West Quad Grangegorman Property Exchange Project
Value
€120.0m
Deadline
24 Apr
24 Apr 2024
Value
€120.0m
Deadline
24 Apr
Grangegorman Development Agency seeks contractors for property exchange project.
Grangegorman Development Agency seeks contractors for property exchange project.
Bidder profile
Mid-sized to large firms with public sector tender experience and operational capability in construction.
Risks & flags
- Qualification gate
- Two-step process
- Technical ambiguity
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Grangegorman Development Agency_564 |
| Title | West Quad Grangegorman Property Exchange Project |
| CPV / category | works |
| Estimated value | 120000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12month |
| Submission deadline | 2024-04-24T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Grangegorman Development Agency_564 ran this procurement for “West Quad Grangegorman Property Exchange Project” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- indicated on the Design Drawings; Softwood timber batten support framing as required to suit the service
- Provide softwood timber batten support framing as
- Softwood timber batten support framing as required to suit the service conditions
- 7.3 Contractor Responsible for All Site Operations
- 7.4 Services for Employer’s Facilities
- [08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf] 13.6 Agent for Service
- supports and sudden and accidental pollution.
- 25 Persons under a Contract of service or
- 36 Persons under a Contract of service or
- 38 Effecting or maintenance of insured of or in
- 104 Proprietary masonry support angles and
- 110 PV panel support system and related weathering Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- is an objective that there shall be a minimum of 50%
- Programmes of Works by the GDA, on behalf of
- 3.8 Existing Facilities and Use or Occupation by
- Programme Contingency, Delay Costs,
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 5'% of the Contract Sum item Minimum indemnity for Public Liability and Employer's Liability insurance: 3 Public Liability Insurance: '€6,500,000.00' for any one event, but this limit may; 2020 Project : Cost Plan : CONDITIONS OF CONTRACT 4 Employer's Liability Insurance: '€13,000,000.00' for any one event
- Certifications — not specified for this tender
- Past experience — 2020 Project : Cost Plan : CONDITIONS OF CONTRACT 4 Employer's Liability Insurance: '€13,000,000.00' for any one event
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 5'% of the Contract Sum item Minimum indemnity for Public Liability and Employer's Liability insurance: 3 Public Liability Insurance: '€6,500,000.00' for any one event, but this limit may
- 2020 Project : Cost Plan : CONDITIONS OF CONTRACT 4 Employer's Liability Insurance: '€13,000,000.00' for any one event
- item 5 Professional Indemnity Insurance: €6,500,000.00' for each and every claim or series of
- item Motor Insurance €6,500,000 limit Maximum excess for insurance: 6 Insurance of the works and other Risk Items €10,000 item 7 Public liability and Employers Liability €10,000.00 in respect of property damage only
- item 8 Employers liability: There is no excess permitted for Employers' liability insurance item 9 Professional Indemnity: The maximum excess shall be €50,000.00 item Permitted exclusions from all insur
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- [08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf] Natural convecting trench heaters - uplift means tested on two different suppliers, using average uplift from both
- Appendix.........................................................................................................................
- [08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf] 's University exam and
- [08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf] addresses of the Employer
- [08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf] end Rd
- 6 Drawings used for the preparation of this Pricing
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-04-24T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-04-24T11:00:00+00:00 |
| Date surfaced in documents | 05 June 2019 |
| Date surfaced in documents | 1 June 2002 |
| Date surfaced in documents | June 2019 |
8. Contract terms that matter
Contract duration in the extract: 12month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- 215 Minimum amount for interim payments, except
- exposed ribbed slab formation between floor
- The term 'Employer's Representative shall
- 8.1 Standards of Workmanship and Works Items
- 10.5 Employer’s Representative’s Determination
- 12.1 Termination on Contractor Default
- 12.2 Consequences of Default Termination
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf, Appendix................................................................................, Schedule of Contract Clauses.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule Part 1 as to which applies, SCHEDULE, scheduled and identified in section titled.
Can you bid?
Required certifications
- BS 7974
- BS 8000
- BS 9997
- BS 9999
- EN 13187
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Technical Merit
Price
Lots (1)
Design, supply, and installation of VRF systems, air handling units, and associated infrastructure.
Documents (109)
08WQ-ACM-ZZ-ZZ-SP-M-Fl_40_80-0001-SOWVRFEXT.pdf
14.0 KB · Specification
08WQ-ACM-ZZ-ZZ-SP-M-Fl_40_80-0002-EquipSchedVRFEXT.pdf
57.0 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06F10EXT.pdf
42.3 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06G15EXT.pdf
40.8 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06J31EXT.pdf
54.9 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06K10EXT.pdf
55.1 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06K13EXT.pdf
39.8 KB · Specification
08WQ-HPA-ZZ-ZZ-SP-A-En_25_10_60-9001-SpecP06TSEXT.pdf
294.7 KB · Specification
08WQ-MFS-ZZ-ZZ-SP-YFD-Ss_25_60_35-9001-SpecEWS101EXT.pdf
196.2 KB · Specification
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01AcousticEXT.pdf
23.4 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01COLC3EXT.pdf
14.7 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01COOLEXT.pdf
21.9 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01EWS101EXT.pdf
21.4 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01EXT127EXT.pdf
15.2 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01ExtBrickEXT.pdf
53.6 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01HEATEXT.pdf
40.8 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-CP-Q-En_25_10_60-0011-PriceP01RFSEXT.pdf
23.5 KB · Pricing / BOQ / Schedule of Rates
08WQ-ACM-ZZ-ZZ-SP-M-Fl_40_80-0002-EquipSchedRADSEXT.pdf
267.2 KB · Pricing / BOQ / Schedule of Rates
00PROC-GDA-1034-0001-PQQ_Form_CD.docx
111.4 KB · Form / Declaration / Certificate
00PROC-GDA-1034-0002-PQQ_Form_ER.pdf
245.9 KB · Form / Declaration / Certificate
00PROC-GDA-1034-0004-PQQ_Forms_EF_Developer.docx
113.0 KB · Form / Declaration / Certificate
00PROC-GDA-1034-0005-PQQ_Forms_EF_DeveloperWC.docx
112.8 KB · Form / Declaration / Certificate
00PROC-GDA-1034-0006-PQQ_Forms_ET_Developer.docx
122.7 KB · Form / Declaration / Certificate
00PROC-GDA-1034-0008-PQQ_Forms_ET_DeveloperDT.docx
118.3 KB · Form / Declaration / Certificate
08WQ-DCC-ZZ-ZZ-CE-LA-XX-0001-FSC-2952-20.pdf
88.3 KB · Form / Declaration / Certificate
08WQ-ACM-2C-02-DR-S-En_25_10_60-1122-FloorPlan.pdf
806.4 KB · Drawing / Plan / Layout
08WQ-ACM-3N-02-DR-M-Ss_60_40-1115-HeatCoolLayout.pdf
1.5 MB · Drawing / Plan / Layout
08WQ-ACM-ZZ-02-DR-M-Ss_60_40-1112-HeatCoolLayout.pdf
1.2 MB · Drawing / Plan / Layout
08WQ-ACM-ZZ-02-DR-S-En_25_10_60-1002-FloorPlan.pdf
321.0 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-02-DR-S-En_25_10_60-1202-FloorPlan.pdf
150.4 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-02-DR-S-En_25_10_60-2302-Sections.pdf
187.5 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-B1-DR-M-SL_90_90-7100-MPlantLayout.pdf
1.8 MB · Drawing / Plan / Layout
08WQ-ACM-ZZ-B1-DR-M-SL_90_90-7200-PWHPlantLayout.pdf
654.2 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-DR-S-En_25_10_60-2001-SectionWX.pdf
149.3 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-DR-S-En_25_10_60-2002-SectionYZ.pdf
165.8 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-DR-S-Ss_20-0001-GNotes.pdf
520.0 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-DR-S-Ss_20-0002-GNotes.pdf
379.3 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-DR-S-Ss_20-0003-GNotes.pdf
153.8 KB · Drawing / Plan / Layout
08WQ-ACM-ZZ-ZZ-SH-S-EN_25_10_60-9406.pdf
200.1 KB · Drawing / Plan / Layout
08WQ-HPA-1S-02-DR-A-EN_25_10_60-1112-FloorPlanP08.pdf
1.9 MB · Drawing / Plan / Layout
08WQ-HPA-1S-03-DR-A-EN_25_10_60-1513-RCPP07.pdf
1.8 MB · Drawing / Plan / Layout
08WQ-HPA-2C-03-DR-A-EN_25_10_60-1523-RCPP07.pdf
2.7 MB · Drawing / Plan / Layout
08WQ-HPA-3N-03-DR-A-EN_25_10_60-1533-RCPP08.pdf
2.6 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-00-DR-A-EN_25_10_60-1000-FloorPlanP13.pdf
5.6 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-00-DR-A-EN_25_10_60-1500-RCP_P09.pdf
1.7 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-00-DR-A-SL_20_95_30-1400-CompPlanP08.pdf
2.0 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-01-DR-A-EN_25_10_60-1001-FloorPlanP13.pdf
1.4 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-01-DR-A-EN_25_10_60-1501-RCP_P09.pdf
1.9 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-01-DR-A-SL_20_95_30-1401-CompPlanP08.pdf
1.3 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-02-DR-A-EN_25_10_60-1002-FloorPlanP13.pdf
1.3 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-02-DR-A-EN_25_10_60-1502-RCPP09.pdf
1.4 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-02-DR-A-SL_20_95_30-1402-CompPlanP08.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-03-DR-A-EF_30_20-1303-FloorFinishesPlanP06.pdf
1.2 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-03-DR-A-EN_25_10_60-1003-FloorPlanP13.pdf
1.4 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-03-DR-A-EN_25_10_60-1503-RCPP09.pdf
1.5 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-03-DR-A-SL_20_95_30-1403-CompPlanP08.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-04-DR-A-EN_25_10_60-1004-FloorPlanP13.pdf
1.4 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-04-DR-A-EN_25_10_60-1504-RCPP09.pdf
1.5 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-04-DR-A-SL_20_95_30-1404-CompPlanP08.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-05-DR-A-EN_25_10_60-1005-FloorPlanP13.pdf
1.3 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-05-DR-A-EN_25_10_60-1505-RCPP09.pdf
1.6 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-05-DR-A-SL_20_95_30-1405-CompPlanP08.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-06-DR-A-EN_25_10_60-1006-RoofPlanP13.pdf
554.6 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-06-DR-A-SL_20_95_30-1406-CompPlanP08.pdf
594.8 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-B1-DR-A-EN_25_10_60-1009-FloorPlanP14.pdf
816.1 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-B1-DR-A-EN_25_10_60-1509-RCPP09.pdf
2.3 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5001-FacadeSectionP05.pdf
445.9 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5001-FacadeSectionP06.pdf
449.2 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5002-FacadeSectionP06.pdf
456.4 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5020-Glazing ModulesP04.pdf
202.5 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5101-FacadeDetailsP06.pdf
730.1 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5102-FacadeDetailsP04.pdf
724.8 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5102-FacadeDetailsP05.pdf
725.3 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5121-FacadeDetailsP02.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_25_10-5601-RoofDetailsP04.pdf
442.5 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4140-StairCore4P05.pdf
806.6 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4141-StairCore4P05.pdf
649.6 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4143-StairCore4P05.pdf
367.3 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4201-MainStairP05.pdf
366.4 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4301-StairDetailsP04.pdf
253.9 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4302-StairDetailsP05.pdf
387.5 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4303-StairDetailsP05.pdf
201.2 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EF_35_10-4311-StairDetailsP05.pdf
172.1 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-0120-SitePlanP13.pdf
2.6 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-0150-SitePlanP07.pdf
931.3 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-2001-Sec.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-2002-Sec.pdf
785.6 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-3011-EWEle.pdf
2.0 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-3012-NSEle.pdf
1.6 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-3013-EWEle.pdf
1.3 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-3014-NSEle.pdf
1.1 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-EN_25_10_60-3100-ElevationsP06.pdf
1.8 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-SL_25_10_05-6031-RoomLayoutP04.pdf
1.2 MB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-SL_25_10_05-6032-RoomLayoutP04.pdf
779.5 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-SL_25_10_05-6035-RoomLayoutP04.pdf
939.5 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-Ss_25_10-6404-WallDetailsP04.pdf
508.8 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-Ss_25_10-6405-WallDetailsP04.pdf
397.8 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-Ss_30_25-6411-CeilingDetailsP04.pdf
423.4 KB · Drawing / Plan / Layout
08WQ-HPA-ZZ-ZZ-DR-A-Ss_40_15_35-6610-FixedFurnitureP05.pdf
616.1 KB · Drawing / Plan / Layout
08WQ-TTT-ZZ-02-DR-L-EN_32_35_36-1003-LandscapePlan.pdf
755.7 KB · Drawing / Plan / Layout
08WQ-TTT-ZZ-02-DR-L-EN_32_35_36-2003-LandscapeSections.pdf
1.3 MB · Drawing / Plan / Layout
08WQ-TTT-ZZ-02-DR-L-EN_32_35_36-3003-LandscapeDetails.pdf
678.0 KB · Drawing / Plan / Layout
08WQ-TTT-ZZ-02-DR-L-EN_32_35_80-4003-PlantingPlan.pdf
586.7 KB · Drawing / Plan / Layout
00PROC-GDA-1034-0006-PIM_BackGrndInfo_AungierSt.pdf
6.3 MB · Other
08WQ-DCC-ZZ-ZZ-CE-LA-XX-0001-PP-GSDZ2088-20.pdf
100.1 KB · Other
08WQ-DCC-ZZ-ZZ-CE-LA-XX-0001-PP-GSDZ3536-19.pdf
107.1 KB · Other
00PROC-GDA-1034-0003-PIM_BackGrndInfo_Slides.pdf
9.9 MB · Appendix / Annex
08WQ-ACM-XX-XX-SP-Q-En_25_10_60-0001-ProjectPartVolA.pdf
472.8 KB · Appendix / Annex
08WQ-HPA-XX-XX-PP-LD-XX-0009-PropexDocPresentation.pdf
25.2 MB · Appendix / Annex
Original notice text
The West Quad Grangegorman Property Exchange Project involves building, integrating, and operating specified service stacks with compliance reporting and handover obligations over a 12-month contract period.
AI analysis updated 4 months, 1 week ago
Value
€120.0m
Deadline
24 Apr
Location
Grangegorman West Quad
Procedure
Open
Clarification
22 Mar 2024
eTenders ID
3036187
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender