← Tenders / Mallow Swimming Pool Upgrade Main Contract
Awarded Construction & Civil Engineering Works SME Suitable Open

Mallow Swimming Pool Upgrade Main Contract

Value

€3.0m

Deadline

09 Jan

Upgrade of Mallow Swimming Pool by Cork County Council over 28 months

SME fit: Medium Bid effort: Medium 📍 Cork

Upgrade of Mallow Swimming Pool by Cork County Council over 28 months

Bidder profile

Mid-sized to large firms with public-sector tender experience and financial capacity.

Risks & flags

  • Qualification gate
  • Two-step process
  • Technical ambiguity

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Cork County Council
Title Mallow Swimming Pool Upgrade Main Contract
CPV / category works
Estimated value 3000000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 28 Month
Submission deadline 2024-01-09T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Cork County Council ran this procurement for “Mallow Swimming Pool Upgrade Main Contract” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • of works or services described in Section 2.6.1 of the Project
  • Common Procurement Vocabulary is a single classification system
  • Term Maintenance and Refurbishment Contract.
  • Means a QW3(a) (Works Specialist) and/or QC1 (Service Provider)
  • or services to which those educational or professional qualifications or professional experiences
  • Council of 23 June 2022 on the access of third-country economic operators, goods and services to the
  • Union’s public procurement and concession markets and procedures supporting negotiations on access of
  • Union economic operators, goods and services to the public procurement and concession markets of third
  • 6 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • undertake the areas of specialist works and/or services (“specialist areas”) described in Section 2.7.1 of
  • any time (for example, prior to shortlisting), request supporting documentation substantiating any
  • declaration made in respect of any or all such Qualification Criteria. Supporting documents must Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • oat of adhesive to dry background in areas of approximately 1 m²
  • loated coat of adhesive to dry background in areas of about 1 m²
  • combine with the purpose of delivering a single objective.
  • Tenderers may use an existing eESPD, provided however that their circumstances have not changed since

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; mum level of Professional Indemnity Insurance required for Works Contractor € NA18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; aim here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — 0 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category16 € €5million CA Note: if stating a minimum yearly t
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • 0 28/07/2023 Turnover Requirement Area of Business/Work: Minimum Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category16 € €5million CA Note: if stating a minimum yearly t
  • mum level of Professional Indemnity Insurance required for Works Contractor € NA18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • aim here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6.5 Million20 Maximum level of excess for property
  • Employer’s Liability Insurance Requirements Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13 Million21 Entitles issuing employer’s liabil

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
mum level of Professional Indemnity Insurance required for Works Contractor € NA 2% not stated not stated
aim here: Maximum permissible excess on Professional Indemnity Insurance in any 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • (b) Works outside the boundary of the site whereby 3 days notice will be required to be submitted
  • SPARE PARTS: Within 4 weeks of request submit to the
  • [SAQ - QW2 - Main Contractor.pdf] Suitability Assessment Questionnaire
  • Suitability Assessment Questionnaire
  • QW2: Suitability Assessment Questionnaire – OpWorks Contractors or Reserved Specialists
  • Acronyms or capitalised terms used throughout this Questionnaire are defined in this glossary.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2024-01-09T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2024-01-09T12:00:00+00:00
Date surfaced in documents 28 July 2023
Date surfaced in documents 23 June 2022
Date surfaced in documents Nov 2023

8. Contract terms that matter

Contract duration in the extract: 28 Month. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • Minimum amount for interim payments, except release of retention, € 30,000
  • at a minimum of 300mm above the crown of the pipeline
  • each week a daily return of the number and description of
  • Acronyms or capitalised terms used throughout this Questionnaire are defined in this glossary.
  • Other Capitalised terms (that are not defined below) are defined in the particular Form of Contract
  • The term is used for an individual (sole) trader, a single entity, or a
  • Consortium, a Joint Venture or a Partnership seeking to be

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: SAQ - QW2 - Main Contractor.pdf, Letter of Invitation - Main Contractor.pdf, FTS-1-MallowPoolMainContract.docx.
  • eTenders CFT / notice reference: OJEU.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix A, as stated in the Project, Appendix A, as stated in the Project Particulars; and, Appendix A - Self Declaration in relation to Regulation 57.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€5,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€3,000,000

Scoring

Most Economically Advantageous Tender

Documents (108)

PDF

22086-Wall and Floor Tiling Specification-2023-11-07.pdf

366.4 KB · Specification

PDF

JODA_4583_wind Load Extension.pdf

434.5 KB · Specification

PDF

JODA_4583_Wind Load Plant Room.pdf

445.0 KB · Specification

PDF

JODA_4583_Wind Loads Main Building.pdf

447.8 KB · Specification

PDF

Mallow Swimming Pool Scope of Works.pdf

403.2 KB · Specification

PDF

3003 CCC (Mallow S.P. Upgrade) - Pricing Document - Preliminaries (Uploaded 2023.11.09).pdf

1.2 MB · Pricing / BOQ / Schedule of Rates

PDF

4583-118 SITE RESTRICTIONS, CONTRACTORS COMPOUND-.pdf

675.2 KB · Contract / Agreement / Terms

DOCX

FTS-1-MallowPoolMainContract.docx

111.2 KB · Contract / Agreement / Terms

PDF

ITT- W2 - Main Contractor.pdf

861.0 KB · Contract / Agreement / Terms

PDF

Letter of Invitation - Main Contractor.pdf

712.3 KB · Contract / Agreement / Terms

PDF

SAQ - QW2 - Main Contractor.pdf

1.4 MB · Contract / Agreement / Terms

PDF

4008016 GRANT.pdf

296.5 KB · Form / Declaration / Certificate

PDF

AF1 - Mallow Swimming Pool Upgrade.pdf

35.5 KB · Form / Declaration / Certificate

PDF

FSC - Report - Rev A.pdf

421.4 KB · Form / Declaration / Certificate

PDF

FSC2302712CC-Grant with conditions.pdf

115.5 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.0-28-07-2023-2.docx

69.7 KB · Form / Declaration / Certificate

PDF

1968-TCD-2700-0002_3.pdf

90.3 KB · Drawing / Plan / Layout

PDF

1968-TCD-500-1021_0.pdf

656.4 KB · Drawing / Plan / Layout

PDF

1968-TCD-5500-0001_1.pdf

286.0 KB · Drawing / Plan / Layout

PDF

22086_ Issue Sheet.pdf

630.2 KB · Drawing / Plan / Layout

PDF

4583- Tender.pdf

66.1 KB · Drawing / Plan / Layout

PDF

4583-100 (Existing Foundation).pdf

495.6 KB · Drawing / Plan / Layout

PDF

4583-101 (Existing GF).pdf

477.9 KB · Drawing / Plan / Layout

PDF

4583-102 (Existing Internal and External Drainage Layout).pdf

538.5 KB · Drawing / Plan / Layout

PDF

4583-103 (Existing Site Drainage).pdf

267.1 KB · Drawing / Plan / Layout

PDF

4583-104 (External Drainage Survey).pdf

284.8 KB · Drawing / Plan / Layout

PDF

4583-105 (Topographic Survey).pdf

669.8 KB · Drawing / Plan / Layout

PDF

4583-106 (Utilities Survey).pdf

305.9 KB · Drawing / Plan / Layout

PDF

4583-107 (New internal drainage and external modifications).pdf

543.6 KB · Drawing / Plan / Layout

PDF

4583-108 (Demolition).pdf

453.2 KB · Drawing / Plan / Layout

PDF

4583-109 (Proposed Foundation).pdf

546.4 KB · Drawing / Plan / Layout

PDF

4583-110 (Proposed Roof).pdf

452.0 KB · Drawing / Plan / Layout

PDF

4583-111 (Proposed GF).pdf

694.5 KB · Drawing / Plan / Layout

PDF

4583-112 (Proposed Levels).pdf

429.4 KB · Drawing / Plan / Layout

PDF

4583-113 (Proposed Beams and Columns).pdf

448.9 KB · Drawing / Plan / Layout

PDF

4583-114 (Rebar Schedule) BBS.pdf

181.9 KB · Drawing / Plan / Layout

PDF

4583-114 (Rebar Schedule) WR.pdf

87.1 KB · Drawing / Plan / Layout

PDF

4583-114 (Rebar Schedule).pdf

482.7 KB · Drawing / Plan / Layout

PDF

4583-115 (External Works).pdf

417.4 KB · Drawing / Plan / Layout

PDF

4583-116 (Roof Steelwork).pdf

463.1 KB · Drawing / Plan / Layout

PDF

4583-117 - External resurfacing Works-.pdf

675.1 KB · Drawing / Plan / Layout

PDF

4583-119 (Roof Fall Arrest).pdf

440.2 KB · Drawing / Plan / Layout

PDF

AR_003.pdf

1.3 MB · Drawing / Plan / Layout

PDF

AR_102.pdf

691.2 KB · Drawing / Plan / Layout

PDF

AR_103.pdf

1.1 MB · Drawing / Plan / Layout

PDF

AR_201.pdf

688.5 KB · Drawing / Plan / Layout

PDF

AR_716.pdf

529.1 KB · Drawing / Plan / Layout

PDF

AR_717.pdf

985.4 KB · Drawing / Plan / Layout

PDF

AR_800.pdf

522.6 KB · Drawing / Plan / Layout

PDF

DAC - Elevations & Sections (A1) - Rev A.pdf

620.1 KB · Drawing / Plan / Layout

PDF

DAC - Existing Plan (A2).pdf

303.7 KB · Drawing / Plan / Layout

PDF

DAC - Proposed Plan (A1) - Rev A.pdf

333.3 KB · Drawing / Plan / Layout

PDF

DAC - Site Layout (A1) - Rev A.pdf

995.6 KB · Drawing / Plan / Layout

PDF

FSC - BCF Calculation Plan (A3).pdf

184.6 KB · Drawing / Plan / Layout

PDF

FSC - Elevations & Sections (A1) - Rev A.pdf

603.6 KB · Drawing / Plan / Layout

PDF

FSC - Existing Plan (A2) - Rev A.pdf

305.9 KB · Drawing / Plan / Layout

PDF

FSC - Proposed Plan (A1) - Rev A.pdf

545.5 KB · Drawing / Plan / Layout

PDF

FSC - Site Layout (A1) - Rev A.pdf

1.1 MB · Drawing / Plan / Layout

OTHER

plot.log

5.9 KB · Drawing / Plan / Layout

PDF

Site Location (A3).pdf

979.3 KB · Drawing / Plan / Layout

ZIP

Survey Images.zip

17.2 MB · Drawing / Plan / Layout

PDF

SW22150-LA.pdf

163.6 KB · Drawing / Plan / Layout

PDF

230621 - Mallow Swimming Pool Refurbishment Works - Prelim Plan_Stage 2B.pdf

2.3 MB · Other

PDF

230830 - Mallow Swimming Pool Refurbishment Works - Prelim Plan_Rev Tender.pdf

2.9 MB · Other

PDF

AR_601.pdf

1.0 MB · Other

PDF

DAC - Report - Rev A.pdf

363.7 KB · Other

PDF

1968-TCD-1100-1001_1.pdf

411.2 KB

PDF

1968-TCD-1100-1101_0.pdf

158.5 KB

PDF

1968-TCD-2700-1001_1.pdf

1.8 MB

PDF

1968-TCD-500-0001_0.pdf

2.0 MB

PDF

1968-TCD-500-0002_1.pdf

229.7 KB

PDF

1968-TCD-500-0003_2.pdf

197.2 KB

PDF

1968-TCD-500-0006_2.pdf

329.0 KB

PDF

1968-TCD-500-0012_1.pdf

205.3 KB

PDF

1968-TCD-500-0020_1.pdf

145.7 KB

PDF

1968-TCD-500-1002_0.pdf

126.6 KB

PDF

1968-TCD-5700-1001_2.pdf

457.0 KB

PDF

3003 CCC (Mallow S.P. Upgrade) - Pricing Document - Measured Works (Uploaded 2023.11.09).pdf

2.5 MB

XLS

3003 CCC (Mallow S.P. Upgrade) - Pricing Document - Measured Works (Uploaded 2023.11.09).XLS

825.5 KB

PDF

4583-JODA-Substation and Switchroom.pdf

278.7 KB

PDF

Additional Info - 31st August 2023.pdf

518.1 KB · Clarification / Addendum

PDF

Additional Info - 31st May 2023.pdf

512.8 KB · Clarification / Addendum

PDF

AR_100.pdf

5.5 MB

PDF

AR_300.pdf

1.2 MB

PDF

AR_500.pdf

3.9 MB

PDF

AR_502.pdf

1.5 MB

PDF

AR_600.pdf

2.0 MB

PDF

AR_602.pdf

311.5 KB

PDF

AR_604.pdf

436.9 KB

PDF

AR_605.pdf

294.4 KB

PDF

AR_607.pdf

3.6 MB

PDF

AR_608.pdf

630.6 KB

PDF

AR_700.pdf

690.9 KB

PDF

AR_702.pdf

449.2 KB

PDF

AR_703.pdf

495.0 KB

PDF

AR_704.pdf

976.1 KB

PDF

AR_705.pdf

744.4 KB

PDF

AR_706.pdf

417.0 KB

PDF

AR_707.pdf

941.0 KB

PDF

AR_708.pdf

535.7 KB

PDF

AR_709.pdf

441.1 KB

PDF

AR_710.pdf

454.3 KB

PDF

AR_711.pdf

592.0 KB

PDF

AR_712.pdf

517.7 KB

PDF

AR_715.pdf

711.9 KB

PDF

Cavity Barriers.pdf

815.4 KB · Clarification / Addendum

PDF

ESB Substation.pdf

19.5 MB

PDF

JODA_4583_Mallow Swimming Pool Upgrade CS Specification.pdf

2.1 MB

Original notice text

Cork County Council seeks contractors for the Mallow Swimming Pool Upgrade, focusing on construction and operational service execution over a 28-month period.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€3.0m

Deadline

09 Jan

View on eTenders ↗

Location

Mallow Swimming Pool, Cork, Ireland

Procedure

Open

Clarification

01 Dec 2023

eTenders ID

2679001

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender