23-018 Invitation to Tender for Contractor for Dundalk Youthreach Dust Extract System Upgrade
Value
€35k
Deadline
04 Mar
04 Mar 2024
Value
€35k
Deadline
04 Mar
Tender for upgrading the dust extract system at Dundalk Youthreach over 10 years
Tender for upgrading the dust extract system at Dundalk Youthreach over 10 years
Bidder profile
Mid-sized to large specialists with public-sector tender experience and compliance processes.
Risks & flags
- Qualification gate
- Two-step process
- Technical ambiguity
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Louth and Meath Education and Training Board 1384 |
| Title | 23-018 Invitation to Tender for Contractor for Dundalk Youthreach Dust Extract System Upgrade (Open Procedure) |
| CPV / category | works |
| Estimated value | 35000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 years |
| Submission deadline | 2024-03-04T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Louth and Meath Education and Training Board 1384 ran this procurement for “23-018 Invitation to Tender for Contractor for Dundalk Youthreach Dust Extract System Upgrade (Open Procedure)” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Title: 23-018 Invitation to Tender for Contractor for Dundalk Youthreach Dust Extract System Upgrade (Open Procedure)
- Dundalk Youthreach Dust Extract System Upgrade
- Competition the successful Tenderer shall be required to supply its Tax
- verification of their tax status by the Contracting Authority. By supplying
- has prior knowledge of their organisation or service provision. Tenderers will
- information on the site location, any constraints such as existing services or working hours, statutory consents and
- [Instruction to Tenderers 3051 (2).pdf] , any constraints such as existing services or working hours, statutory consents and
- the Contracting Authority’s third party service providers, such as
- electronic submission to the eTenders platform, Tenderers are advised to
- system has sufficient capacity to execute the upload of all the documents
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
- electronic submission (including to the eTenders platform), Candidates must Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- information on the site location, any constraints such as existing services or working hours, statutory consents and
- [Instruction to Tenderers 3051 (2).pdf] , any constraints such as existing services or working hours, statutory consents and
- and retention policy, a copy of which can be obtained from the Contracting
- drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10; 4 Maximum levels of excess for insurance of the Works and goods and materials for the Works € public liability €6,5009 employer’s liability €6,50010 7 If no percentage specified, 10% applie
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10
- 4 Maximum levels of excess for insurance of the Works and goods and materials for the Works € public liability €6,5009 employer’s liability €6,50010 7 If no percentage specified, 10% applie
- 3g Public Liability Insurance and Employer’s Liability Insurance I declare that the above named Contractor has, or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (w
- ith a minimum level of cover of €13,000,000) in accordance , or (if successful in this tender competition) will take out (prior to appointment), Public Liability Insurance (with a minimum level of cover of €6,500,000) and Employer’s Liability Insurance (with a minimum level of cover of €13,000,000) in accordance with the conditions stat
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| the amount inserted must not exceed ______ % of the tendered Price. | not stated | not stated | not stated |
| method-related charges must not exceed ____% of the tendered Price. | not stated | not stated | not stated |
| the amount inserted must not exceed ______ % of the tendered Price. | not stated | not stated | not stated |
| method-related charges must not exceed ____% of the tendered Price. | not stated | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- of less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
- [Invitation to Tender Letter eTenders.pdf] [Date as per eTender Notice]
- The address for submission of Tender is: eTenders
- Tender submissions must be sent through eTenders not later than the latest time and date stated above.
- Queries must be submitted through the eTenders query facility.
- All queries must be submitted as soon as possible and, in any event, not later than 7 working days
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-03-04T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-03-04T12:00:00+00:00 |
| Date surfaced in documents | 01 August 2023 |
| Date surfaced in documents | 25 May 2018 |
| Date surfaced in documents | Board 1384 |
8. Contract terms that matter
Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
- e Schedule says that a performance bond is required, within 7 days after the Employer sends
- When a payment is to be made, not later than 5 days after the date agreed between the
- Within 14 days of receiving the payment claim notice,
- n to put in place arrangements to complete the Works within 6 months after the termination, the Employer’s R
- the Works within 12 months after the termination, the Contractor’s
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Invitation to Tender Letter eTenders.pdf, Instruction to Tenderers 3051 (2).pdf, C2-PW-~1.PDF.
- eTenders CFT / notice reference: contract notice for the Works to.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule 2 of S.I. No. 138/1995 together with the opinion of the Project Supervisor for, SCHEDULE 2, S.I. NO. 138/1995 – ITEM 1), SCHEDULE 2, S.I. NO. 138/1995 – ITEM 2).
This tender has been awarded
- Neacy Mechanical and Electrical Ltd · 07 Nov 2025
- Neacy Mechanical and Electrical Ltd · 21 Jun 2024
- Sem construction · 04 May 2021
Can you bid?
Required certifications
- BS 8214
Public liability insurance
€6,500,000
Scoring
Lowest Price
Documents (12)
2024-01-17 Vol A Mech Spec Part 1 - Project Particulars & Schedule 3051.pdf
372.5 KB · Specification
2024-01-17 Vol A Mech Spec Part 2 - Standard Clauses 3051.pdf
666.4 KB · Specification
Volume A Works Requirements-3051.pdf
394.2 KB · Specification
Instruction to Tenderers 3051 (2).pdf
366.9 KB · RFT / Invitation to Tender
Invitation to Tender Letter eTenders.pdf
165.6 KB · RFT / Invitation to Tender
2024-01-17 Vol C Pricing Document 3051.pdf
227.2 KB · Pricing / BOQ / Schedule of Rates
C2-PW-~1.PDF
771.0 KB · Contract / Agreement / Terms
PW-CF6-v1.14-19-07-2023.pdf
612.0 KB · Contract / Agreement / Terms
C1-PW-~1.PDF
630.0 KB · Form / Declaration / Certificate
Declaration of suitability_small_works-3051.pdf
227.7 KB · Form / Declaration / Certificate
Volume B Form of Tender - 3051 (1).pdf
160.9 KB · Form / Declaration / Certificate
2024-01-17 Preliminary Safety & Health Plan 3051.pdf
599.2 KB · Other
Original notice text
This tender invites contractors to upgrade the dust extract system at Dundalk Youthreach, ensuring compliance with operational standards and effective service execution over a 10-year contract.
AI analysis updated 4 months ago
Value
€35k
Deadline
04 Mar
Location
Ireland
Procedure
Open
Clarification
26 Feb 2024
eTenders ID
3075675
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender