Pontoon Building Refurbishment for New Centralised Locker Block, McKee Barracks
Deadline
21 Nov
21 Nov 2023
Deadline
21 Nov
Refurbishment of pontoon building for new locker block at McKee Barracks
Refurbishment of pontoon building for new locker block at McKee Barracks
Bidder profile
Mid-sized to large firms with public-sector tender experience and operational capability in construction services.
Risks & flags
- Qualification gate
- Undisclosed contract value
- Two-step process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Department of Defence |
| Title | PONTOON BUILDING REFURBISHMENT FOR NEW CENTRALISED LOCKER BLOCK, McKEE BARRACKS |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 3 years |
| Submission deadline | 2023-11-21T12:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Department of Defence ran this procurement for “PONTOON BUILDING REFURBISHMENT FOR NEW CENTRALISED LOCKER BLOCK, McKEE BARRACKS” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- 6 17/07/2023 Category of Specialist Date for warranty Amount withheld Minimum indemnity limit for professional indemnity insurance Maximum excess for professional indemnity insurance greater Electrical Services Prior to the execution of any specialist work on site 100% 1,000,000 2% of Annual Turnover or €5,000.00 whichever is greater
- CA SUPPLEMENTARY REQUIREMENTS: The minimum requirement is that the tenderer has had at least 5 persons employed in a full time capacity delivering construction services on-site in each of the 3 years preceding the closing date for tender receipt
- Supply and fit new 19mm timber fascia and 25mm timber soffit
- Supply & fit new Iroka timber canopy support framework,
- the successful Tenderer shall be required to supply its Tax Clearance Access
- status by the Employer. By supplying these numbers the successful Tenderer
- 2B submitted with its Tender that the parent company will supply a parent
- operations subject to Relevant Contracts Tax (and therefore to reverse-charge Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- refundable to all tenderers that submit bona fide tenders that are not
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — 6 17/07/2023 Category of Specialist Date for warranty Amount withheld Minimum indemnity limit for professional indemnity insurance Maximum excess for professional indemnity insurance greater Electrical Services Prior to the execution of any specialist work on site 100% 1,000,000 2% of Annual Turnover or €5,000.00 whichever is greater Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be
- Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
- Maximum excess for Public liability: €10,00010 in respect of property damage only
- If required, the minimum indemnity limit for professional indemnity insurance shall be €750,000.00 annual aggregate limit
- 6 17/07/2023 Category of Specialist Date for warranty Amount withheld Minimum indemnity limit for professional indemnity insurance Maximum excess for professional indemnity insurance greater Electrical Services Prior to the execution of any specialist work on site 100% 1,000,000 2% of Annual Turnover or €5,000.00 whichever is greater
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| ofessional Indemnity Insurance required for € [18] The exces 2% not stated not stated | |||
| e claim below which the Contractor will bear the cost is the greater amount of 2 | 2% | not stated | not stated |
| cover providing an indemnity of not less than the total contract amount plus a m | 30% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- the Pricing Document is more than €500.
- [ITT-Locker Block.pdf] Instruction to Tenderers
- [ITT-Locker Block.pdf] representation purportedly made on the
- [ITT-Locker Block.pdf] have not been filed, registered, or approved in any jurisdiction. Possession or
- which must be supplied by Tenderers. Tenders must be submitted in
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2023-11-21T12:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2023-11-21T12:00:00+00:00 |
| Date surfaced in documents | 19 July 2023 |
| Date surfaced in documents | November 2021 |
| Date surfaced in documents | July 2023 |
8. Contract terms that matter
Contract duration in the extract: 3 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 0.00 14
- Minimum amount for interim payments, except release of retention, € 0
- CA SUPPLEMENTARY REQUIREMENTS: The minimum requirement is that the tenderer has had at least 5 persons employed in a full time capacity delivering construction services on-site in each of the 3 years preceding the closing date for tender receipt
- (b) expiry of at least 21 days written notice to terminate this Tender
- Estimated 3 months after receipt of Tenders
- ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
- or any part of it and may terminate the process or any part of it at any time,
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-Locker Block.pdf, ITT-Locker Block.pdf] Instruction to Tenderers, ITT-W2 v 2.4 19/07/2023.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT-W2 V2.4, ITT-Locker Block.pdf] representation purportedly made on the, ITT-Locker Block.pdf] have not been filed, registered, or approved in any jurisdict.
This tender has been awarded
- Francis Haughey Building Contractors · 29 Jan 2025
- Francis Haughey Building Contractors · 17 Apr 2024
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Professional indemnity insurance
€750,000
Scoring
Most Economically Advantageous Tender
Documents (34)
ITT-Locker Block.pdf
339.4 KB · RFT / Invitation to Tender
Important Note Re. Pricing Document.pdf
174.4 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor.docx
46.5 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS.docx
42.6 KB · Form / Declaration / Certificate
QW-Part 2.docx
73.0 KB · Form / Declaration / Certificate
QW2-Part 1.docx
194.8 KB · Form / Declaration / Certificate
01-Pontoon Location Plan & Builders Access Route- Compound (Rev 1) (1).pdf
97.3 KB · Drawing / Plan / Layout
02-Pontoon Existing- Demolitions layout (Rev 1) (1).pdf
431.1 KB · Drawing / Plan / Layout
03-Pontoon Proposed Plan Layout & Elevations (Rev 1) (1).pdf
4.3 MB · Drawing / Plan / Layout
04- Pontoon Underfloor Drainage & Foundation Plan (Rev 1) (1).pdf
435.2 KB · Drawing / Plan / Layout
05-Pontoon Proposed Details & Sections (Rev 1) (1).pdf
606.7 KB · Drawing / Plan / Layout
07-Pontoon Ablutions, Sections, Roof vents (Rev 1) (1).pdf
2.3 MB · Drawing / Plan / Layout
08-Pontoon Proposed External Drainage & Site Services (Rev 1) (1).pdf
1.4 MB · Drawing / Plan / Layout
301 Heating Services-Proposed Locker Block McKee M&E.pdf
928.6 KB · Drawing / Plan / Layout
302 Water Services-Proposed Locker Block McKee M&E.pdf
293.1 KB · Drawing / Plan / Layout
303 Ventilation Services- Proposed Locker Block McKee M&E.pdf
352.1 KB · Drawing / Plan / Layout
304 Fire Fighting Services- Proposed Locker Block McKee M&E.pdf
166.3 KB · Drawing / Plan / Layout
305 Site Services-Proposed Locker Block McKee M&E.pdf
383.8 KB · Drawing / Plan / Layout
306 McKEE BARRACKS EXISTING SERVICES -Proposed Locker Block -COMPOSITE 306.pdf
3.5 MB · Drawing / Plan / Layout
401 General Services- Proposed Locker Block McKee M&E.pdf
207.9 KB · Drawing / Plan / Layout
402 Lighting- Proposed Locker Block McKee M&E.pdf
392.0 KB · Drawing / Plan / Layout
403 Fire Alarm Services- Proposed Locker Block McKee M&E.pdf
175.0 KB · Drawing / Plan / Layout
404 Trunking Layout- Proposed Locker Block McKee M&E.pdf
182.4 KB · Drawing / Plan / Layout
405 Elec Schematic- Proposed Locker Block McKee M&E.pdf
669.9 KB · Drawing / Plan / Layout
New Locker Block Fire Report Distances.pdf
153.2 KB · Drawing / Plan / Layout
Pontoon New Locker Block Drawing Issue Sheet.pdf
69.6 KB · Drawing / Plan / Layout
downloadzip.log
80 bytes · Other
Locker Block Asbestos Report.pdf
856.4 KB · Other
06-Door- Pontoon Window & Finishes Schedule (Rev 1) (1).pdf
256.2 KB · Appendix / Annex
1258 Pontoon Building - Vol C.pdf
2.8 MB
1258 Pontoon Building - Vol C.xlsx
141.4 KB
Information Pack - Locker Block.pdf
198.1 KB · Appendix / Annex
Volume A - Works Requirements - Locker Block.pdf
1.2 MB
Volume B - FOT - Locker Block.pdf
272.2 KB · Tender Response Template
Original notice text
This tender involves the refurbishment of the pontoon building at McKee Barracks, including the installation of new timber fascia, soffit, and canopy support framework over a 3-year contract period.