Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Quantity Surveying Consultancy Services for Works at The Ballinrobe Community and Arts Centre, Ballinrobe, Co. Mayo
Closed Professional Consultancy Services Open

Quantity Surveying Consultancy Services for Works at The Ballinrobe Community and Arts Centre, Ballinrobe, Co. Mayo

Deadline

26 Feb

Consultancy services for quantity surveying at Ballinrobe Community and Arts Centre

SME fit: Medium Bid effort: Medium 📍 Mayo

Consultancy services for quantity surveying at Ballinrobe Community and Arts Centre

Bidder profile

Ideal for firms experienced in public procurement and quantity surveying, with strong compliance and documentation capabilities.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer South West Mayo Development Company Limited
Title Quantity Surveying Consultancy Services for Works at The Ballinrobe Community and Arts Centre, Ballinrobe, Co. Mayo
CPV / category services / Professional Consultancy
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2024-02-26T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Quantity Surveying Consultancy Services for Works at The Ballinrobe Community and Arts Centre, Ballinrobe, Co. Mayo. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Professional Consultancy under buyer workflows in South West Mayo Development Company Limited.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,00012 € 1,500,00013 Maximum level of excess in any one claim; Minimum level of Public Liability Insurance required in respect of any one accident: € 260000014 14 If no value is entered it shall read as €2,600,000 (Two million and six hundred thousand Eu; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,00015 Evidence of Public Liability Insurance m

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance
  • Public Liability — €260000014
  • Employer's Liability — €13,000,00015
  • Professional Indemnity — €1,250,00012
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each And Every claim basis Cover on an Annual Aggregate basis € 1,250,00012 € 1,500,00013 Maximum level of excess in any one claim; Minimum level of Public Liability Insurance required in respect of any one accident: € 260000014 14 If no value is entered it shall read as €2,600,000 (Two million and six hundred thousand Eu; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,00015 Evidence of Public Liability Insurance m

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Um Level Of Excess In Any One Claim Below 2 not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2024-02-26T12:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 02-SPDT_SWMD-ITTS2b_Instruction_Tendered_Hourly_Rates.QS.Rev.01.pdf, 01-ITTS2_Invitation_to_Tender-SPDT_SWMDC.QS.Rev.01.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: 02-SPDT_SWMD-ITTS2b_Instruction_Tendered_Hourly_Rates.QS.Rev.01.pdf, 01-ITTS2_Invitation_to_Tender-SPDT_SWMDC.QS.Rev.01.pdf

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€2,600,000

Professional indemnity insurance

€1,250,000

Scoring

Most Economically Advantageous Tender

Documents (20)

PDF

06.1-Project Brief_SWMDC.Rev.01.QS.pdf

378.6 KB · Specification

PDF

01-ITTS2_Invitation_to_Tender-SPDT_SWMDC.QS.Rev.01.pdf

132.4 KB · RFT / Invitation to Tender

PDF

02-SPDT_SWMD-ITTS2b_Instruction_Tendered_Hourly_Rates.QS.Rev.01.pdf

417.7 KB · RFT / Invitation to Tender

PDF

04-SPDT_SWMDC_FTS9-v1.9-31-03-2023-1.Rev.01.pdf

430.3 KB · RFT / Invitation to Tender

PDF

07-COE1-v.2h-05-06-2019-SPDT_SWMDC.QS.Rev.01.pdf

344.7 KB · Contract / Agreement / Terms

PDF

03a-QC2-Part-1-v3.0-09-02-2022-rev-03-03-22-QS.pdf

553.9 KB · Form / Declaration / Certificate

PDF

03b-QC2-Part-2-v1.0-09-02-2022-QS.pdf

324.6 KB · Form / Declaration / Certificate

DOCX

MF-2.7-09-02-2022.docx

28.6 KB · Form / Declaration / Certificate

DOCX

MF-2.8-09-02-2022.docx

22.3 KB · Form / Declaration / Certificate

PDF

The Valkenburg Building - Proposed Layouts - Accomodation.pdf

2.3 MB · Drawing / Plan / Layout

PDF

The Valkenburg Building - Proposed Layouts - Multi Purpose Space.pdf

3.8 MB · Drawing / Plan / Layout

XLSX

05-SPDT_SWMDC_Resourcing and Pricing Schedule_QS_Rev.01.xlsx

40.1 KB

PDF

06.2-Schedule of Services_SWMDC.QS.Rev.01.pdf

410.5 KB · Appendix / Annex

DOCX

Appendix-A-QC1-and-QC2-09-02-2022.docx

34.8 KB · Appendix / Annex

DOCX

Appendix-B1-QC1-and-QC2-09-02-2022.docx

16.6 KB · Appendix / Annex

DOCX

Appendix-B3-QC1-and-QC2-09-02-2022.docx

16.7 KB · Appendix / Annex

DOCX

Appendix-C-QC1-and-QC2-09-02-2022.docx

24.9 KB · Appendix / Annex

DOCX

Appendix-D-QC1-and-QC2-09-02-2022.docx

23.9 KB · Appendix / Annex

DOCX

MF-2.1-09-02-2022.docx

40.5 KB · Insurance / Indemnity

PDF

Note Re ESPD QS.pdf

141.2 KB · ESPD (European Single Procurement Document)

Original notice text

Provision of quantity surveying consultancy services for works at the Ballinrobe Community and Arts Centre, ensuring compliance with specifications and quality requirements.

AI analysis updated 4 months, 1 week ago

Bid ↗
Details

Deadline

26 Feb

View on eTenders ↗

Location

Ballinrobe Community and Arts Centre, Ballinrobe, Co. Mayo

Procedure

Open

Clarification

16 Feb 2024

eTenders ID

2997956

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender