← Tenders / ASA2023 - Additional Accommodation at Ballinode College
Awarded Construction & Civil Engineering Works Open

ASA2023 - Additional Accommodation at Ballinode College

Deadline

19 Jan

Tender for additional accommodation at Ballinode College over 5 years

SME fit: Medium Bid effort: Medium 📍 Mayo

Tender for additional accommodation at Ballinode College over 5 years

Bidder profile

Mid-sized to large firms with public-sector tender experience and operational capacity in construction.

Risks & flags

  • Undisclosed contract value
  • Qualification gate narrowing bidder pool
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mayo Sligo and Leitrim ETB
Title ASA2023 - Additional Accommodation at Ballinode College
CPV / category supplies
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 5 years
Submission deadline 2024-01-19T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

Mayo Sligo and Leitrim ETB ran this procurement for “ASA2023 - Additional Accommodation at Ballinode College” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 6 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • HAVE A WATER SUPPLY CAPABLE OF DELIVERING A MINIMUM OF 8 l/s
  • HAVE A WATER SUPPLY CAPABLE OF DELIVERING A MINIMUM OF 20
  • sample with name, catalogue number and services in connection with item
  • Competition the successful Tenderer shall be required to supply its Tax
  • verification of their tax status by the Contracting Authority. By supplying
  • has prior knowledge of their organisation or service provision. Tenderers will
  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • the Contracting Authority’s third party service providers, such as
  • electronic submission to the eTenders platform, Tenderers are advised to
  • system has sufficient capacity to execute the upload of all the documents Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • The Technical Engineer shall have a minimum of 5 years proven experience and history in the
  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • and retention policy, a copy of which can be obtained from the Contracting
  • drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; evel of Professional Indemnity Insurance required for Works Contractor € N/A19 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000.0021 Maximum level of excess for property only
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — 0 28/07/2023 Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category17 € 800,000 CA SUPPLEMENTARY REQUIREMENTS: "N/A"
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 0 28/07/2023 Area of Business/Work: Minimum Average Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category17 € 800,000 CA SUPPLEMENTARY REQUIREMENTS: "N/A"
  • evel of Professional Indemnity Insurance required for Works Contractor € N/A19 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000.0021 Maximum level of excess for property only
  • 0 28/07/2023 Employer’s Liability Insurance Requirements Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000.0022 Entitles issuing employer’s liability in
  • ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
evel of Professional Indemnity Insurance required for Works Contractor € N/A19 T 2% not stated not stated
the amount inserted must not exceed 0 % of the tendered Price. 0% not stated not stated
method-related charges must not exceed 0% of the tendered Price. 0% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • of less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • athered during a site visit carried out on 2nd December 2013
  • [18051 ITT-W4-v1.5-01-08-2023-1.pdf] Instruction to Tenderers
  • [18051 ITT-W4-v1.5-01-08-2023-1.pdf] the
  • [18051 ITT-W4-v1.5-01-08-2023-1.pdf] to this is the obligation upon a Applicant with regard to

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-01-19T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-01-19T16:00:00+00:00
Date surfaced in documents 01 August 2023
Date surfaced in documents 25 May 2018
Date surfaced in documents December 2013

8. Contract terms that matter

Contract duration in the extract: 5 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 11 CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • PIPES SHALL HAVE A MINIMUM PRESSURE CLASSIFICATION
  • Use terminations conforming to the BS EN 61238-1
  • Utilisation category and making capacity to BS EN 60669-1, with earth terminal in enclosure
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
  • the Works within 12 months after the termination, the Contractor’s payment under this clause
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 18051 ITT-W4-v1.5-01-08-2023-1.pdf, Invitation to Tenders.docx, ITT-W4-v1.5-01-08-2023-1.pdf] Instruction to Tenderers.
  • eTenders CFT / notice reference: contract notice for the Works to.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT-W4 v1.5, ITTW4 v1.5 01/08/2023, ITT-W4 V1.5.

This tender has been awarded

Can you bid?

Required certifications

  • BS 5839
  • BS 7671
  • EN 54

Minimum turnover

€800,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (76)

PDF

1514 BALLINODE CC EXTENSION electrical specification and schedules.pdf

536.5 KB · Specification

PDF

1514 BALLINODE CC EXTENSION mechanical specification and schedules.pdf

432.4 KB · Specification

PDF

CHH C&S Specification.pdf

744.2 KB · Specification

PDF

18051 ITT-W4-v1.5-01-08-2023-1.pdf

306.4 KB · RFT / Invitation to Tender

DOCX

Invitation to Tenders.docx

155.2 KB · RFT / Invitation to Tender

PDF

1514 BALLINODE CC EXTENSION electrical pricing document.pdf

457.9 KB · Pricing / BOQ / Schedule of Rates

PDF

1514 BALLINODE CC EXTENSION mechanical pricing document.pdf

182.8 KB · Pricing / BOQ / Schedule of Rates

PDF

18FB71~1.PDF

166.1 KB · Pricing / BOQ / Schedule of Rates

PDF

NOTE.pdf

41.9 KB · Pricing / BOQ / Schedule of Rates

PDF

18051 FTS-6-v1.6-19-07-2023.pdf

234.5 KB · Contract / Agreement / Terms

PDF

18051.A.003 Contractors Site Access & Hoarding.pdf

741.2 KB · Contract / Agreement / Terms

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

53.2 KB · Contract / Agreement / Terms

PDF

PW-CF6-v1.14-19-07-2023.pdf

612.0 KB · Contract / Agreement / Terms

PDF

1514 pre tender risk assesment october 2020.pdf

39.3 KB · Form / Declaration / Certificate

PDF

1514 Pre Tender Risk Assesment.pdf

40.3 KB · Form / Declaration / Certificate

PDF

18051 Ballinode-AF_1_form.pdf

382.4 KB · Form / Declaration / Certificate

PDF

18051 QW2-Part-1-v2.0-28-07-2023-1.pdf

600.1 KB · Form / Declaration / Certificate

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

49.0 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

43.0 KB · Form / Declaration / Certificate

PDF

CHH Design Risk Assessment.20-065.pdf

277.2 KB · Form / Declaration / Certificate

PDF

CHH Design Risk Assessment.pdf

217.9 KB · Form / Declaration / Certificate

PDF

QW-Part-2-v1.0-28-07-2023-2.pdf

286.3 KB · Form / Declaration / Certificate

PDF

1514-20-E101.pdf

322.8 KB · Drawing / Plan / Layout

PDF

1514-20-E201.pdf

540.7 KB · Drawing / Plan / Layout

PDF

1514-20-E202.pdf

259.0 KB · Drawing / Plan / Layout

PDF

1514-20-E301.pdf

365.9 KB · Drawing / Plan / Layout

PDF

1514-20-M101.pdf

805.1 KB · Drawing / Plan / Layout

PDF

1514-20-M201.pdf

297.1 KB · Drawing / Plan / Layout

PDF

1514-20-M301.pdf

288.0 KB · Drawing / Plan / Layout

PDF

18051 Tender Issue Sheet.pdf

134.9 KB · Drawing / Plan / Layout

PDF

18051.A.001 Site Location Map.pdf

260.3 KB · Drawing / Plan / Layout

PDF

18051.A.002 Existing Site Layout Plan & Demolition Works.pdf

910.9 KB · Drawing / Plan / Layout

PDF

18051.A.004 Proposed Site Layout.pdf

909.2 KB · Drawing / Plan / Layout

PDF

18051.A.100 Existing Ground Floor Plan.pdf

374.9 KB · Drawing / Plan / Layout

PDF

18051.A.101 Existing First Floor Plan.pdf

341.1 KB · Drawing / Plan / Layout

PDF

18051.A.102 Proposed Ground Floor Plan.pdf

673.1 KB · Drawing / Plan / Layout

PDF

18051.A.103 Proposed Ground Floor Plan - 1_50.pdf

594.3 KB · Drawing / Plan / Layout

PDF

18051.A.200 Existng Elevations.pdf

389.6 KB · Drawing / Plan / Layout

PDF

18051.A.201 Elevations.pdf

930.5 KB · Drawing / Plan / Layout

PDF

18051.A.300 Existing Building Section.pdf

221.8 KB · Drawing / Plan / Layout

PDF

18051.A.301 Sections AA & BB.pdf

685.1 KB · Drawing / Plan / Layout

PDF

18051.A.302 Detail 1, Roof Plan & Section CC.pdf

703.5 KB · Drawing / Plan / Layout

PDF

18051.A.400 Window & Door Schedule, Elevation Cladding Detail.pdf

439.5 KB · Drawing / Plan / Layout

PDF

18051.A.500 Building Details 2 - 7.pdf

565.5 KB · Drawing / Plan / Layout

PDF

18051.A.600 Floor Finishes & Ceiling Plans.pdf

558.3 KB · Drawing / Plan / Layout

PDF

18051.A.700 Room Elevations.pdf

579.2 KB · Drawing / Plan / Layout

PDF

20-065-C-01.pdf

381.2 KB · Drawing / Plan / Layout

PDF

20-065-C-02-01.pdf

331.3 KB · Drawing / Plan / Layout

PDF

20-065-C-02.pdf

428.6 KB · Drawing / Plan / Layout

PDF

20-065-C-03-01.pdf

282.2 KB · Drawing / Plan / Layout

PDF

20-065-C-03.pdf

377.1 KB · Drawing / Plan / Layout

PDF

20-065-C-10.pdf

653.5 KB · Drawing / Plan / Layout

PDF

20-065-C-11.pdf

1.8 MB · Drawing / Plan / Layout

PDF

20-065-C-12.pdf

650.6 KB · Drawing / Plan / Layout

PDF

20-065-S-01.pdf

228.3 KB · Drawing / Plan / Layout

PDF

20-065-S-02.pdf

375.4 KB · Drawing / Plan / Layout

PDF

20-065-S-03.pdf

224.7 KB · Drawing / Plan / Layout

PDF

20-065-S-04.pdf

159.0 KB · Drawing / Plan / Layout

PDF

CHH Issue Sheet Prj No.20-065.pdf

712.9 KB · Drawing / Plan / Layout

PDF

18051 - Ballinode Prelim H&S Plan.pdf

408.6 KB · Other

PDF

18051 Architect DRA_Stage 1-2a.pdf

727.9 KB · Other

PDF

72360M Ballinode - Asbestos Report 2007.pdf

274.8 KB · Other

PDF

18051A~2.PDF

136.8 KB

PDF

18051A~4.PDF

148.5 KB

PDF

200722 Email 1 from PH re-trial hole.pdf

1.1 MB · Clarification / Addendum

PDF

200722 Email 2 from PH re-trial hole.pdf

1.1 MB · Clarification / Addendum

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

36.5 KB · Appendix / Annex

DOCX

Appendix-C-Bankers-Letter.docx

35.1 KB · Appendix / Annex

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

32.0 KB · Appendix / Annex

PDF

BALLINODE COMMUNITY COLLEGE VOLUME C APRIL 2022.pdf

15.5 MB

PDF

BALLINODE COMMUNITY COLLEGE VOLUME C JANUARY 2024.pdf

15.3 MB

XLS

Ballinode SOR April 2022.xls

187.0 KB

XLS

Ballinode SOR DECEMBER 2023.xls

159.5 KB

PDF

BALLIN~1.PDF

15.6 MB

XLS

BALLIN~1.XLS

187.0 KB

PDF

Survey November 2005.pdf

2.6 MB

Original notice text

This tender involves the provision of additional accommodation at Ballinode College, requiring building, integration, and operational services with compliance reporting.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

19 Jan

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

17 Dec 2023

eTenders ID

2758262

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender