← Tenders / Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council
Awarded Building Services & Maintenance Works Open

Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council

Deadline

12 Jan

Construction and maintenance of Watergate Urban Park in Kilkenny.

SME fit: Medium Bid effort: Medium 📍 Kilkenny

Construction and maintenance of Watergate Urban Park in Kilkenny.

Bidder profile

Mid-sized to large firms with experience in public sector projects and compliance with quality assurance standards.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Kilkenny County Council_1185
Title Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 month
Submission deadline 2024-01-12T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Kilkenny County Council_1185 ran this procurement for “Watergate Urban Park, Parliament Street, Kilkenny for Kilkenny County Council” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • • Evidence of ISO9001 & OHSAS 18001 Quality Systems Accreditation
  • have calibration certificates which are within 3 months of the current date, and are suitable for the system parameters being commissioned
  • the site, diversion and protection of existing services, construction of outdoor stage, canopy,
  • soft landscape elements, as well as stormwater and other services connections all as set out
  • and the Contractor shall confine his operations to the areas marked. The boundaries of the site
  • however further unknown services may be present. Details of existing services including
  • The services cables and pipes are underground and overground and their approximate location
  • 1.3.10 The contractor must ensure the safety of these services during the works. The location of these
  • and any other discovered services should be recorded on the as-built drawings.
  • working outside the curtilage of the site boundaries in connecting the services or other network Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • external seating at the Watergate Theatre, Kilkenny and will include the stripping of the existing
  • surfaces, demolitions of existing masonry boundary wall and concrete loading dock, regrading of
  • the site, diversion and protection of existing services, construction of outdoor stage, canopy,
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] existing masonry boundary wall and concrete loading dock, regrading of

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See; * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
  • Certifications — not specified for this tender
  • Past experienceTurnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Construction related activities[17] € 1,200,000.00 The applicant must project evidence o; The minimum average Construction Works turnover required over the last three years is €600,000 per Year (ex VAT); * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
  • Personnel — not specified for this tender
  • Geographic / facility constraints — 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 2 Evidence of insurance shall be required prior to commencement on site in accordance with the Form of Tender & Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liability Insurance - Minimum €13,000,000 Contractor All Risks Insurance - See
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Construction related activities[17] € 1,200,000.00 The applicant must project evidence o
  • The minimum average Construction Works turnover required over the last three years is €600,000 per Year (ex VAT)
    • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € CA Entry[19] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m)
    • The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided * The excess as stat

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
  • The excess as stated here: Maximum permissible excess on Profess 2% not stated not stated ed here: Maximum permissible excess on Professional Indemnity Insu 2% not stated not stated | e in any one claim below which the will bear the cost is the greater amount of 2 | 2% | not stated | not stated | The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] ................................................................... 34
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] existing masonry boundary wall and concrete loading dock, regrading of
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] completion is to be within 120 days of occupation.
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] Particulars & Preliminaries
  • [003P+U WUP - Project Particulars & Preliminaries.pdf] the contract.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-01-12T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-01-12T12:00:00+00:00
Date surfaced in documents Act 1997
Date surfaced in documents Act 1972
Date surfaced in documents September 2008

8. Contract terms that matter

Contract duration in the extract: 12 month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • produce a tax reference number where payments exceed €650. Records of tax reference
  • Where payments exceed €2,500 in any 12 month period the Sub
  • CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • nt and continues for as long as, under the Construction Regulations, the Client is required to have a project supervisor for the for the Project, unless the appointment is terminated earlier
  • it is insured by insurances in the same terms as the insurances the Contractor is required to have under clause 10
  • the same terms as the insurances the Contractor is required to have under clause 10
  • molten zinc containing a minimum of 98% zinc, as per IS EN ISO 1461 : 2009 Hot Dip Galvanized

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 003P+U WUP - Project Particulars & Preliminaries.pdf, Schedules and to be: Public Liability Insurance - Minimum €6,500,000 Employer’s Liabilit, schedules and other documents, check all.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Schedule of Rates / Bill of Quantities and the, Schedule of Rates / Bill of Quantities fully priced in ink or digitally., Appendix C..

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • OHSAS 18001

Minimum turnover

€600,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Lowest Price

Documents (78)

PDF

003P+U - WUP - Vol A2.1 - Architectural Specification.pdf

966.1 KB · Specification

PDF

003P+U - WUP - Vol A2.3-Landscape Specification.pdf

690.2 KB · Specification

PDF

003P+U - WUP - Vol A2.5 - Loading Dock Specfication.pdf

476.0 KB · Specification

PDF

003P+U - WUP - Works Requirement Schedule.pdf

202.5 KB · Specification

PDF

Electrical Contract Specification T1.pdf

610.2 KB · Specification

PDF

ICOM-DH-VOG.15.K1-EN-2022-A4.pdf

2.8 MB · Specification

PDF

003P+U WUP - Project Particulars & Preliminaries.pdf

572.8 KB · RFT / Invitation to Tender

PDF

ITT-W4-v1.5-01-08-2023-1.pdf

282.5 KB · RFT / Invitation to Tender

DOCX

MF-1.22-09-04-2020 (5).docx

35.9 KB · Contract / Agreement / Terms

PDF

PW-CF6-v1.14-19-07-2023.pdf

612.0 KB · Contract / Agreement / Terms

DOCX

MF-1.23-09-04-2020 (4).docx

35.3 KB · Form / Declaration / Certificate

DOCX

New Article 57 Declaration.docx

49.0 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.0-28-07-2023-2 (2).docx

69.9 KB · Form / Declaration / Certificate

DOCX

QW2-Part-1-v2.0-28-07-2023-1 (1).docx

180.6 KB · Form / Declaration / Certificate

PDF

W0982 - Volume B - Form of Tender.pdf

287.6 KB · Form / Declaration / Certificate

PDF

E-000 ELECTRICAL SYMBOLS SHEET-A1.pdf

440.3 KB · Drawing / Plan / Layout

PDF

E-001 LV DISTRIBUTION SINGLE LINE DIAGRAM-A1.pdf

246.5 KB · Drawing / Plan / Layout

PDF

E-100 STAGE ELECTRICAL LAYOUT-A3.pdf

408.2 KB · Drawing / Plan / Layout

PDF

E-1001 NEW SITE SERVICES LAYOUT-A1.pdf

2.2 MB · Drawing / Plan / Layout

PDF

003P+U - WUP - Preliminary H&S Plan.pdf

11.0 MB · Other

PDF

RMCE Document Issue Register 29-11-23.pdf

302.4 KB · Other

PDF

003-P+U - Watergate Urban Park -Document Register.pdf

51.9 KB · Appendix / Annex

PDF

003-P+U-XX-A-T-3102-R01-Proposed Site Elevations.pdf

1.1 MB

PDF

003-P+U-XX-A-T-5100-R01-Proposed Stage-GA.pdf

2.2 MB

PDF

003-P+U-XX-A-T-5101-R01-Proposed Stage-Architectural Details.pdf

4.9 MB

PDF

003-P+U-XX-A-T-5106-P01-Proposed Canopy-GA & Details.pdf

1.4 MB

PDF

003-P+U-XX-C-T-0000-R01-Civil Notes.pdf

2.2 MB

PDF

003-P+U-XX-E-T-0003-R01-Existing Site Layout-Demolitions.pdf

2.1 MB

PDF

003-P+U-XX-E-T-1000-R01-Proposed Site Layout-General Arrangements.pdf

2.8 MB

PDF

003-P+U-XX-E-T-1001-R01-Proposed Site Layout-Set Out & Levels.pdf

2.4 MB

PDF

003-P+U-XX-E-T-1002-R01-Proposed Site Layout-Sub Structures.pdf

2.2 MB

PDF

003-P+U-XX-E-T-1003-R01-Proposed Site Layout-Super Structures.pdf

2.6 MB

PDF

003-P+U-XX-E-T-1005-R01-Proposed Site Layout-Drainage & Water Services.pdf

2.0 MB

PDF

003-P+U-XX-E-T-1006-R01-Proposed Site Layout-Utilities.pdf

1.9 MB

PDF

003-P+U-XX-E-T-1007-R01-Proposed Boundaries & interfaces.pdf

2.3 MB

PDF

003-P+U-XX-E-T-3100-R01-Proposed Site Sections-Sheet 1 of 2.pdf

2.4 MB

PDF

003-P+U-XX-E-T-3101-R01-Proposed Site Sections-Sheet 2 of 2.pdf

1.9 MB

PDF

003-P+U-XX-E-T-5102-R01-Proposed Stage-Structural.pdf

1.3 MB

PDF

003-P+U-XX-E-T-5103-R01-Proposed Stage Structural Details.pdf

1.4 MB

PDF

003-P+U-XX-E-T-5107-R01-Proposed Canopy-Structural.pdf

1.5 MB

PDF

003-P+U-XX-E-T-5108-P01-Proposed Benches & Seating Sheet 1 of 4.pdf

1.3 MB

PDF

003-P+U-XX-E-T-5109-P01-Proposed Benches & Seating Sheet 2 of 4.pdf

1.3 MB

PDF

003-P+U-XX-E-T-5112-R01-Proposed Boundary-Structural.pdf

1.1 MB

PDF

003-P+U-XX-E-T-5113-R01-Proposed Hydraulic Lift Frame-Structures.pdf

1.1 MB

PDF

003-P+U-XX-E-T-5120-R01-Drainage & Water Service Details.pdf

1.2 MB

PDF

003-P+U-XX-E-T-5121-R01-Drainage & Water Service Details-Sheet 2 of 2.pdf

1.9 MB

PDF

003-P+U-XX-E-T-5122-R01-Prosed Details-Utilities.pdf

1.3 MB

PDF

003-P+U-XX-E-T-5123-R01-Proposed General Details Sheet 1 of 2.pdf

1.5 MB

PDF

003-P+U-XX-E-T-5123A-R01-Proposed General Details Sheet 2 of 2.pdf

790.3 KB

PDF

003-P+U-XX-L-T-0000-R01-Landscape Notes.pdf

1.3 MB

PDF

003-P+U-XX-L-T-5125-R01-Proposed Details-Landscaping & Paving.pdf

2.4 MB

PDF

003-P+U-XX-S-T-0000-R01-Structural Notes.pdf

1.6 MB

PDF

003P+U - WUP - Vol A2.2 - C& S Specification.pdf

2.5 MB

XLSX

Electrical Pricing Document.xlsx

24.8 KB

DOC

ITTW4_Invitation_to_Tender.doc

31.5 KB

XLSX

Note for Use of MS Excel File.xlsx

22.5 KB

PDF

Planners Report.pdf

169.6 KB

DOCX

QW2-Appendix-D.docx

15.4 KB · Appendix / Annex

DOCX

QW2-Appendix-E.docx

20.6 KB · Appendix / Annex

DOCX

QW2-Appendix-F.docx

19.4 KB · Appendix / Annex

DOCX

QW2-Appendix-G.docx

15.4 KB · Appendix / Annex

DOC

QW2_Appendix_A1.doc

30.5 KB

DOC

QW2_Appendix_A2.doc

38.5 KB

DOC

QW2_Appendix_B1.doc

69.0 KB

DOC

QW2_Appendix_B2.doc

47.0 KB

DOC

QW2_Appendix_B3.doc

50.5 KB

DOC

QW2_Appendix_C1.doc

46.0 KB

DOC

QW2_Appendix_C2.doc

46.5 KB

DOC

QW2_Appendix_C3.doc

47.0 KB

DOC

QW2_Appendix_C4.doc

47.0 KB

DOC

QW2_Appendix_C5.doc

46.0 KB

DOC

QW2_Appendix_C6.doc

45.0 KB

DOC

QW2_Appendix_H.doc

32.5 KB

DOC

QW2_Appendix_I.doc

30.0 KB

DOC

QW2_Supplement_3.4.1.doc

81.5 KB

DOC

QW2_Supplement_3.4.2.doc

95.5 KB

PDF

W0982 - Volume C - Schedule of Rates.pdf

515.8 KB

XLSX

W0982 - Watergate SOR.xlsx

131.1 KB

Original notice text

This tender involves the construction and operational management of Watergate Urban Park, including site preparation, service connections, and compliance with safety regulations.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

12 Jan

View on eTenders ↗

Location

Watergate Urban Park, Parliament Street, Kilkenny, Ireland.

Procedure

Open

Clarification

02 Jan 2024

eTenders ID

2803673

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender