Contract with Options for Electrical Installation Upgrade Works at Beaumont Hospital
Value
€3.0m
Deadline
06 Dec
06 Dec 2023
Value
€3.0m
Deadline
06 Dec
Electrical installation upgrade works at Beaumont Hospital with options.
Electrical installation upgrade works at Beaumont Hospital with options.
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in electrical services.
Risks & flags
- Qualification gate
- Two-step process
- Technical ambiguity at qualification stage
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Beaumont Hospital_403 |
| Title | Contract with Options for Electrical Installation Upgrade Works at Beaumont Hospital |
| CPV / category | works |
| Estimated value | 3000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 6 months |
| Submission deadline | 2023-12-06T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Beaumont Hospital_403 ran this procurement for “Contract with Options for Electrical Installation Upgrade Works at Beaumont Hospital” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- EN 50172 : 2004 Emergency Escape Lighting Systems
- 1 As a result of the introduction of the new electronic Relevant Contracts tax (e-RCT) system by the
- existing services or working hours, statutory consents and conditions attached thereto.
- not construction operations subject to Relevant Contracts Tax (and therefore Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- existing services or working hours, statutory consents and conditions attached thereto.
- refundable to all tenderers that submit bona fide tenders that are not
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; 3 Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10; 4 public liability (property damage) €6,500 10
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- 3 Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10
- 4 public liability (property damage) €6,500 10
- 4 employer’s liability €6,500 12
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- [Instructions to Tenderers.pdf] Instruction to Tenderers
- [Instructions to Tenderers.pdf] documents must not be used for any other purpose.
- [Instructions to Tenderers.pdf] has been entered by issue of a Tender
- [Instructions to Tenderers.pdf] subcontractors, have or have had any other
- The Employer has sent a contract notice for the Works to etenders.2 These
- [Instructions to Tenderers.pdf] Open Procedure for Works Contractors using the Short Public Works Contract
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2023-12-06T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2023-12-06T12:00:00+00:00 |
| Date surfaced in documents | 27 January 2014 |
| Date surfaced in documents | January 2014 |
| Date surfaced in documents | Acts 1997 |
8. Contract terms that matter
Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
- the Works within 12 months after the termination, the Contractor’s payment under this clause
- e Schedule says that a performance bond is required, within 7 days after the Employer sends
- When a payment is to be made, not later than 5 days after the date agreed between the
- Within 14 days of receiving the payment claim notice,
- n to put in place arrangements to complete the Works within 6 months after the termination, the Employer’s R
- the Works within 12 months after the termination, the Contractor’s
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Instructions to Tenderers.pdf, Schedule says that a performance bond is required, within 7 days after the Employer send, Schedule must be provided with.
- eTenders CFT / notice reference: contract notice for the Works to etenders.2 These.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITTW4 v1.2 27/01/2014, ITT-W4 V1.2, Schedules, Award Criteria and Conditions of Contract.
This tender has been awarded
- CJK Engineering · 18 Jul 2025
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Technical Expertise
Technical Merit of Proposed Resources
Health and Safety Record
Quality Assurance and Regulatory Compliance
Lots (1)
Medium voltage electrical projects including switchboard upgrades, transformer installations, and compliance with healthcare facility standards.
Documents (24)
BHT-IN2-ZZ-ZZ-SP-E-0001.pdf
1.9 MB · Specification
Instructions to Tenderers.pdf
708.3 KB · RFT / Invitation to Tender
Pricing Schedule.pdf
171.8 KB · Pricing / BOQ / Schedule of Rates
PW-CF6.pdf
612.0 KB · Contract / Agreement / Terms
Form of Tender and Schedule 1.docx
36.9 KB · Form / Declaration / Certificate
BHT-IN2-12-00-DR-E-0001.pdf
353.0 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-0901.pdf
383.4 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-1001.pdf
285.0 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-1170.pdf
293.3 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-2001.pdf
148.4 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-4001.pdf
354.3 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-7001.pdf
582.7 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-7201.pdf
409.3 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-E-9001.pdf
538.2 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-M-2001.pdf
90.8 KB · Drawing / Plan / Layout
BHT-IN2-12-00-DR-ME-2002.pdf
200.2 KB · Drawing / Plan / Layout
BHT-IN2-ZZ-ZZ-SC-E-01.pdf
46.9 KB · Drawing / Plan / Layout
BHT-IN2-ZZ-ZZ-SC-E-7804.pdf
404.5 KB · Drawing / Plan / Layout
BMT-IN2-12-00-DR-E-1171.pdf
625.9 KB · Drawing / Plan / Layout
12.QW2-Appendix-D -.docx
16.0 KB · Appendix / Annex
13.QW2-Appendix-E -.docx
20.9 KB · Appendix / Annex
14.QW2-Appendix-F -.docx
20.0 KB · Appendix / Annex
15.QW2-Appendix-G.docx
16.0 KB · Appendix / Annex
Award Criteria TO BE ADDRESSED.docx
27.3 KB · Tender Response Template
Original notice text
This tender involves electrical installation upgrade works at Beaumont Hospital, requiring compliance with specific standards and operational execution within a 6-month timeframe.
AI analysis updated 4 months ago
Value
€3.0m
Deadline
06 Dec
Buyer
Beaumont HospitalLocation
Ireland
Procedure
Open
Clarification
01 Dec 2023
eTenders ID
2771753
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender