Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council
Deadline
12 Jan
12 Jan 2024
Deadline
12 Jan
Construction and maintenance of Watergate Urban Park in Kilkenny.
Construction and maintenance of Watergate Urban Park in Kilkenny.
Bidder profile
Mid-sized to large firms with experience in public sector projects and compliance with quality assurance standards.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Kilkenny County Council_1185 |
| Title | Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 month |
| Submission deadline | 2024-01-12T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Kilkenny County Council_1185 ran this procurement for “Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Sector: Building Services & Maintenance
- Where the estimated value of the contract is above €5m (Services) and €15m (Works)
- • Evidence of ISO9001 & OHSAS 18001 Quality Systems Accreditation
- have calibration certificates which are within 3 months of the current date, and are suitable for the system parameters being commissioned
- the site, diversion and protection of existing services, construction of outdoor stage, canopy,
- soft landscape elements, as well as stormwater and other services connections all as set out
- and the Contractor shall confine his operations to the areas marked. The boundaries of the site
- however further unknown services may be present. Details of existing services including
- The services cables and pipes are underground and overground and their approximate location
- 1.3.10 The contractor must ensure the safety of these services during the works. The location of these
- and any other discovered services should be recorded on the as-built drawings.
- working outside the curtilage of the site boundaries in connecting the services or other network Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- external seating at the Watergate Theatre, Kilkenny and will include the stripping of the existing
- surfaces, demolitions of existing masonry boundary wall and concrete loading dock, regrading of
- the site, diversion and protection of existing services, construction of outdoor stage, canopy,
- [003P+U WUP - Project Particulars & Preliminaries.pdf] existing masonry boundary wall and concrete loading dock, regrading of
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See; * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Certifications — not specified for this tender
- Past experience — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Construction related activities[17] € 1,200,000.00 The applicant must project evidence o; The minimum average Construction Works turnover required over the last three years is €600,000 per Year (ex VAT); * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
- Personnel — not specified for this tender
- Geographic / facility constraints — 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See
- Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Construction related activities[17] € 1,200,000.00 The applicant must project evidence o
- The minimum average Construction Works turnover required over the last three years is €600,000 per Year (ex VAT)
-
- The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
-
- The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided * The excess as stat
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|
- The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated ed here: Maximum permissible excess on Professional Indemnity Insu 2% not stated not stated | e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- [003P+U WUP - Project Particulars & Preliminaries.pdf] ................................................................... 34
- [003P+U WUP - Project Particulars & Preliminaries.pdf] existing masonry boundary wall and concrete loading dock, regrading of
- [003P+U WUP - Project Particulars & Preliminaries.pdf] completion is to be within 120 days of occupation.
- [003P+U WUP - Project Particulars & Preliminaries.pdf] Particulars & Preliminaries
- [003P+U WUP - Project Particulars & Preliminaries.pdf] the contract.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2024-01-12T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2024-01-12T12:00:00+00:00 |
| Date surfaced in documents | Act 1997 |
| Date surfaced in documents | Act 1972 |
| Date surfaced in documents | September 2008 |
8. Contract terms that matter
Contract duration in the extract: 12 month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- produce a tax reference number where payments exceed €650. Records of tax reference
- Where payments exceed €2,500 in any 12 month period the Sub
- CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
- nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
- it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
- the same terms as the insurances the Contractor is required to have under clause 10
- molten zinc containing a minimum of 98% zinc, as per IS EN ISO 1461 : 2009 Hot Dip Galvanized
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: 003P+U WUP - Project Particulars & Preliminaries.pdf, Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liabilit, schedules and other documents, check all.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: Schedule of Rates / Bill of Quantities and the, Schedule of Rates / Bill of Quantities fully priced in ink or digitally., Appendix C..
This tender has been awarded
- Suirside Construction Ltd · 07 Oct 2024
Can you bid?
Required certifications
- ISO 9001
- OHSAS 18001
Minimum turnover
€600,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Scoring
Lowest Price
Documents (78)
003P+U - WUP - Vol A2.1 - Architectural Specification.pdf
966.1 KB · Specification
003P+U - WUP - Vol A2.3-Landscape Specification.pdf
690.2 KB · Specification
003P+U - WUP - Vol A2.5 - Loading Dock Specfication.pdf
476.0 KB · Specification
003P+U - WUP - Works Requirement Schedule.pdf
202.5 KB · Specification
Electrical Contract Specification T1.pdf
610.2 KB · Specification
ICOM-DH-VOG.15.K1-EN-2022-A4.pdf
2.8 MB · Specification
003P+U WUP - Project Particulars & Preliminaries.pdf
572.8 KB · RFT / Invitation to Tender
ITT-W4-v1.5-01-08-2023-1.pdf
282.5 KB · RFT / Invitation to Tender
MF-1.22-09-04-2020 (5).docx
35.9 KB · Contract / Agreement / Terms
PW-CF6-v1.14-19-07-2023.pdf
612.0 KB · Contract / Agreement / Terms
MF-1.23-09-04-2020 (4).docx
35.3 KB · Form / Declaration / Certificate
New Article 57 Declaration.docx
49.0 KB · Form / Declaration / Certificate
QW-Part-2-v1.0-28-07-2023-2 (2).docx
69.9 KB · Form / Declaration / Certificate
QW2-Part-1-v2.0-28-07-2023-1 (1).docx
180.6 KB · Form / Declaration / Certificate
W0982 - Volume B - Form of Tender.pdf
287.6 KB · Form / Declaration / Certificate
E-000 ELECTRICAL SYMBOLS SHEET-A1.pdf
440.3 KB · Drawing / Plan / Layout
E-001 LV DISTRIBUTION SINGLE LINE DIAGRAM-A1.pdf
246.5 KB · Drawing / Plan / Layout
E-100 STAGE ELECTRICAL LAYOUT-A3.pdf
408.2 KB · Drawing / Plan / Layout
E-1001 NEW SITE SERVICES LAYOUT-A1.pdf
2.2 MB · Drawing / Plan / Layout
003P+U - WUP - Preliminary H&S Plan.pdf
11.0 MB · Other
RMCE Document Issue Register 29-11-23.pdf
302.4 KB · Other
003-P+U - Watergate Urban Park -Document Register.pdf
51.9 KB · Appendix / Annex
003-P+U-XX-A-T-3102-R01-Proposed Site Elevations.pdf
1.1 MB
003-P+U-XX-A-T-5100-R01-Proposed Stage-GA.pdf
2.2 MB
003-P+U-XX-A-T-5101-R01-Proposed Stage-Architectural Details.pdf
4.9 MB
003-P+U-XX-A-T-5106-P01-Proposed Canopy-GA & Details.pdf
1.4 MB
003-P+U-XX-C-T-0000-R01-Civil Notes.pdf
2.2 MB
003-P+U-XX-E-T-0003-R01-Existing Site Layout-Demolitions.pdf
2.1 MB
003-P+U-XX-E-T-1000-R01-Proposed Site Layout-General Arrangements.pdf
2.8 MB
003-P+U-XX-E-T-1001-R01-Proposed Site Layout-Set Out & Levels.pdf
2.4 MB
003-P+U-XX-E-T-1002-R01-Proposed Site Layout-Sub Structures.pdf
2.2 MB
003-P+U-XX-E-T-1003-R01-Proposed Site Layout-Super Structures.pdf
2.6 MB
003-P+U-XX-E-T-1005-R01-Proposed Site Layout-Drainage & Water Services.pdf
2.0 MB
003-P+U-XX-E-T-1006-R01-Proposed Site Layout-Utilities.pdf
1.9 MB
003-P+U-XX-E-T-1007-R01-Proposed Boundaries & interfaces.pdf
2.3 MB
003-P+U-XX-E-T-3100-R01-Proposed Site Sections-Sheet 1 of 2.pdf
2.4 MB
003-P+U-XX-E-T-3101-R01-Proposed Site Sections-Sheet 2 of 2.pdf
1.9 MB
003-P+U-XX-E-T-5102-R01-Proposed Stage-Structural.pdf
1.3 MB
003-P+U-XX-E-T-5103-R01-Proposed Stage Structural Details.pdf
1.4 MB
003-P+U-XX-E-T-5107-R01-Proposed Canopy-Structural.pdf
1.5 MB
003-P+U-XX-E-T-5108-P01-Proposed Benches & Seating Sheet 1 of 4.pdf
1.3 MB
003-P+U-XX-E-T-5109-P01-Proposed Benches & Seating Sheet 2 of 4.pdf
1.3 MB
003-P+U-XX-E-T-5112-R01-Proposed Boundary-Structural.pdf
1.1 MB
003-P+U-XX-E-T-5113-R01-Proposed Hydraulic Lift Frame-Structures.pdf
1.1 MB
003-P+U-XX-E-T-5120-R01-Drainage & Water Service Details.pdf
1.2 MB
003-P+U-XX-E-T-5121-R01-Drainage & Water Service Details-Sheet 2 of 2.pdf
1.9 MB
003-P+U-XX-E-T-5122-R01-Prosed Details-Utilities.pdf
1.3 MB
003-P+U-XX-E-T-5123-R01-Proposed General Details Sheet 1 of 2.pdf
1.5 MB
003-P+U-XX-E-T-5123A-R01-Proposed General Details Sheet 2 of 2.pdf
790.3 KB
003-P+U-XX-L-T-0000-R01-Landscape Notes.pdf
1.3 MB
003-P+U-XX-L-T-5125-R01-Proposed Details-Landscaping & Paving.pdf
2.4 MB
003-P+U-XX-S-T-0000-R01-Structural Notes.pdf
1.6 MB
003P+U - WUP - Vol A2.2 - C& S Specification.pdf
2.5 MB
Electrical Pricing Document.xlsx
24.8 KB
ITTW4_Invitation_to_Tender.doc
31.5 KB
Note for Use of MS Excel File.xlsx
22.5 KB
Planners Report.pdf
169.6 KB
QW2-Appendix-D.docx
15.4 KB · Appendix / Annex
QW2-Appendix-E.docx
20.6 KB · Appendix / Annex
QW2-Appendix-F.docx
19.4 KB · Appendix / Annex
QW2-Appendix-G.docx
15.4 KB · Appendix / Annex
QW2_Appendix_A1.doc
30.5 KB
QW2_Appendix_A2.doc
38.5 KB
QW2_Appendix_B1.doc
69.0 KB
QW2_Appendix_B2.doc
47.0 KB
QW2_Appendix_B3.doc
50.5 KB
QW2_Appendix_C1.doc
46.0 KB
QW2_Appendix_C2.doc
46.5 KB
QW2_Appendix_C3.doc
47.0 KB
QW2_Appendix_C4.doc
47.0 KB
QW2_Appendix_C5.doc
46.0 KB
QW2_Appendix_C6.doc
45.0 KB
QW2_Appendix_H.doc
32.5 KB
QW2_Appendix_I.doc
30.0 KB
QW2_Supplement_3.4.1.doc
81.5 KB
QW2_Supplement_3.4.2.doc
95.5 KB
W0982 - Volume C - Schedule of Rates.pdf
515.8 KB
W0982 - Watergate SOR.xlsx
131.1 KB
Original notice text
This tender involves the construction and operational management of Watergate Urban Park, including site preparation, service connections, and compliance with safety regulations.
AI analysis updated 4 months ago
Deadline
12 Jan
Buyer
Kilkenny County CouncilLocation
Watergate Urban Park, Parliament Street, Kilkenny, Ireland.
Procedure
Open
Clarification
02 Jan 2024
eTenders ID
2803673
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender