← Tenders / Royal Canal Greenway Maynooth to Confey Main Contract Works (Phase 2)
Awarded Construction & Civil Engineering Works Open

Royal Canal Greenway Maynooth to Confey Main Contract Works (Phase 2)

Deadline

14 Dec

Main contract works for the Royal Canal Greenway project over 2 years

SME fit: Medium Bid effort: Medium 📍 Kildare

Main contract works for the Royal Canal Greenway project over 2 years

Bidder profile

Mid-sized to large firms with experience in public sector projects and a strong compliance framework.

Risks & flags

  • Undisclosed contract value
  • Qualification gate for turnover
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Kildare County Council_385
Title Royal Canal Greenway Maynooth to Confey Main Contract Works (Phase 2)
CPV / category works
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 2 years
Submission deadline 2023-12-14T12:00:00+00:00
Go-live / start not stated

2. Scope of Work

Kildare County Council_385 ran this procurement for “Royal Canal Greenway Maynooth to Confey Main Contract Works (Phase 2)” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • 6 Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • Where the estimated value of the contract is above €5m (Services) and €15m (Works)
  • PUBLIC LIGHTING ACCESS CHAMBER ESB SUPPLY PILLAR
    1. LOCATION OF EXISTING AND PROPOSED SERVICES AS SH
  • 5155640/HTR/SCD/0001 LOCATION OF PROPOSED ESB SUPPLY PILLAR
  • 2.LOCATION OF EXISTING AND PROPOSED SERVICES AS
  • TR/SCD/0001 LOCATION OF PROPOSED ESB SUPPLY PILLAR
  • successful Tenderer shall be required to supply its Tax Clearance Access
  • status by the Contracting Authority. By supplying these numbers the
  • prior knowledge of their organisation or service provision. Tenderers will only be
  • the Contracting Authority’s third party service providers, such as
  • platform. The Contracting Authority may under section 2.2 still issue any Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

    1. LOCATION OF EXISTING AND PROPOSED SERVICES AS SH
  • 2.LOCATION OF EXISTING AND PROPOSED SERVICES AS
  • and retention policy, a copy of which can be obtained from the Contracting

4. Eligibility & selection criteria

  • Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; evel of Professional Indemnity Insurance required for Works Contractor € N/A18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl; Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000.0020 Maximum level of excess for property only
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • PersonnelTurnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: Civil Engineering category[16] € 10,000,000.00 CA SUPPLEMENTARY REQUIREMENTS: N/
  • Geographic / facility constraints — 3g EMPLOYER’S LIABILITY INSURANCE 20 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro) Additional binding lines surfaced in the deterministic extract:
  • — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
  • evel of Professional Indemnity Insurance required for Works Contractor € N/A18 The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Works Contractor will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate cl
  • Public Liability Insurance Requirements Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000.0020 Maximum level of excess for property only
  • 3g EMPLOYER’S LIABILITY INSURANCE 20 If no value entered it shall read as €6,500,000 (six million five hundred thousand euro)
  • Employer’s Liability Insurance Requirements Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000.0021 Entitles successful Tenderer has curren
  • Employer’s Liability Insurance Requirements Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000.0021 Entitles issuing employer’s liability in

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
evel of Professional Indemnity Insurance required for Works Contractor € N/A18 T 2% not stated not stated
Professional Indemnity Insurance required for € N/A[18] The 2% not stated not stated
ere: Minimum level of Professional Indemnity Insurance required for Works Contra 2% not stated not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — not specified in extract.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • 2 This project number must correspond to the project number given in Appendix B1 List of Previous Works projects for which there is a
  • [5155640DG0229 rev 0 - TP3_VolE_ITT.pdf] Royal Canal Greenway - Maynooth
  • [5155640DG0229 rev 0 - TP3_VolE_ITT.pdf] Page 4 of 6
  • [5155640DG0229 rev 0 - TP3_VolE_ITT.pdf] The Contracting Authority makes no representation, warranty, or
  • [5155640DG0229 rev 0 - TP3_VolE_ITT.pdf] irrevocable offer to be bound by its Tender for

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2023-12-14T12:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2023-12-14T12:00:00+00:00
Date surfaced in documents 01 August 2023
Date surfaced in documents 25 May 2018
Date surfaced in documents Between 2534

8. Contract terms that matter

Contract duration in the extract: 2 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • 10 CA Note: Where an IPI Measure is in place and works are greater than €15m in value, the CA must select “Yes”
  • Minimum amount for interim payments, except release of retention, € 0
  • Within 3 months after receipt of the Contractor’s final statement, the Employer’s
  • lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
  • ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
  • ory application, we expect that a bond can be issued within 4 weeks of the
  • e Tenderer’s current principal banker dated within the past 3 months

9. Risks, red flags & unusuals

  • Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 5155640DG0229 rev 0 - TP3_VolE_ITT.pdf, Schedule and, Appendix B1 List of Previous Works projects for which there is a.
  • eTenders CFT / notice reference: contract notice for the Works to etenders and.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: ITT for Works Contracts, ITT-W2 V2.5, ITT-W2 v 2.5 01/08/2023.

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€10,000,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (131)

PDF

5155640DG0229 rev 0 - TP3_VolE_ITT.pdf

441.0 KB · RFT / Invitation to Tender

PDF

5155640DG0228 rev 0 - TP3_VolC_Pricing Doc.pdf

245.3 KB · Pricing / BOQ / Schedule of Rates

PDF

5155640DG0226 rev 0 - TP3_VolA(iii)_Contract.pdf

2.1 MB · Contract / Agreement / Terms

PDF

5155640DG0233 rev 1.pdf

309.8 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-001 rev 0 - SAQ Pt1.docx

199.7 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-001 rev 0 - SAQ Pt1.pdf

493.4 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-002 rev 0 - SAQ Pt2.docx

69.7 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-002 rev 0 - SAQ Pt2.pdf

48.4 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-003 rev 0 - Supp. 3.4.1.docx

46.9 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-003 rev 0 - Supp. 3.4.1.pdf

35.4 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-004 rev 0 - Supp. 3.4.2.docx

42.4 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-004 rev 0 - Supp. 3.4.2.pdf

33.9 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-005 rev 0 - App. A.docx

37.8 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-005 rev 0 - App. A.pdf

36.8 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-007 rev 0 - App. B2.docx

26.0 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-007 rev 0 - App. B2.pdf

9.0 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-008 rev 0 - App. B3.docx

25.6 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-008 rev 0 - App. B3.pdf

6.8 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-009 rev 0 - App. C.docx

29.9 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-009 rev 0 - App. C.pdf

6.8 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-010 rev 0 - App. D2.docx

26.8 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-010 rev 0 - App. D2.pdf

24.4 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-011 rev 0 - App. E.docx

24.0 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-011 rev 0 - App. E.pdf

5.7 KB · Form / Declaration / Certificate

DOCX

5155640DG0233-ATC-012 rev 0 - App. F.docx

22.9 KB · Form / Declaration / Certificate

PDF

5155640DG0233-ATC-012 rev 0 - App. F.pdf

4.7 KB · Form / Declaration / Certificate

PDF

4040 Royal Canal Greenway ITM15 250 Rev2.pdf

10.4 MB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0000_STAT_T_REV_-.pdf

153.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0001_STAT_T_REV_-.pdf

3.6 MB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0002_STAT_T_REV_-.pdf

1.4 MB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0101_STAT_T_REV_-.pdf

744.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0102_STAT_T_REV_-.pdf

528.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0103_STAT_T_REV_-.pdf

477.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0104_STAT_T_REV_-.pdf

581.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0105_STAT_T_REV_-.pdf

646.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0106_STAT_T_REV_-.pdf

579.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0107_STAT_T_REV_-.pdf

699.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0108_STAT_T_REV_-.pdf

444.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0109_STAT_T_REV_-.pdf

588.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0110_STAT_T_REV_-.pdf

421.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0111_STAT_T_REV_-.pdf

862.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0112_STAT_T_REV_-.pdf

329.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0120_STAT_T_REV_-.pdf

649.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0121_STAT_T_REV_-.pdf

581.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0122_STAT_T_REV_-.pdf

1.0 MB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0123_STAT_T_REV_-.pdf

770.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0130_STAT_T_REV_-.pdf

203.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0131_STAT_T_REV_-.pdf

206.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0132_STAT_T_REV_-.pdf

209.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0133_STAT_T_REV_-.pdf

715.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0141_STAT_T_REV_-.pdf

290.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0142_STAT_T_REV_-.pdf

495.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0143_STAT_T_REV_-.pdf

255.2 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0144_STAT_T_REV_-.pdf

249.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0145_STAT_T_REV_-.pdf

303.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0146_STAT_T_REV_-.pdf

368.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0201_STAT_T_REV_-.pdf

754.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0202_STAT_T_REV_-.pdf

603.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0203_STAT_T_REV_-.pdf

473.0 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0204_STAT_T_REV_-.pdf

626.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0205_STAT_T_REV_-.pdf

770.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0206_STAT_T_REV_-.pdf

759.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0207_STAT_T_REV_-.pdf

710.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0208_STAT_T_REV_-.pdf

643.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0209_STAT_T_REV_-.pdf

612.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0210_STAT_T_REV_-.pdf

618.0 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0211_STAT_T_REV_-.pdf

694.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0531_STAT_T_REV_-.pdf

482.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0532_STAT_T_REV_-.pdf

408.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0533_STAT_T_REV_-.pdf

318.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0534_STAT_T_REV_-.pdf

436.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0535_STAT_T_REV_-.pdf

594.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0536_STAT_T_REV_-.pdf

655.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0537_STAT_T_REV_-.pdf

498.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0538_STAT_T_REV_-.pdf

473.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0539_STAT_T_REV_-.pdf

420.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0540_STAT_T_REV_-.pdf

449.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0541_STAT_T_REV_-.pdf

656.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0542_STAT_T_REV_-.pdf

312.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0543_STAT_T_REV_-.pdf

588.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0544_STAT_T_REV_-.pdf

471.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0546_STAT_T_REV_-.pdf

540.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0547_STAT_T_REV_-.pdf

461.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0548_STAT_T_REV_-.pdf

349.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0549_STAT_T_REV_-.pdf

464.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0550_STAT_T_REV_-.pdf

832.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0551_STAT_T_REV_-.pdf

772.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0552_STAT_T_REV_-.pdf

573.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0553_STAT_T_REV_-.pdf

505.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0554_STAT_T_REV_-.pdf

436.9 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0555_STAT_T_REV_-.pdf

488.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0556_STAT_T_REV_-.pdf

741.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_DR_0560_STAT_T_REV_-.pdf

242.1 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0001_STAT_T_REV_-.pdf

2.1 MB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0002_STAT_T_REV_-.pdf

226.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0004_STAT_T_REV_-.pdf

501.2 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0005_STAT_T_REV_-.pdf

3.3 MB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0006_STAT_T_REV_-.pdf

223.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0007_STAT_T_REV_-.pdf

242.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0008_STAT_T_REV_-.pdf

189.4 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0009_STAT_T_REV_-.pdf

1.0 MB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0011_STAT_T_REV_-.pdf

195.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0012_STAT_T_REV_-.pdf

207.5 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0014_STAT_T_REV_-.pdf

226.8 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0015_STAT_T_REV_-.pdf

202.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0016_STAT_T_REV_-.pdf

245.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0017_STAT_T_REV_-.pdf

265.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0018_STAT_T_REV_A.pdf

254.2 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0019_STAT_T_REV_-.pdf

215.7 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0020_STAT_T_REV_-.pdf

220.3 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0023_STAT_T_REV_-.pdf

184.6 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0024_STAT_T_REV_-.pdf

226.2 KB · Drawing / Plan / Layout

PDF

5155640_HTR_SCD_0025_STAT_T_REV_-.pdf

558.6 KB · Drawing / Plan / Layout

PDF

5155640DI0072 rev R02.pdf

1.7 MB · Drawing / Plan / Layout

OTHER

RC-TS-001.txt

1.1 KB · Drawing / Plan / Layout

PDF

39240 Utility Survey Report.pdf

1.4 MB · Other

PDF

5155640_HTR_SCD_0026_STAT_T_REV_-.pdf

432.6 KB · Other

PDF

5155640DG0230 rev 0 - TP3_VolF_PHSP.pdf

15.7 MB · Other

DOCX

5155640DG0233-ATC-006 rev 0 - App. B1.docx

31.3 KB · Other

PDF

5155640DI0097 rev R01.pdf

2.1 MB · Other

OTHER

acad.fmp

294 bytes · Other

PDF

5155640DG0225 rev 0.pdf

2.7 MB

PDF

5155640DG0227 rev 0 - TP3_VolB_FoT.pdf

124.1 KB · Tender Response Template

XLSX

5155640DG0228-ATC-001 rev 0 - BoQ.xlsx

133.4 KB

PDF

5155640DG0231 rev 0 - TP3_VolG_Info Vol.pdf

42.7 KB · Appendix / Annex

PDF

5155640DG0233-ATC-006 rev 0 - App. B1.pdf

9.0 KB · Appendix / Annex

XLSX

5155640DI0072-ATC-001 rev R01.xlsx

50.2 KB

PDF

5155640DI0104 rev R01.pdf

45.0 MB

PDF

5155640DI0104-ATC-001.pdf

3.6 MB · Appendix / Annex

PDF

Slit Trench Locations.pdf

3.6 MB

PDF

WI Blank Deed of Indemnity.pdf

123.8 KB · Insurance / Indemnity

Original notice text

Kildare County Council is seeking contractors for the Royal Canal Greenway project, focusing on construction and operational services over a 2-year period.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

14 Dec

View on eTenders ↗

Location

Along the Royal Canal from Maynooth to Confey

Procedure

Open

Clarification

17 Nov 2023

eTenders ID

2648731

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender