FCC/446/23 - Kellystown Cemetery, Phase 1B, Burial Plots, Memorials, Staff Facilities and Parking
Deadline
29 Feb
29 Feb 2024
Deadline
29 Feb
Fingal County Council's operational contract for Kellystown Cemetery development
Fingal County Council's operational contract for Kellystown Cemetery development
Bidder profile
Mid-sized to large firms with public sector experience and operational capabilities in construction and facility management.
Risks & flags
- Undisclosed contract value
- Qualification gate risks
- Two-step tender process ambiguity
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Fingal County Council_371 |
| Title | FCC/446/23 - Kellystown Cemetery, Phase 1B, Burial Plots, Memorials, Staff Facilities and Parking |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 7 years |
| Submission deadline | 2024-02-29T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Fingal County Council_371 ran this procurement for “FCC/446/23 - Kellystown Cemetery, Phase 1B, Burial Plots, Memorials, Staff Facilities and Parking” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- operations in clauses 610 to 685 from completion of seeding 12 months following Practical Completion
- For the attention of Director of Services, Operations
- For the attention of: Senior Executive Officer Operations Department - Castleknock Mulhuddart Area
- Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
- [FTS-5-v2.3-06-06-2018.docx] vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
- Persons under a contract of service or apprenticeship with the insured
- Persons under a contract of service or apprenticeship with the insured.
- Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial matters
- Utilities means conducting media and apparatus for water, sewage, electricity, gas, oil, telecommunications, data, steam, air, or other services, and associated apparatus and structures.
- The arbitration rules are the Capital Works Management Framework (CWMF) Arbitration Rules for use with Public Works and Construction Services Contracts (AR1) published on http://constructionprocurement.gov.ie/arbitration-rules/ on the date 10 days before the latest date for submission of Tenders for this contract (disregarding any amendments posted on that date).
- The Contractor’s agent[18] in the Republic of Ireland for service of legal process is:
- The Contractor’s tendered percentage addition to costs of labour shall include all costs incurred by the Contractor (excluding VAT) for those workers engaged on additional or substituted work required as a result of a Compensation Event, that are additional to the basic hourly rate of pay for the relevant category of worker in an applicable sectoral employment order made under the Industrial Relations Acts 1946-2015. It shall include (but not be limited to) the following components of cost: All costs incurred with meeting legal requirements (including but not limited to PRSI), pension contributions, death in service contributions, sick pay contributions; and Plus Rates; and Allowances; and overheads; and profit and loss of profit. Plus Rates A Plus Rate is the balance remaining when the basic hourly rate of pay for the relevant category of worker under an applicable sectoral employment order made under the Industrial Relations Acts 1946-2015 is deducted from the basic hourly rate of pay paid to a worker in accordance with the workers terms and conditions of employment. It does not include Allowances. Allowances Allowances are payments made to workers that are additional to the basic rate of pay paid to a worker and may include (but not limited to): 1. any bonuses, productivity, incentive or other bonus; 2. any special allowances particular to the category of worker (such as tool money); 3. overtime; 4. unsocial hours working and Sunday working; 5. sick pay and public holiday and annual holiday pay; 6. absences due to training; 7. travelling time; 8. subsistence (such as country money); 9. any other payments not included in the foregoing. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the
- Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
- The Employer have the risk of loss of and damage to its existing facilities and parts of the Works it uses or occupies, in accordance with sub-clause 3.8.
- [FTS-5-v2.3-06-06-2018.docx] have the risk of loss of and damage to its existing facilities and parts of the Works it uses or occupies, in accordance with sub-clause 3.8.
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 1b are left in or deleted the default text for the sub-clause is “The Specialist shall maintain professional indemnity insurance in the amount of at least €6,500,000.00 on an annual aggregate limit until a dat; Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, bu
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 1b are left in or deleted the default text for the sub-clause is “The Specialist shall maintain professional indemnity insurance in the amount of at least €6,500,000.00 on an annual aggregate limit until a dat
- Minimum indemnity limit for Public liability insurance: €6,500,000[6] for any one event, bu
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000[7] for any one event
- Maximum excess for Public liability: €10,000~~[9]~~ in respect of pro
- If required, the minimum indemnity limit for professional indemnity insurance shall be €1,000,000 f annual aggregate limit
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| The Contractor’s tendered percentage addition to costs of labour *(If negative 0% not stated not stated | |||
| The Contractor’s tendered percentage addition to costs of labour *(If negative 0% not stated not stated | |||
| The Contractor’s tendered percentage addition to costs of materials *(If negat 0% not stated not stated | |||
| The Contractor’s tendered percentage addition/deduction to costs of plant *(A 50% not stated not stated | |||
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- Site Visits: The Contract Manager shall visit the Site a minimum of two occasions each month
- APPENDIX 3: Records of Bird Species within 2km of the proposed development site
- We have examined and understand the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information, for the above contract.
- We submit with this Tender the completed Pricing Document and Schedule which form part of this Tender.
- [CA Note: Please choose from the options in the drop down menus below] A Bill of Quantities measured in accordance with the: as included in Volume C. [Where Agreed Rules of Measurement 4 is selected from the drop down menu above it shall be as amended by Supplement 1, Issue 2. Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the Capital Works Management Framework. Where the TII’s Requirements for Measuring and Pricing (RMP) is selected from the drop down menu above, it shall be the latest edition as published by Transport Infrastructure Ireland] *[CA Note: Please choose from the options in the drop down menu below for Mechanical & Electrical
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-02-29T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-02-29T12:00:00+00:00 |
| Date surfaced in documents | 6 June 2018 |
| Date surfaced in documents | April 2016 |
| Date surfaced in documents | July 2023 |
8. Contract terms that matter
Contract duration in the extract: 7 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- The liability of the Surety under this Bond will not exceed € . This amount will be reduced by half on issue of the Certificate of Substantial
- IT IS AGREED as follows in consideration of the payment of €1 by the Employer to the Specialist (receipt of which the Specialist acknowledges
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clauses 3
- not disturb or strip topsoil from areas within 15m of a stand of
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- Terms used in this Tender that are defined in those documents have the same meaning in this Tender.
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: FTS-5-v2.3-06-06-2018.docx, CA Note: Please choose from the options in the drop down menu below for Mechanical & Electrical
[FTS-5-v2.3-06-06-2018.docx, www
[FTS-5-v2.3-06-06-2018.docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: ITT-W1-v2.2-06-06-2018.docx, Schedule and, APPENDIX 3: Records of Bird Species within 2km of the proposed development site.
This tender has been awarded
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,000,000
Scoring
Most Economically Advantageous Tender
Documents (185)
17.19 Prelim H&S Plan_ Phase 1B- December 2023 .pdf
17.0 MB · Specification
172105 Structural Specifications Issue Slip.pdf
109.5 KB · Specification
172105-13 TN1.pdf
394.9 KB · Specification
20201127 - 17.19- Ironmongery schedule. T.01.pdf
33.8 KB · Specification
2021211 - 17.19-T.02 - Fixtures, Fittings,.pdf
128.7 KB · Specification
6456_406 Planting Details.pdf
412.2 KB · Specification
6456_Phase 1B Soft Landscape Specification_SP01.pdf
439.1 KB · Specification
6456_Soft Landscape Specification_SP01.pdf
391.8 KB · Specification
A.1_Project Particulars.pdf
99.6 KB · Specification
Arch Specification.zip
2.8 MB · Specification
J491_PHASE 1B Electrical specification.pdf
3.5 MB · Specification
J491_Phase 1B Mechanical Specification.pdf
1.2 MB · Specification
Room Data Sheets Final Keynotes.pdf
87.9 KB · Specification
Site Works Textures.pdf
1.5 MB · Specification
Volume A.2.1 - Arch specs.zip
5.7 MB · Specification
Volume A.2.2 - Eng specs.zip
3.8 MB · Specification
Volume A.2.3 - ME specs and Volume A.2.4 Landscapes.zip
5.9 MB · Specification
FTS-5-v2.3-06-06-2018.docx
91.4 KB · RFT / Invitation to Tender
ITT-W1-v2.2-06-06-2018.docx
112.2 KB · RFT / Invitation to Tender
172105-51-TN2.pdf
1.4 MB · Pricing / BOQ / Schedule of Rates
1857 Pha.e0x
144.6 KB · Pricing / BOQ / Schedule of Rates
23.12.14 (1857) Preliminaries.pdf
828.9 KB · Pricing / BOQ / Schedule of Rates
3.03 T01.pdf
1.4 MB · Pricing / BOQ / Schedule of Rates
5.05 T02.pdf
2.2 MB · Pricing / BOQ / Schedule of Rates
5.13 T03.pdf
3.5 MB · Pricing / BOQ / Schedule of Rates
J491 Electrical Summary of Prices 1B.pdf
166.7 KB · Pricing / BOQ / Schedule of Rates
J491 Mech Summary of Prices 1B.pdf
150.8 KB · Pricing / BOQ / Schedule of Rates
J491_PHASE 1B Electrical equipment schedules rev B.pdf
150.5 KB · Pricing / BOQ / Schedule of Rates
J491_Phase 1B Mech Plant Schedule.pdf
315.2 KB · Pricing / BOQ / Schedule of Rates
MF-1.10-09-04-2020.docx
51.1 KB · Contract / Agreement / Terms
MF-1.12-09-04-2020.docx
68.9 KB · Contract / Agreement / Terms
MF-1.4-03-08-2010-rev.docx
53.1 KB · Contract / Agreement / Terms
PW-CF5-Agreement-A1-04-11-2009-rev.docx
34.1 KB · Contract / Agreement / Terms
PW-CF5-v2.7-17-07-2023-2.pdf
1.2 MB · Contract / Agreement / Terms
17.19 Inspection Notification Framework 201112.pdf
298.7 KB · Form / Declaration / Certificate
17.19 Submittals register 201127.pdf
114.9 KB · Form / Declaration / Certificate
17.19 Preliminary Inspection Plan 201112.pdf
207.9 KB · Form / Declaration / Certificate
17.19_ DRA 4.07 - Arch. Design Risk Assessment.docx
74.8 KB · Form / Declaration / Certificate
17.19_ DRA 4.07 - Arch. Design Risk Assessment.pdf
299.1 KB · Form / Declaration / Certificate
BSM Design Risk Assessment.pdf
552.7 KB · Form / Declaration / Certificate
MF-1.5-28-07-2009-rev.docx
52.1 KB · Form / Declaration / Certificate
MF-1.6-09-04-2020 (1).docx
58.2 KB · Form / Declaration / Certificate
0 Keynotes 201001.pdf
3.1 MB · Drawing / Plan / Layout
1.1.pdf
997.1 KB · Drawing / Plan / Layout
1.2 T01.pdf
1.3 MB · Drawing / Plan / Layout
1.3 T02.pdf
991.8 KB · Drawing / Plan / Layout
17.19 Kellystown - Trial dig location plan.pdf
952.8 KB · Drawing / Plan / Layout
17.19 Tender Issue Sheet.pdf
79.2 KB · Drawing / Plan / Layout
172-105 PUNCH_Issue_slip.pdf
23.1 KB · Drawing / Plan / Layout
172105 - Drawing Issue Slip.pdf
134.8 KB · Drawing / Plan / Layout
172105-00 TN0.pdf
297.1 KB · Drawing / Plan / Layout
172105-01 TN1.pdf
1.0 MB · Drawing / Plan / Layout
172105-02 TN1.pdf
488.0 KB · Drawing / Plan / Layout
172105-03 TN1.pdf
434.9 KB · Drawing / Plan / Layout
172105-04 TN1.pdf
334.6 KB · Drawing / Plan / Layout
172105-06 TN1.pdf
838.9 KB · Drawing / Plan / Layout
172105-07 TN1.pdf
651.8 KB · Drawing / Plan / Layout
172105-07 TN2.pdf
798.4 KB · Drawing / Plan / Layout
172105-08 TN1.pdf
258.1 KB · Drawing / Plan / Layout
172105-09 TN0.pdf
306.4 KB · Drawing / Plan / Layout
172105-10 TN0.pdf
274.0 KB · Drawing / Plan / Layout
172105-101 TN3.pdf
773.8 KB · Drawing / Plan / Layout
172105-102 TN6.pdf
597.0 KB · Drawing / Plan / Layout
172105-103 TN5.pdf
796.8 KB · Drawing / Plan / Layout
172105-104 TN3.pdf
495.8 KB · Drawing / Plan / Layout
172105-105 TN0.pdf
654.4 KB · Drawing / Plan / Layout
172105-11 TN1.pdf
797.8 KB · Drawing / Plan / Layout
172105-12 TN0.pdf
1.3 MB · Drawing / Plan / Layout
172105-14 TN0.pdf
225.0 KB · Drawing / Plan / Layout
172105-16 TN1.pdf
1.4 MB · Drawing / Plan / Layout
172105-17 TN1.pdf
229.7 KB · Drawing / Plan / Layout
172105-18 TN0.pdf
518.9 KB · Drawing / Plan / Layout
172105-19 TN1.pdf
230.2 KB · Drawing / Plan / Layout
172105-20 TN1.pdf
287.1 KB · Drawing / Plan / Layout
172105-50-TN0.pdf
436.9 KB · Drawing / Plan / Layout
172105-52-TN2.pdf
893.9 KB · Drawing / Plan / Layout
172105-53-TN2.pdf
1.5 MB · Drawing / Plan / Layout
172105-54-TN2.pdf
949.0 KB · Drawing / Plan / Layout
172105-55 TN1.pdf
542.7 KB · Drawing / Plan / Layout
172105-57 TN1.pdf
541.3 KB · Drawing / Plan / Layout
172105-58-TN0.pdf
322.2 KB · Drawing / Plan / Layout
172105-59 TN1.pdf
587.5 KB · Drawing / Plan / Layout
172105-60-TN0.pdf
213.6 KB · Drawing / Plan / Layout
172105-63 TN1.pdf
332.9 KB · Drawing / Plan / Layout
172105-64-TN2.pdf
336.3 KB · Drawing / Plan / Layout
2.1 T02.pdf
916.7 KB · Drawing / Plan / Layout
2.2 T03.pdf
1.3 MB · Drawing / Plan / Layout
2.3 T03.pdf
1.5 MB · Drawing / Plan / Layout
2.4 T03.pdf
1.3 MB · Drawing / Plan / Layout
2.5 T01.pdf
2.0 MB · Drawing / Plan / Layout
2.6 T01.pdf
2.3 MB · Drawing / Plan / Layout
20-12-04_J491_Drawing Issue Sheet_Electrical & Mechanical 1.pdf
71.5 KB · Drawing / Plan / Layout
200928 Building Detail Keynotes Extra.pdf
48.3 KB · Drawing / Plan / Layout
201130 - Issue Sheet - 17.19 -Kellystown Cemetery.pdf
110.2 KB · Drawing / Plan / Layout
3.01 T03.pdf
1.0 MB · Drawing / Plan / Layout
3.02 T02.pdf
975.5 KB · Drawing / Plan / Layout
4.01 T02.pdf
872.6 KB · Drawing / Plan / Layout
4.02 T03.pdf
590.9 KB · Drawing / Plan / Layout
4.03 T01.pdf
1.0 MB · Drawing / Plan / Layout
4.04 T01.pdf
1.6 MB · Drawing / Plan / Layout
4.05 T02.pdf
753.0 KB · Drawing / Plan / Layout
5.01 T03.pdf
3.6 MB · Drawing / Plan / Layout
5.02 T03.pdf
3.8 MB · Drawing / Plan / Layout
5.03 T02.pdf
2.1 MB · Drawing / Plan / Layout
5.04 T03.pdf
2.2 MB · Drawing / Plan / Layout
5.06.pdf
477.8 KB · Drawing / Plan / Layout
5.07.pdf
3.3 MB · Drawing / Plan / Layout
5.08.pdf
3.1 MB · Drawing / Plan / Layout
5.11 T02.pdf
1.0 MB · Drawing / Plan / Layout
5.12 T02.pdf
1008.9 KB · Drawing / Plan / Layout
5.14 T02.pdf
584.2 KB · Drawing / Plan / Layout
5.15 T02.pdf
749.9 KB · Drawing / Plan / Layout
5.16 T02.pdf
1.2 MB · Drawing / Plan / Layout
5.17.pdf
993.0 KB · Drawing / Plan / Layout
5.18 T01.pdf
579.6 KB · Drawing / Plan / Layout
5.21 T01.pdf
1.2 MB · Drawing / Plan / Layout
5.22.pdf
827.7 KB · Drawing / Plan / Layout
6.01 T01.pdf
544.8 KB · Drawing / Plan / Layout
6456_402 Ground Preparation Plan.pdf
2.4 MB · Drawing / Plan / Layout
6456_403 Planting Plan-Key Plan.pdf
2.1 MB · Drawing / Plan / Layout
6456_404 Planting Plan Sheet 1of2.pdf
1.4 MB · Drawing / Plan / Layout
6456_405 Planting Plan Sheet 2of2.pdf
2.9 MB · Drawing / Plan / Layout
6456_Issue Sheet 2017-11-16.pdf
55.4 KB · Drawing / Plan / Layout
6456_Issue Sheet 2020-09-15.pdf
55.7 KB · Drawing / Plan / Layout
Building Details Final Keynotes.pdf
111.1 KB · Drawing / Plan / Layout
Building Details Keynotes.pdf
116.1 KB · Drawing / Plan / Layout
Drainage Layout.pdf
5.8 MB · Drawing / Plan / Layout
Engineers Site Layout.pdf
5.9 MB · Drawing / Plan / Layout
ESB_20171023.pdf
126.6 KB · Drawing / Plan / Layout
Extra Building Detail Keynotes.pdf
48.4 KB · Drawing / Plan / Layout
HSTON2E0.pat
9.7 KB · Drawing / Plan / Layout
J491(52)01.pdf
378.4 KB · Drawing / Plan / Layout
J491(53)01.pdf
387.1 KB · Drawing / Plan / Layout
J491(56)01.pdf
431.5 KB · Drawing / Plan / Layout
J491(57)01.pdf
393.5 KB · Drawing / Plan / Layout
J491(6-)04 (1).pdf
457.1 KB · Drawing / Plan / Layout
J491(6-)04.pdf
457.1 KB · Drawing / Plan / Layout
J491(62)01.pdf
319.5 KB · Drawing / Plan / Layout
J491(63)01.pdf
306.1 KB · Drawing / Plan / Layout
J491(63)02.pdf
263.4 KB · Drawing / Plan / Layout
J491(67)01.pdf
255.2 KB · Drawing / Plan / Layout
J491_Drawing Issue Sheet_Site Services.pdf
32.5 KB · Drawing / Plan / Layout
key plan.pdf
144.6 KB · Drawing / Plan / Layout
Plan Descriptive Notes.pdf
57.1 KB · Drawing / Plan / Layout
plot.log
5.5 KB · Drawing / Plan / Layout
Riverwood Storm Water Outfall TIM.pdf
164.6 KB · Drawing / Plan / Layout
Site Vehicle Tracking Layout.pdf
5.8 MB · Drawing / Plan / Layout
172105-05 TN0.pdf
289.8 KB · Other
172105-56 TN1.pdf
434.0 KB · Other
2016.10.10_ REPORT to COUNCIL_Final.pdf
954.9 KB · Other
Conversion.txt
7.9 KB · Other
Fixt's-Fitt's-Finish Sch.zip
76.4 KB · Other
Ironmongery Schedule.zip
20.4 KB · Other
J491_Mechanical Design risk Assessment.pdf
73.7 KB · Other
Proposed Kellystown Cemetery Site_RDAS_130917.pdf
1.1 MB · Other
PUNCH Risk Register 170717.pdf
146.6 KB · Other
16-088-P-001_site location.pdf
1.5 MB
16-088-P-003_access road.pdf
8.9 MB
160063 Kellystown Cemetery ECOLOGICAL IMPACT ASSESSMENT.pdf
1.7 MB
17.19 Inspection Notification Framework 200811.xlsx
68.6 KB
17.19 Submittals register 201127.xlsx
68.7 KB
17.19 Arch Spec.pdf
3.5 MB
17.19 Prelim H&S Plan_ Phase 1B- December 2023.doc
48.2 MB
17.19 Preliminary Inspection Plan 200811.xlsx
25.5 KB
172105 Structural Specification - Tender December 2020.pdf
4.4 MB
172105-S15 Siteworks Spec 171107.pdf
747.4 KB
181031 Rowlands trial dig results.pdf
505.7 KB · Appendix / Annex
23.12.14 (1857) Phase 1B PD REV000.xlsX
145.5 KB
23.12.14 (1857) Pricing Document.pdf
1.4 MB
Archaeological Desktop Assessment.pdf
9.7 MB
Detailed Quantitative Risk Assessment - Pre planning.pdf
4.1 MB
Ground Investigation Drawing (3).pdf
163.7 KB
J491(6-)02_rev B.pdf
1.2 MB
J491(6-)03.pdf
1.1 MB
J491_BWIC_Builders Works Schedule - Phase 1B.pdf
538.3 KB · Appendix / Annex
Kellystown Cemetery AA Screening.pdf
1.1 MB
PUNCH Risk Register 170717.doc
223.0 KB
REPORT from Planning Part 8.pdf
289.9 KB
Site Investigation Apr 2016.pdf
36.0 MB
T 1.01 rev.A.pdf
2.1 MB
T 1.01.1 rev.A.pdf
552.2 KB
T 1.01.2.pdf
773.2 KB
Updated Building Keynotes.pdf
187.0 KB · Appendix / Annex
Updated Keynotes- 20200902.xlsx
107.7 KB · Appendix / Annex
Water Service Observation Report.pdf
29.4 KB
Original notice text
This tender involves the construction and operation of burial plots, memorials, staff facilities, and parking at Kellystown Cemetery over a 7-year period.
AI analysis updated 4 months ago
Deadline
29 Feb
Buyer
Fingal County CouncilLocation
Ireland
Procedure
Open
Clarification
17 Jan 2024
eTenders ID
2876550
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender