Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Lighting Replacement Works - Páirc Gnó Ghaoth Dobhair
Awarded Building Services & Maintenance Works Open

Lighting Replacement Works - Páirc Gnó Ghaoth Dobhair

Deadline

18 Dec

Lighting replacement works for Páirc Gnó Ghaoth Dobhair over 3 years

SME fit: Medium Bid effort: Medium 📍 Donegal

Lighting replacement works for Páirc Gnó Ghaoth Dobhair over 3 years

Bidder profile

Mid-sized to large firms with experience in public sector tenders and operational service delivery.

Risks & flags

  • Undisclosed contract value
  • Qualification gate turnover threshold
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Údarás Na Gaeltachta_289
Title Lighting Replacement Works - Páirc Gnó Ghaoth Dobhair
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 3 years
Submission deadline 2023-12-18T13:00:00+00:00
Go-live / start not stated

2. Scope of Work

Údarás Na Gaeltachta_289 ran this procurement for “Lighting Replacement Works - Páirc Gnó Ghaoth Dobhair” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Competition the successful Tenderer shall be required to supply its Tax
  • verification of their tax status by the Contracting Authority. By supplying
  • has prior knowledge of their organisation or service
  • has prior knowledge of their organisation or service provision. Tenderers will
  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • the Contracting Authority’s third party service providers, such as
  • electronic submission to the eTenders platform, Tenderers are advised to
  • system has sufficient capacity to execute the upload of all the documents
  • drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • information on the site location, any constraints such as existing services or working hours, statutory consents and
  • and retention policy, a copy of which can be obtained from the Contracting
  • drawings, specifications, schedules, reports, information on the site location, any constraints such as existing services or
  • will be refundable to all Tenderers that submit bona fide Tenders that are

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 1,500,000[18] The excess as st; ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • PersonnelTurnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[16] € 750,000 CA SUPPLEMENTARY REQUIREMENTS: CA
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[16] € 750,000 CA SUPPLEMENTARY REQUIREMENTS: CA
  • The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € 1,500,000[18] The excess as st
  • ated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate
  • Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[20] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect
  • Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[21] Entitles issuing

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
ated here: Maximum permissible excess on Professional Indemnity In 2% not stated not stated
e in any one claim below which the will bear the cost is the greater amount of 2 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • of less than €250,000. Projects in excess of €200,000 must be advertised on eTenders
  • As a minimum requirement, Applicants must demonstrate that they have successfully completed at least 3 projects of similar scale, nature and complexity by submitting project reference sheets on attached Appendix B2 forms
  • [ITTW4_Invitation_to_Tender.pdf] ITT-W4 V1.0 23/04/2013
  • You are invited to submit a Tender for the above Contract complying with the
  • (ITTW4) should be included with the contract notice published on eTenders and where

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2023-12-18T13:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2023-12-18T13:00:00+00:00
Date surfaced in documents 01 August 2023
Date surfaced in documents 25 May 2018
Date surfaced in documents Open 1500

8. Contract terms that matter

Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • In the case of unlugged terminations a minimum of two
  • dip galvanising after manufacturing to BS EN 1461:2009
  • A 375mm pipe is installed as the fitting chamber for
  • e Tenderer’s current principal banker dated within the past 3 months stating the duration of the relationshi
  • cation, we expect that insurance cover can be issued within 4 weeks of the receipt by us of the relevant ap
  • ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: ITTW4_Invitation_to_Tender.pdf, ITT-W4-v1.5-01-08-2023.pdf, ~$424 - Enabling Works Vol A1.docx.
  • eTenders CFT / notice reference: contract notice published on eTenders and where.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix B2 forms, ITTW4_Invitation_to_Tender.pdf] ITT-W4 V1.0 23/04/2013, ITTW4) should be included with the contract notice published on eTenders and where.

This tender has been awarded

Can you bid?

Required certifications

  • BS 5228
  • BS 6187

Minimum turnover

€750,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Lowest Price

Documents (41)

PDF

11424 - Enabling Works Vol A1.pdf

587.5 KB · Specification

PDF

PL2344 Lighting & Power Specification.pdf

205.0 KB · Specification

PDF

ITT-W4-v1.5-01-08-2023.pdf

329.7 KB · RFT / Invitation to Tender

PDF

ITTW4_Invitation_to_Tender.pdf

89.0 KB · RFT / Invitation to Tender

PDF

11424- Volume C Pricing Document.pdf

301.3 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

51.5 KB · Contract / Agreement / Terms

PDF

FTS-6-v1.6-19-07-2023-1.pdf

160.8 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

45.3 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

37.8 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

Appendix-E-Declaration-in-relation-to-Russian-Sanctions.docx

24.0 KB · Form / Declaration / Certificate

DOCX

Appendix-F-Declaration-re-International-Procurement-Instrument.docx

22.9 KB · Form / Declaration / Certificate

DOCX

QW2-Part-1-v2.0-28-07-2023 (2).docx

192.0 KB · Form / Declaration / Certificate

PDF

11424-6100_T0 - Site Location Map.pdf

381.7 KB · Drawing / Plan / Layout

PDF

11424-6101_T0 - Existing Lighting Layout and Services Sheet 1 of 2.pdf

807.6 KB · Drawing / Plan / Layout

PDF

11424-6102_T0 - Existing Lighting Layout and Services Sheet 2 of 2.pdf

783.9 KB · Drawing / Plan / Layout

PDF

11424-6103_T0 -Proposed Trenching Layout Sheet 1 of 7.pdf

795.5 KB · Drawing / Plan / Layout

PDF

11424-6104_T0 -Proposed Trenching Layout Sheet 2 of 7.pdf

851.0 KB · Drawing / Plan / Layout

PDF

11424-6105_T0 -Proposed Trenching Layout Sheet 3 of 7.pdf

698.5 KB · Drawing / Plan / Layout

PDF

11424-6106_T0 - Proposed Trenching Layout Sheet 4 of 7.pdf

960.1 KB · Drawing / Plan / Layout

PDF

11424-6107_T0 -Proposed Trenching Layout Sheet 5 of 7.pdf

831.0 KB · Drawing / Plan / Layout

PDF

11424-6108_T0 -Proposed Trenching Layout Sheet 6 of 7.pdf

514.3 KB · Drawing / Plan / Layout

PDF

11424-6109_T0 -Proposed Trenching Layout Sheet 7 of 7.pdf

529.7 KB · Drawing / Plan / Layout

PDF

11424-6110_T0 - Site Development Details.pdf

346.7 KB · Drawing / Plan / Layout

PDF

5391 Udaras, Bunbeg_2D_Topo.pdf

45.6 MB · Drawing / Plan / Layout

PDF

5391 Udaras, Bunbeg_UG_ITM15_200.pdf

14.6 MB · Drawing / Plan / Layout

PDF

5391_esb.pdf

906.4 KB · Drawing / Plan / Layout

PDF

PL2344-E-100-C1.pdf

3.4 MB · Drawing / Plan / Layout

PDF

11424 - Preliminary Health & Safety Plan - Lighting Works.pdf

530.2 KB · Other

PDF

Survey Report for Public Lighting network only for Udaras, Bunbeg Co Donegal R0.pdf

1.7 MB · Other

PDF

11424 - Enabling Works Vol A2 Spec.pdf

2.1 MB

PDF

5391_eir 1.pdf

260.2 KB

PDF

5391_eir 2.pdf

280.6 KB

PDF

5391_gas.pdf

1.7 MB

PDF

5391_vm.pdf

59.0 KB · Clarification / Addendum

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix-C-Bankers-Letter.docx

29.9 KB · Appendix / Annex

DOCX

Appendix-D1-QW1-Letter-of-Undertaking-re.-Bond.docx

33.2 KB · Appendix / Annex

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

26.8 KB · Appendix / Annex

PDF

Existing Watermain Survey - Gaoth Dobhair, Bunbeg_1.pdf

6.1 MB · Appendix / Annex

Original notice text

This tender involves the replacement of lighting systems at Páirc Gnó Ghaoth Dobhair, requiring implementation and ongoing service execution with compliance reporting.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

18 Dec

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

27 Nov 2023

eTenders ID

2676874

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.