Design Team Procurement - Ballycarnane, Tramore for Oaklee Housing Association
Deadline
17 Apr
17 Apr 2024
Deadline
17 Apr
Procurement for design team services for Ballycarnane project in Tramore.
Procurement for design team services for Ballycarnane project in Tramore.
Bidder profile
Ideal for firms experienced in public procurement and capable of meeting specified insurance levels.
Risks & flags
- Information asymmetry
- Compliance risks
- Tight timelines
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Oaklee Housing |
| Title | Design Team Procurement - Ballycarnane, Tramore for Oaklee Housing Association |
| CPV / category | services / Professional Consultancy |
| Estimated value | €not disclosed (eTenders placeholder) |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2024-04-17T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Design Team Procurement - Ballycarnane, Tramore for Oaklee Housing Association. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Professional Consultancy under buyer workflows in Oaklee Housing.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o; Minimum level of Professional Indemnity Insurance complying with the conditions below: Specialist Skill Provider Cover on Each And Every claim basis Cover on an Annual Aggregate basis Architect € 1,250,000 € 1,500,000 Civil & Structural Engineer € 1,25; Minimum level of Public Liability Insurance required in respect of any one accident: € 2600000[14] Tenderer has c
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — not specified for this tender
- Insurance
- Public Liability — €2600000
- Employer's Liability — €13,
- Professional Indemnity — €1,250,000
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,000[12] € 1,500,000[13] Maximum level o; Minimum level of Professional Indemnity Insurance complying with the conditions below: Specialist Skill Provider Cover on Each And Every claim basis Cover on an Annual Aggregate basis Architect € 1,250,000 € 1,500,000 Civil & Structural Engineer € 1,25; Minimum level of Public Liability Insurance required in respect of any one accident: € 2600000[14] Tenderer has c
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | * The invitation letter * Suitability Assessment Questionnaire(s) * These Instructions * Any information submitted with tenders and not called for in these Instructions or in post-tender clarifications. |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2024-04-17T11:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): Instructions to Tenderers.docx, Tender and Schedule.docx
- eTenders CFT ID: not stated
- Clarification contact / portal: eTenders clarification portal
- Priority attachments: Instructions to Tenderers.docx, Tender and Schedule.docx
This tender has been awarded
- Brian Dunlop Architects · 19 Jun 2024
- Brian Dunlop Architects · 17 May 2024
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€2,600,000
Professional indemnity insurance
€1,250,000
Scoring
Most Economically Advantageous Tender
Quality of Team and Experience
Price
Lots (1)
Provision of consultancy services including architectural, engineering, quantity surveying, and project management for a social residential scheme.
Documents (31)
Description of Services.docx
3.9 MB · Specification
Instructions to Tenderers.docx
131.1 KB · RFT / Invitation to Tender
Invitation to Tender.pdf
131.4 KB · RFT / Invitation to Tender
Tender and Schedule.docx
204.8 KB · RFT / Invitation to Tender
Tender and Pricing Document.docx
469.6 KB · Pricing / BOQ / Schedule of Rates
COE1-v.2i-31-03-2023-1 (1).docx
86.0 KB · Contract / Agreement / Terms
MF-2.3-09-02-2022.docx
49.3 KB · Contract / Agreement / Terms
MF-2.4 H&S Compliance Declaration by all General service providers.docx
32.5 KB · Form / Declaration / Certificate
QC2-Part-1-v3.0-09-02-2022-rev-03-03-22.docx
135.6 KB · Form / Declaration / Certificate
QC2-Part-2-v1.0-09-02-2022.docx
70.9 KB · Form / Declaration / Certificate
01 Ex Asset Info and O.S map-1.0.pdf
171.3 KB · Drawing / Plan / Layout
02 Existing Layout-1.0.pdf
172.6 KB · Drawing / Plan / Layout
03 Proposed Layout and Sections-1.0.pdf
287.5 KB · Drawing / Plan / Layout
Ballycarane Tramore Existing Watermain.pdf
1.3 MB · Drawing / Plan / Layout
Tender_House Type No.1.pdf
4.2 MB · Drawing / Plan / Layout
Tender_House Type No.2.pdf
4.1 MB · Drawing / Plan / Layout
Tender_House Type No.3.pdf
3.7 MB · Drawing / Plan / Layout
Accessibility Report - Tramore Housing Scheme.pdf
903.2 KB · Other
Revised CAS Stage 1 Approval Letter.pdf
342.9 KB · Other
SI Report - Tramore Voluntary Housing-1.0.pdf
5.5 MB · Other
Waterford council notification to grant extension.pdf
2.4 MB · Other
Appendix-A-QC1-and-QC2-09-02-2022.docx
44.0 KB · Appendix / Annex
Appendix-B1-QC1-and-QC2-09-02-2022.docx
26.7 KB · Appendix / Annex
Appendix-B3-QC1-and-QC2-09-02-2022.docx
25.4 KB · Appendix / Annex
Appendix-C-QC1-and-QC2-09-02-2022.docx
35.0 KB · Appendix / Annex
Appendix-D-QC1-and-QC2-09-02-2022.docx
33.5 KB · Appendix / Annex
Clarification Log - Ballycarnane, Tramore.pdf
433.2 KB · Clarification / Addendum
Clarification Log 2 - Ballycarnane, Tramore.pdf
444.8 KB · Clarification / Addendum
MF-2.1-09-02-2022.docx
50.1 KB · Insurance / Indemnity
OS Maps.pdf
2.3 MB
Tramore VHA orignal planning approval.pdf
141.9 KB
Original notice text
This tender seeks a design team for the Ballycarnane project, ensuring compliance with public procurement standards and quality specifications.
AI analysis updated 4 months ago
Deadline
17 Apr
Buyer
Oaklee HousingLocation
Ballycarnane, Tramore, Co. Waterford
Procedure
Open
Clarification
10 Apr 2024
eTenders ID
3185893
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender