Remedial fire works, upgrade of heating and hydrotherapy pool at Central Remedial Clinic Clontarf
Value
€450k
Deadline
19 Jan
19 Jan 2024
Value
€450k
Deadline
19 Jan
Upgrade of heating and hydrotherapy pool at Central Remedial Clinic Clontarf
Upgrade of heating and hydrotherapy pool at Central Remedial Clinic Clontarf
Bidder profile
Mid-sized to large firms with experience in public sector projects and compliance processes.
Risks & flags
- Qualification gate turnover threshold
- Two-step process
- Technical granularity dependent on ITT
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Central Remedial Clinic |
| Title | Remedial fire works, upgrade of heating and hydrotherapy pool at Central Remedial Clinic Clontarf |
| CPV / category | works |
| Estimated value | 450000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 10 years |
| Submission deadline | 2024-01-19T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Central Remedial Clinic ran this procurement for “Remedial fire works, upgrade of heating and hydrotherapy pool at Central Remedial Clinic Clontarf” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- Insulated Pipe Support Inserts shall be a minimum of 99 mm in length to allow for
- supply in accordance with the parameters laid down in BS EN 60598-2-22
- system/fire ceilings & general building works to existing Health Care Facility
- heating system/fire ceilings & general building works to existing Health
- Scope of works of specialist pool contractor for the Hydro pool room.- Bracken Pool Services
- annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports
- Persons under a contract of service or apprenticeship with the insured
- Persons under a contract of service or apprenticeship with the insured.
- Effecting or maintenance of insurance of or in connection with the provision of finance or advice on financial
- Radon System, Tanking Membranes Certification.
- steam, air, or other services, and associated apparatus and structures. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Various fire stopping works to existing fire walls, installation of new heating
- system/fire ceilings & general building works to existing Health Care Facility
- Various fire stopping works to existing fire walls, installation of new
- heating system/fire ceilings & general building works to existing Health
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 4 27/01/2014 16 RESPONSE: NOT REQUIRED (i) The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for - Not Applicable €CA Entry CA Note: State the minimum cover proportionate to the size of the project (default level is €2.5m) (ii) The excess as stated here: Max; Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 CA Entry: State above the minimum level
- Certifications — not specified for this tender
- Past experience — The minimum average Construction Works turnover required over the last three years is €1.0 million per year (Ex Vat); 4 27/01/2014 16 RESPONSE: NOT REQUIRED (i) The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for - Not Applicable €CA Entry CA Note: State the minimum cover proportionate to the size of the project (default level is €2.5m) (ii) The excess as stated here: Max
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- The minimum average Construction Works turnover required over the last three years is €1.0 million per year (Ex Vat)
- 4 27/01/2014 16 RESPONSE: NOT REQUIRED (i) The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for - Not Applicable €CA Entry CA Note: State the minimum cover proportionate to the size of the project (default level is €2.5m) (ii) The excess as stated here: Max
- Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 CA Entry: State above the minimum level
- 4 27/01/2014 17 Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 No excess for any one event Tenderer
- Minimum Indemnity Limit for Public Liability Insurance €6,500,000 for any one event
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- the Pricing Document is more than €500.
- The minimum requirements under this criteria is the submssion of 2 CV's which shall include a CV for (1)
- [FTS-5-v2.6-17-07-2023.pdf] Tender and Schedule for Public Works Contract for MINOR Building or Civil Engineering Works Designed by the Employer
- [FTS-5-v2.6-17-07-2023.pdf] on Ave,
- Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental
- We submit with this Tender the completed Pricing Document and Schedule and Works Proposals which form part of
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-01-19T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-01-19T12:00:00+00:00 |
| Date surfaced in documents | 17 January 2022 |
| Date surfaced in documents | 1 June 2002 |
| Date surfaced in documents | 07 December 2022 |
8. Contract terms that matter
Contract duration in the extract: 10 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Insulated Pipe Support Inserts shall be a minimum of 99 mm in length to allow for
- Constructed from mild steel and hot dipped galvanised to BS EN 10346:2009
- Constructed from mild steel and hot dipped galvanised to EN 10346:2009 complete with
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
- workmanship within 12 months of the handing over and acceptance of the installation by
- the date 10 days before the last day for receipt of the
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: not later than 5 days after the date agreed between the
- Within 14 days of receipt of the payment claim notice
- pay the amount due on the invoice within 21 days after receiving the invoice
- If, within 14 days of the issue of the certificate of Subs
- 3 within 21 days after receiving
- 3 within 21 days after receiving the invoice [less any a
TENDER DOCUMENTS [FTS-5-v2.6-17-07-2023.pdf, FTS-5-v2.6-17-07-2023.pdf, Where Agreed Rules of Measurement 4 is selected from the drop down menu above it shall be as amended by Supplement 1, Issue 2. Where Civil Engineering Standard Method of Measurement 3 is selected from the drop down menu above it shall be the 3rd Edition as amended in accordance with Section 5.2 of Guidance Note GN 1.5.3 of the
[FTS-5-v2.6-17-07-2023.pdf.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: Schedule and, scheduled to suit the Employer, Schedule for Public Works Contract for MINOR Building or Civil Engineering Works Designe.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,500,000
Scoring
Most Economically Advantageous Tender
Documents (70)
3079-E-SP-001 Electrical Particular Specification.pdf
1021.4 KB · Specification
3079-M-BMS-001 Vol A BMS Points List.pdf
713.9 KB · Specification
3079-M-GSP-001 Vol A Mechanical General Specification.pdf
3.3 MB · Specification
3079-M-SCH-001 Mechanical Equipment Schedule.pdf
1.1 MB · Specification
3079-M-SP-001 Mechanical Particular Specification.pdf
1.8 MB · Specification
Preliminary Health & Safety Plan.pdf
381.5 KB · Specification
FTS-5-v2.6-17-07-2023.pdf
446.5 KB · RFT / Invitation to Tender
ITT-W2.pdf
344.5 KB · RFT / Invitation to Tender
3079-BW-SCH-001.pdf
679.0 KB · Pricing / BOQ / Schedule of Rates
3079-E-PS-001 Electrical Services Pricing Schedule.pdf
446.9 KB · Pricing / BOQ / Schedule of Rates
3079-E-SCH-001 Electrical Lighting Schedule.pdf
404.9 KB · Pricing / BOQ / Schedule of Rates
3079-M-PS-001 Mechanical Services Pricing Schedule.pdf
250.0 KB · Pricing / BOQ / Schedule of Rates
Important Note Re. Pricing Document.pdf
174.4 KB · Pricing / BOQ / Schedule of Rates
Volume C Pricing Document CRC Alterations 2023.pdf
1.3 MB · Pricing / BOQ / Schedule of Rates
Apointment of PSCS MF1.10 (PWCF 1-5).docx
54.0 KB · Contract / Agreement / Terms
Contractor Insurance Questionnaire.pdf
102.4 KB · Contract / Agreement / Terms
PW-CF5.pdf
1.2 MB · Contract / Agreement / Terms
QW2.pdf
440.1 KB · Form / Declaration / Certificate
23592-000-Site Location & Layout Plan.pdf
733.0 KB · Drawing / Plan / Layout
23592-TEN-100 Boiler Rooms GA.pdf
2.6 MB · Drawing / Plan / Layout
23592-TEN-110 Main Boiler House.pdf
3.7 MB · Drawing / Plan / Layout
23592-TEN-200 Hydrotherapy Pool 01.pdf
1.5 MB · Drawing / Plan / Layout
23592-TEN-210 Hydrotherapy Pool 02.pdf
550.5 KB · Drawing / Plan / Layout
23592-TEN-300 Kitchen Floor Plan.pdf
697.5 KB · Drawing / Plan / Layout
23592-TEN-310 Kitchen Fire Barrier Detail.pdf
243.9 KB · Drawing / Plan / Layout
23592-TEN-400 Door Schedule.pdf
511.7 KB · Drawing / Plan / Layout
3079-BW-101.pdf
615.9 KB · Drawing / Plan / Layout
3079-BW-102.pdf
653.3 KB · Drawing / Plan / Layout
3079-ELEC-301 BOILER HOUSE.pdf
979.3 KB · Drawing / Plan / Layout
3079-ELEC-303 HYDRO POOL.pdf
664.5 KB · Drawing / Plan / Layout
3079-ELEC-304 KITCHEN REMOVALS.pdf
2.8 MB · Drawing / Plan / Layout
3079-ELEC-305 KITCHEN.pdf
778.0 KB · Drawing / Plan / Layout
3079-ELEC-306 PLANT ROOM ABOVE KTICHEN.pdf
572.5 KB · Drawing / Plan / Layout
3079-MECH-301 BOILER HOUSE.pdf
633.3 KB · Drawing / Plan / Layout
3079-MECH-303 KITCHEN.pdf
434.0 KB · Drawing / Plan / Layout
3079-MECH-701 BOILER HOUSE SCHEMATIC.pdf
654.8 KB · Drawing / Plan / Layout
DRAFT-21079-CRC-FCC-00-00-DR-YF-1000-RA-REPORT_21.01.2022.pdf
2.0 MB · Drawing / Plan / Layout
DRAFT-21079-CRC-FCC-00-00-DR-YF-1001-RA-DOORS_21.01.2022.pdf
2.1 MB · Drawing / Plan / Layout
plot.log
2.5 KB · Drawing / Plan / Layout
21079-CRC_RA Report.pdf
1.1 MB · Other
3079-MECH-302 KITCHEN REMOVALS.pdf
2.1 MB · Other
Asbestos Management Report.pdf
1.5 MB · Other
Asbestos Refurbishment Demolition.pdf
1.2 MB · Other
Cover Letter.pdf
256.0 KB · Other
21079-CRC_RA doors.pdf
882.4 KB · Appendix / Annex
Award criteria Evaluation sheet.pdf
282.4 KB · Tender Response Template
CRC Alterations 20023.xlsx
89.5 KB
CRC Remedial Works - M&E Issue Sheet.pdf
276.1 KB · Appendix / Annex
QW2-Appendix-D.docx
28.0 KB · Appendix / Annex
QW2-Appendix-E.docx
33.2 KB · Appendix / Annex
QW2-Appendix-F.docx
32.0 KB · Appendix / Annex
QW2-Appendix-G.docx
28.0 KB · Appendix / Annex
QW2_Appendix_A1.doc
46.5 KB
QW2_Appendix_A2.doc
54.5 KB
QW2_Appendix_B1.doc
85.0 KB
QW2_Appendix_B2.doc
63.0 KB
QW2_Appendix_B3.doc
67.0 KB
QW2_Appendix_C1.doc
62.0 KB
QW2_Appendix_C2.doc
62.5 KB
QW2_Appendix_C3.doc
63.0 KB
QW2_Appendix_C4.doc
63.0 KB
QW2_Appendix_C5.doc
62.0 KB
QW2_Appendix_C6.doc
61.0 KB
QW2_Appendix_H.doc
48.5 KB
QW2_Appendix_I.doc
46.0 KB
QW2_Supplement_3.4.1.doc
97.5 KB
QW2_Supplement_3.4.2.doc
111.5 KB
QW2_Supplement_3.4.3.doc
115.5 KB
QW2_Supplement_3.4.4.doc
114.5 KB
Works Proposal.pdf
211.7 KB · Tender Response Template
Original notice text
This tender involves remedial fire works and the upgrade of heating and hydrotherapy pool facilities at the Central Remedial Clinic in Clontarf, focusing on compliance and operational service execution.
AI analysis updated 4 months ago
Value
€450k
Deadline
19 Jan
Buyer
Central Remedial ClinicLocation
Ireland
Procedure
Open
Clarification
10 Jan 2024
eTenders ID
2816866
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender