document such as a set
- on the measures in place to ensure the delivery of a quality service, for example by way of an
- accredited system, or an equivalent in-house quality control process or system.
- If you don’t have a 3rd party certified system but do have an in-house system, please provide details of the
- The Services Contract will be awarded on the basis of the most economically advantageous tender(s) Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- (b) The removal, on a phased basis, of the existing tented accommodation on site, subject to
- moving the existing International Protection guests into the new modular accommodation
- the residents in or about the existing buildings of the designated site.
- and coverage of existing local lighting circuit boards, power supplies, requirements for specialist
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Insurance Type Required Level Public Liability €6.5m Product Liability €6; 5m Employers Liability €13m Professional Indemnity €2.6m A5 SELF DECLARATION OF FINANCIAL
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — ds from the Revenue Commissioners of Ireland; Evidence showing it complies with the registered employment agreement (Rates of Pay and Conditions); Public Liability Insurance cover: €6.5 million each and every claim with an excess or; ds from the Revenue Commissioners of Ireland; Evidence showing it complies with the registered employment agreement (Rates of Pay and Conditions); Public Liability Insurance cover: €6.5 million each and every claim with an excess lim Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance Type Required Level Public Liability €6.5m Product Liability €6
- 5m Employers Liability €13m Professional Indemnity €2.6m A5 SELF DECLARATION OF FINANCIAL
- ds from the Revenue Commissioners of Ireland; Evidence showing it complies with the registered employment agreement (Rates of Pay and Conditions); Public Liability Insurance cover: €6.5 million each and every claim with an excess or
- ds from the Revenue Commissioners of Ireland; Evidence showing it complies with the registered employment agreement (Rates of Pay and Conditions); Public Liability Insurance cover: €6.5 million each and every claim with an excess lim
- it no greater than the amount specified in the Tender; Product liability cover: €6.5 million each and every claim with an excess lim
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- 5m Employers Liability €13m Professional Indemnity €2.6m A5 SELF DECLARATION OF FINANCIAL
- der will be submitted on or before 12 Noon 23rd April 2024 (the “Tender Return Date”)
- Page 20 Providers must submit a Part L report using the D
- [ITT Columb Barrack IP Tender 19.03.2024.pdf] – COLUMB BARRACKS ......................................... 1
- APPENDIX B PROPOSED FORM OF CONTRACT .................................................................................. 1
- [ITT Columb Barrack IP Tender 19.03.2024.pdf] tenderer emerging
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-04-23T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-04-23T11:00:00+00:00 |
| Date surfaced in documents | April 2024 |
| Date surfaced in documents | Act 1991 |
| Date surfaced in documents | Year 2023 |
8. Contract terms that matter
Contract duration in the extract: 2 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 0.00 [14]
- payment stated in the Schedule, part 1L, if the amount payable is more than the minimum amount stated in the Schedule and
- Minimum amount for interim payments, except release of retention, € 0
- 2 Within 3 months after receipt of the Contractor’s final statement, the Employer’s Representative shall issue t
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as soon as p
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: not later than 5 days after the date agreed between the Parti
- 4 Within 14 days of receipt of the payment claim notice
- The Employer shall pay the amount due on the invoice within 21 days after receiving the invoice
- 3 If, within 14 days of the issue of the certificate of Subs
- 3 within 21 days after receiving the invoice [less any a
- 1 Within 2 months after Substantial Completion of the Wor
- 2 Within 3 months after receipt of the Contractor’s final
- 3 As soon as practicable, no more than 3 months, after the Defects Certificate is issue
TENDER DOCUMENTS [ITT Columb Barrack IP Tender 19.03.2024.pdf, ITT Columb Barrack IP Tender 19.03.2024.pdf, FTS-2-v2.5-17-07-2023-1.docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule, part 1L, if the amount payable is more than the minimum amount stated in the S, Schedule Part 3A , at all Project Board meetings; 2, Schedule and.
This tender has been awarded
- MF Modular Engineering Limited · 05 Sep 2024
- MF Modular Engineering Limited · 17 Jul 2024
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€5,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,600,000
Scoring
Most Economically Advantageous Tender
Technical Merit
Price
Lots (1)
Design, supply, build, and certification of modular residential units and associated works.
Documents (8)
FTS-2-v2.5-17-07-2023-1.docx
107.9 KB · RFT / Invitation to Tender
ITT Columb Barrack IP Tender 19.03.2024.pdf
417.1 KB · RFT / Invitation to Tender
PW-CF2-v2.6-17-07-2023-3.docx
284.1 KB · Contract / Agreement / Terms
PW-CF2-v2.6-17-07-2023-3.pdf
1.1 MB · Contract / Agreement / Terms
D2_TentsTobeDecanted.pdf
235.8 KB · Drawing / Plan / Layout
DOBA2417-DOB-XX-SI-DR-C-0010 Site Boundary Drawing-C-0010.pdf
357.6 KB · Drawing / Plan / Layout
DOBA2417-DOB-XX-SI-DR-C-0020 Existing Services Layout-C-0020.pdf
2.0 MB · Drawing / Plan / Layout
Pricing Schedule .xlsx
25.1 KB
Original notice text
This tender involves the design, supply, build, and certification of prefabricated modular residential units for Limerick Twenty Thirty DAC, focusing on operational contract execution and quality service delivery.
AI analysis updated 4 months, 1 week ago
Value
€5.5m
Deadline
23 Apr
Location
Ireland
Procedure
Open
Clarification
12 Apr 2024
eTenders ID
3270447
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender