Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Ballyhass National School - Construction of extension and underground water storage tanks and all associated site works
Closed Building Services & Maintenance Works Open

Ballyhass National School - Construction of extension and underground water storage tanks and all associated site works

Value

€500k

Deadline

14 Dec

Construction of extension and underground water storage tanks at Ballyhass National School

SME fit: Medium Bid effort: Medium 📍 Cork

Construction of extension and underground water storage tanks at Ballyhass National School

Bidder profile

Mid-sized to large firms with public-sector tender experience and operational capability in construction.

Risks & flags

  • Qualification gate
  • Two-step process
  • Technical granularity
  • Compliance evidence requirement

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Ballyhass National School
Title Ballyhass National School - Construction of extension and underground water storage tanks and all associated site works
CPV / category works
Estimated value 500000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 months
Submission deadline 2023-12-14T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Ballyhass National School ran this procurement for “Ballyhass National School - Construction of extension and underground water storage tanks and all associated site works” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  • to the storage tanks will be capable of supporting a minimum of 12
  • services pipe work shall be copper pipe to BS EN2872
  • high level water services pipe work shall be copper pipe to BS EN2871
    1. School Bell/PA System& Containment
  • 5.1School Bell PA System &Containment
  • 10.3 Minimum indemnity limit for public liability insurance. €13,000,000 for any one event. (Limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.)
  • 4.9 Value-Added Tax The Form of Tender states whether and to what extent, the tendered Price includes value-added tax (VAT). The pricing document (where provided) excludes VAT unless otherwise stated by the contracting authority in the pricing document. If the pricing document (where provided) includes a schedule of items that are not construction operations subject to Relevant Contracts Tax (and therefore to reverse-charge VAT), and, in the Employer’s opinion, the categorisation of an item, the VAT rate stated, or the value stated is not correct, the Employer may invoke Section 6.2. Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • eams-Fire strategy in Schools, 1st Edition February 2014
  • 4.13 Deposits The Deposit required for tender documents as stated in the Particulars will be refundable to all tenderers that submit bona fide tenders that are not subsequently withdrawn. The deposit is to cover the cost incurred by the Contracting Authority in preparing the relevant tender documents.

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; ) Minimum indemnity limit for employer’s liability insurance €6,500,000 for any one event ; 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works €2,500 * public liability €6,500[9] * employer’s liability €6,500[10]
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • ) Minimum indemnity limit for employer’s liability insurance €6,500,000 for any one event
  • 4 Maximum levels of excess for * insurance of the Works and goods and materials for the Works €2,500 * public liability €6,500[9] * employer’s liability €6,500[10]

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
The amount of the performance bond is to be 10%[7] of the P 10% not stated not stated
Percentage of Price to be paid after Employer certifies the Works are substa 95% not stated not stated
12.3 Percentage of the unpaid portion of the Price to be paid if Employer te 4% not stated not stated
[Tender & Schedule - Extension and underground tanks at Ballyhass National Schoo 4% not stated not stated
[Instruction to Tenderers (Short Form Contract).docx] , Tenderers must not inser 0% not stated not stated
[Instruction to Tenderers (Short Form Contract).docx] ities includes method-rela 0% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • procedure may be used for all values of works contracts but must be used for works contracts with a value of less than €250,000. Projects in excess of €50,000 must be advertised on etenders [↑](#footnote-ref
  • 1.1 This procedure The Employer has sent a contract notice for the Works to etenders.[2]2 These documents set out the suitability assessment criteria, the award criterion and the evaluation and award process which will be followed by the Employer in making the assessment of which tender is the lowest price. The documents also set out the information which must be supplied by Applicants. Tenders must be submitted in accordance with these Instructions. Any tenders not complying with these Instructions may be rejected by the Contracting Authority, whose decision in the matter shall be final.
  • 1.2 These documents The following documents are being made available to those Applicants expressing an interest in this project: * Suitability Assessment Questionnaire(s) as follows: * Volume A Works Requirments * Volume B Form of Tender and Schedule * Volume C Pricing Document * Volume D Information Pack * Those documents set out under Section 4.2 ‘Tender Documents’ of these Instructions to Tenderers.
  • [Instruction to Tenderers (Short Form Contract).docx] Volume C Pricing Document * Volume D Information Pack * Those documents set out under Section 4.2 ‘Tender Documents’ of these Instructions to Tenderers.
  • 1.3 The Contract If the Employer enters a Contract for the Works, it will do so by issuing the Tender Acceptance at the back of the Form of Tender fully completed. The Contract, if formed, will consist of: * the Tender Acceptance issued by the Employer (Volume B) and * any written post-tender clarifications (Volume B) * the Conditions to the Short Public Works Contract (PW-CF6) identified in the Particulars[3]3 * the documents describing the Works[4]4 (Volume A) * the completed Form of Tender and Schedule (Volume B) * the completed pricing document[5]5 (Volume C) [where required] None of the following will form part of any Contract: * the invitation letter and these Instructions * Suitability Assessment Questionnaire(s) * the Preliminary Safety and Health Plan * any Bill of Quantities * the information referred to in Appendix 3 to these Instructions * any other information issued to Tenderers not stated to amend the Contract documents * additional information to be submitted with Tenders, as specified in Appendix 2 to these Instructions * any other information submitted with Tenders and not called for in these Instructions or in post tender clarifications.
  • 2.2 Supplemental information The Employer may issue supplemental information about this competition on the e-tenders website www.etenders.gov.ie. Supplemental information may amend any of the information in these documents, including by deleting and adding to it, and by extending time limits. Supplemental information will become part of the Contract only if it is stated to amend the Contract documents. The Employer will not normally issue supplemental information later than the date stated in the Particulars but is entitled to do so at any time.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2023-12-14T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2023-12-14T12:00:00+00:00
Date surfaced in documents 19 July 2023
Date surfaced in documents 7 January 2022
Date surfaced in documents Belden 8723

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • Title: Ballyhass National School - Construction of extension and underground water storage tanks and all associated site works
  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • services pipe work shall be copper pipe to BS EN2872
  • high level water services pipe work shall be copper pipe to BS EN2871
  • within 5m of the principal entrance door
  • rvice pump appliances can get access to within 5m of the principal school entrance
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative will give the above certificate to
  • the Works within 12 months after the termination, the Contractor’s payment under this clause

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — not clearly specified in extract.
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: Tender & Schedule - Extension and underground tanks at Ballyhass National School.docx, Instruction to Tenderers (Short Form Contract).docx, ~$struction to Tenderers (Short Form Contract).docx.
  • eTenders CFT / notice reference: contract notice for the Works to etenders.[2]2 These docume.
  • Clarification contact / portal: [email protected].
  • Key attachments to prioritise: Schedule says that a performance bond is required, within 7 days after the Employer send, Schedule - Extension and underground tanks at Ballyhass National School.docx] for, Schedule - Extension and underground tanks at Ballyhass National School.docx] .

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€13,000,000

Scoring

Most Economically Advantageous Tender

Documents (61)

PDF

23-032 Electrical Particular Specification & Form of Tender.pdf

863.5 KB · Specification

PDF

23-032 Mechanical Particular Specification & Form Of Tender.pdf

1.2 MB · Specification

PDF

Revised DAC specification report.pdf

278.2 KB · Specification

PDF

Specification report.pdf

209.8 KB · Specification

PDF

T22 BH 400.pdf

1002.5 KB · Specification

PDF

T22 BH 401.pdf

862.0 KB · Specification

PDF

T22 BH 501.pdf

182.4 KB · Specification

PDF

Volume A Works Specifications.pdf

404.2 KB · Specification

PDF

T22 BH 700.pdf

717.1 KB · Pricing / BOQ / Schedule of Rates

DOCX

Instruction to Tenderers (Short Form Contract).docx

90.9 KB · Contract / Agreement / Terms

PDF

PW-CF6-v1.14-19-07-2023.pdf

612.0 KB · Contract / Agreement / Terms

DOCX

~$struction to Tenderers (Short Form Contract).docx

162 bytes · Contract / Agreement / Terms

PDF

23-032 E-1 Drawing Register.pdf

252.3 KB · Drawing / Plan / Layout

PDF

23-032 E-200 T1.pdf

397.6 KB · Drawing / Plan / Layout

PDF

23-032 E-201 T1.pdf

95.2 KB · Drawing / Plan / Layout

PDF

23-032 E-300 T1.pdf

452.0 KB · Drawing / Plan / Layout

PDF

23-032 E-500 T1.pdf

157.1 KB · Drawing / Plan / Layout

PDF

23-032 M-200 T1.pdf

89.3 KB · Drawing / Plan / Layout

PDF

23-032 M-400 T1.pdf

78.0 KB · Drawing / Plan / Layout

PDF

FSC 01 site location map.pdf

357.8 KB · Drawing / Plan / Layout

PDF

FSC 04 existing floor plan.pdf

625.4 KB · Drawing / Plan / Layout

PDF

FSC 05 North & South elevation.pdf

586.4 KB · Drawing / Plan / Layout

PDF

FSC 07 proposed section.pdf

569.1 KB · Drawing / Plan / Layout

OTHER

plot.log

6.9 KB · Drawing / Plan / Layout

PDF

Proposed floor plan.pdf

797.8 KB · Drawing / Plan / Layout

PDF

Revised FSC 06 east & west elevation.pdf

597.8 KB · Drawing / Plan / Layout

PDF

Revised FSC 09 north & south elevation compartment 1 & 2.pdf

579.4 KB · Drawing / Plan / Layout

PDF

Revision 2 DAC 03 proposed floor plan.pdf

661.3 KB · Drawing / Plan / Layout

PDF

Site layout.pdf

818.3 KB · Drawing / Plan / Layout

PDF

T21 W 03.pdf

426.6 KB · Drawing / Plan / Layout

PDF

T21 W 04.pdf

214.6 KB · Drawing / Plan / Layout

PDF

T21 W 05.pdf

302.8 KB · Drawing / Plan / Layout

PDF

T22 BH 300.pdf

399.8 KB · Drawing / Plan / Layout

PDF

T22 BH 301.pdf

568.4 KB · Drawing / Plan / Layout

PDF

T22 BH 500.pdf

188.8 KB · Drawing / Plan / Layout

PDF

T22 BH 600.pdf

258.7 KB · Drawing / Plan / Layout

PDF

T22 BH 800.pdf

458.0 KB · Drawing / Plan / Layout

PDF

T22 BH 801.pdf

334.8 KB · Drawing / Plan / Layout

PDF

T22 BH 900.pdf

225.4 KB · Drawing / Plan / Layout

PDF

T22 BH 901.pdf

426.1 KB · Drawing / Plan / Layout

PDF

T22 BH 902.pdf

204.9 KB · Drawing / Plan / Layout

PDF

T22BH09.pdf

115.0 KB · Drawing / Plan / Layout

PDF

T2BH200.pdf

272.7 KB · Drawing / Plan / Layout

PDF

21 04383 Decision to Grant Permission.pdf

119.6 KB · Other

PDF

21 06972 Decision to Grant Permission.pdf

96.1 KB · Other

PDF

CIF-Construction-Sector-C-19-Pandemic-SOP_V11.pdf

894.3 KB · Other

PDF

Code of practice for inspecting and certifying buildings and works.pdf

241.7 KB · Other

PDF

DAC2107306CC-Grant with conditions.pdf

78.2 KB · Other

PDF

FSC2107357CC-Grant with conditions.pdf

73.9 KB · Other

PDF

Preliminary Safety & Health Plan Ballyhass National School May 2022.pdf

2.8 MB · Other

DOC

~$-1.10-09-04-2020.doc

162 bytes · Other

DOC

~$TW4_Invitation_to_Tender.doc

162 bytes · Other

PDF

23-032 M-1 Drawing Register.pdf

21.8 KB

DOC

Declaration of Suitability for Contractors for Small Works - Extension to Ballyhass National School.doc

92.0 KB

PDF

Drawing Issue Sheet - Tender.pdf

91.5 KB

PDF

FSC 1A site location map.pdf

769.3 KB

PDF

HSA COP for Access & Working Scaffolds.pdf

3.3 MB

PDF

Invitation to Tender.pdf

100.4 KB

DOCX

MF-1.11-09-04-2020.docx

46.6 KB · Insurance / Indemnity

DOCX

Tender & Schedule - Extension and underground tanks at Ballyhass National School.docx

56.6 KB · Appendix / Annex

PDF

Volume C Pricing Document Ballyhass NS.pdf

2.1 MB

Original notice text

This tender involves the construction of an extension and underground water storage tanks at Ballyhass National School, including all associated site works over a 12-month period.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€500k

Deadline

14 Dec

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

06 Dec 2023

eTenders ID

2667284

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender