Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Foynes to Limerick Road (including Adare Bypass) Archaeological Consultancy Services - Stage (i)-(iv) Services
Awarded Environmental & Ecology Services SME Suitable Open

Foynes to Limerick Road (including Adare Bypass) Archaeological Consultancy Services - Stage (i)-(iv) Services

Value

€20.0m

Deadline

01 Dec

Archaeological consultancy services for Foynes to Limerick Road project.

SME fit: Medium Bid effort: Medium 📍 Limerick

Archaeological consultancy services for Foynes to Limerick Road project.

Bidder profile

Firms with expertise in archaeological consultancy and a proven track record in environmental assessments.

Risks & flags

  • High turnover threshold
  • Geographic constraints
  • Tight timelines
  • Incumbent advantage

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Title
Limerick City and County Council_103432 Foynes to Limerick Road (including Adare Bypass) Archaeological Consultancy Services - Stage (i)-(iv) Services
CPV / category Environmental & Ecology
Estimated value €20,000,000.00
Per-year (if multi-year) not stated
Procedure type Open
Lots not stated
Location Limerick, Ireland
Contract length not stated
Submission deadline 1 December 2023, 14:00 GMT
Go-live / start not stated

2. Scope of Work

The contract involves the provision of archaeological consultancy services for the Foynes to Limerick Road project, including the Adare Bypass. The contractor will be responsible for ensuring compliance with archaeological regulations and standards throughout the project lifecycle. The work will encompass several stages, including:

  • Stage (i): Desktop studies to assess archaeological potential.
  • Stage (ii): Field surveys and test excavations to identify archaeological features.
  • Stage (iii): Monitoring of construction activities to mitigate impacts on archaeological sites.
  • Stage (iv): Reporting and documentation of findings, including preparation of archaeological reports for submission to relevant authorities.

The contractor must engage with various stakeholders, including local authorities and heritage agencies, to ensure adherence to legislative requirements. Specific deliverables include:

  • Archaeological impact assessments for the proposed road alignment.
  • Detailed excavation reports for any identified archaeological features.
  • Quarterly monitoring reports during construction phases.
  • Coordination with environmental consultants to address ecological considerations.

The contractor will operate primarily in the Limerick region, focusing on areas within 500 meters of the proposed road development. The work will require a minimum of two qualified archaeologists on-site during key phases, with a focus on ensuring minimal disruption to the environment and compliance with all relevant regulations.

3. Background & buyer context

This procurement aligns with the strategic objectives of Limerick City and County Council to enhance regional infrastructure while preserving cultural heritage. The Foynes to Limerick Road project is part of a broader initiative to improve transport links in the region, supported by government funding. The urgency for archaeological consultancy arises from the need to comply with national heritage legislation and to mitigate potential impacts on archaeological sites identified in previous assessments. The incumbent contractor is not specified, indicating an opportunity for new bidders to enter the market.

4. Eligibility & selection criteria

Bidders must meet the following eligibility and selection criteria:

  • Turnover requirement: Minimum average annual turnover of €6,500,000 in the last three financial years.
  • Insurance:
  • Public Liability: €6,500,000
  • Employer's Liability: €13,000,000
  • Professional Indemnity: €6,500,000
  • Certifications:
  • ISO 9001 (Quality Management)
  • ISO 14001 (Environmental Management)
  • Registration with the Construction Contracts Register.
  • Past experience: Minimum of 3 comparable projects completed in the last 5 years, each with a value of at least €1,000,000.
  • Personnel: At least 2 archaeologists with a minimum of 5 years' experience in archaeological consultancy.
  • Geographic / facility constraints: Bidders must be based within 50 km of the project site in Limerick.

5. Award criteria & scoring

Bids will be evaluated based on the following criteria:

Criterion Weight (%) Sub-criteria Pass/Fail Threshold
Quality of Proposal 60 Methodology, experience, and personnel qualifications Minimum score of 40%
Price 40 Total cost of services Minimum score of 30%

The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, balancing quality and price.

6. Submission requirements

Bidders must submit the following documents:

  • Method statement: A detailed response document following the provided template, limited to 20 pages.
  • CVs: Curriculum Vitae for key personnel, limited to 2 pages each.
  • Pricing schedule: A completed pricing template outlining all costs associated with the consultancy services.
  • Case studies: At least 3 case studies of similar projects, each valued between €1,000,000 and €5,000,000.
  • Declarations: Completed European Single Procurement Document (ESPD), Bona Fides declaration, Tax clearance certificate, and Conflict of Interest statement.
  • Mandatory site visit: A site visit is required on 15 November 2023; contact details for coordination will be provided.
  • Submission portal: All documents must be submitted via the eTenders portal, adhering to specified format rules.

7. Key dates & process

Key Date Date & Time
RFT issued 1 November 2023
Clarification deadline 22 November 2023
Mandatory site visit 15 November 2023
Tender deadline 1 December 2023, 14:00 GMT
Expected award 15 December 2023
Contract start 1 January 2024
Go-live / mobilisation 1 February 2024

8. Contract terms that matter

Key contract terms include:

  • Term + extension structure: The initial contract term is for 12 months, with an option to extend for an additional 6 months based on performance.
  • Payment terms: Payments will be made monthly based on submitted invoices, contingent on satisfactory completion of milestones.
  • Key SLAs/KPIs: Timely submission of reports and adherence to project timelines will be monitored.
  • Liquidated damages: A penalty of €1,000 per day will apply for delays beyond agreed timelines.
  • Termination clauses: The contract may be terminated for non-performance or breach of contract terms.
  • IP ownership: All intellectual property generated during the contract will remain with the buyer.
  • Sub-contracting rules: Sub-contracting is permitted but must be disclosed and approved by the buyer.

9. Risks, red flags & unusuals

Potential risks associated with this tender include:

  • High turnover threshold: The minimum turnover requirement of €6,500,000 may limit participation from smaller firms.
  • Geographic constraints: The requirement for bidders to be within 50 km of the project site may restrict competition.
  • Tight timelines: The contract start date is set for January 2024, which may not allow sufficient time for thorough preparation and mobilization.
  • Incumbent advantage: If an incumbent contractor exists, they may have an advantage due to familiarity with the project and established relationships with stakeholders.

10. SME fit assessment

This tender is suitable for small to medium-sized enterprises (SMEs) with expertise in archaeological consultancy. Viable bidders should have:

  • A proven track record in similar projects, ideally with experience in environmental and archaeological assessments.
  • The capacity to meet the insurance and turnover requirements, which may be challenging for smaller firms.
  • The ability to assemble a qualified team, including archaeologists with relevant experience.
  • The option to form consortia or subcontract to meet specific requirements is allowed, which may enhance competitiveness.
  • Bid preparation is estimated to require approximately 10-15 days, considering the complexity of the proposal.
  • The presence of an incumbent contractor may signal a competitive landscape, but opportunities exist for new entrants with strong qualifications.

11. Where to dig deeper

  • Source RFT filename: Foynes to Limerick Road Archaeological Consultancy Services RFT.pdf
  • eTenders CFT ID: not specified
  • Contact email: not specified; refer to eTenders portal for clarification.
  • Important attachments:
  • Appendix G — Relevé Data
  • Natura Impact Statement
  • Environmental Impact Assessment Report

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • ISO 14001
  • Construction Contracts Register

Minimum turnover

€6,500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (83)

PDF

AO_PR_127 COP for Working in the Vicinity of Network.pdf

997.8 KB · Specification

PDF

biosecurityforfieldsurveys2010.pdf

505.8 KB · Specification

PDF

DN-ARC-03076-01.pdf

6.8 MB · Specification

PDF

DN-ARC-03078-01.pdf

5.7 MB · Specification

XLSX

DRI_TII-HC_metadata specification_v.2.xlsx

13.9 KB · Specification

DOCX

DRI_TII-HC_report metadata requirements_v.2.docx

236.1 KB · Specification

PDF

EnvironmentalSamplingGuidelines-2007-comp-1.pdf

1014.6 KB · Specification

PDF

GE-ENV-01101-01.pdf

1.1 MB · Specification

PDF

Guidelines-for-the-Crossing-of-Watercourses-during-the-Construction-of-National-Road-Schemes.pdf

1.1 MB · Specification

PDF

Guidelines-for-the-Protection-and-Preservation-of-Trees-Hedgerows-and-Scrub.pdf

291.2 KB · Specification

PDF

Guidelines-for-the-Treatment-of-Badgers-prior-to-the-Construction-of-a-National-Road-Scheme.pdf

1.8 MB · Specification

PDF

Guidelines-for-the-Treatment-of-Bats-during-the-Construction-of-National-Road-Schemes.pdf

1.0 MB · Specification

PDF

Guidelines-for-the-Treatment-of-Otters-prior-to-the-Construction-of-National-Road-Schemes.pdf

1.6 MB · Specification

PDF

IAD_StandardsforExcavationObjects_1.pdf

1.6 MB · Specification

PDF

Management-of-Noxious-Weeds-and-Non-Native-Invasive-Plant-Species-on-National-Road-Schemes.pdf

3.7 MB · Specification

PDF

NIS Volume 1 Main Text.pdf

3.9 MB · Specification

PDF

PE-ARC-02006-01.pdf

2.9 MB · Specification

PDF

PE-ARC-02007-01.pdf

2.3 MB · Specification

PDF

PE-ARC-02008-01.pdf

1.6 MB · Specification

PDF

The-Treatment-of-Human-Remains.pdf

373.8 KB · Specification

DOCX

TII radiocarbon dates datasets_data structure_v.8.docx

22.2 KB · Specification

PDF

IAI-Best-Practice-Standard-Procedures-in-Fixed-Price-Contracts-20121.pdf

150.2 KB · Contract / Agreement / Terms

XLSX

DRI_TII-HC_Metadata spreadsheet template_v.1.xlsx

22.9 KB · Form / Declaration / Certificate

PDF

IAD_AdviceNotes_AlterExport_P4.pdf

192.4 KB · Form / Declaration / Certificate

PDF

App H Fig 4.25 - 4.37 Mainline Plan and Profile.pdf

11.6 MB · Drawing / Plan / Layout

PDF

App H Fig 4.38 - 4.49 Mainline Plan and Profile.pdf

12.4 MB · Drawing / Plan / Layout

PDF

App H Fig 4.59 - 4.68 Sideroads and Junctions.pdf

10.6 MB · Drawing / Plan / Layout

PDF

App H Fig 4.69 - 4.70 Road Cross Sections.pdf

548.8 KB · Drawing / Plan / Layout

PDF

App H Fig 4.71 - Haulage Route.pdf

7.0 MB · Drawing / Plan / Layout

PDF

App H Fig 4.72 - 4.75 River Maigue Bridges.pdf

2.9 MB · Drawing / Plan / Layout

PDF

App I Fig 7.1 - Designated Sites-Fig 7.1.pdf

8.7 MB · Drawing / Plan / Layout

PDF

App I Fig 7.2 - 7.24 - Habitat Mapping.pdf

9.8 MB · Drawing / Plan / Layout

PDF

App I Fig 7.25 - 7.47 - Biodiversity Mitigation.pdf

11.4 MB · Drawing / Plan / Layout

PDF

App J Fig 9.2 - Quaternary Geology.pdf

6.0 MB · Drawing / Plan / Layout

PDF

App J Fig 9.3 - Groundwater Vulnerability.pdf

1.0 MB · Drawing / Plan / Layout

PDF

App J Fig 9.4 - Aquifer.pdf

2.8 MB · Drawing / Plan / Layout

PDF

App J Fig 9.5 Hydrological Mitigation.pdf

2.6 MB · Drawing / Plan / Layout

PDF

App J Fig 9.6 - 9.16 Hydrological Mitigation.pdf

7.3 MB · Drawing / Plan / Layout

PDF

App K Fig 10.1 - Watercourses.pdf

7.5 MB · Drawing / Plan / Layout

PDF

App K Fig 10.2 - Catchments.pdf

1.6 MB · Drawing / Plan / Layout

PDF

App K Fig 10.3 - 10.25 - Drainage Network Plans.pdf

11.1 MB · Drawing / Plan / Layout

ZIP

Cultural Heritage.zip

60.9 KB · Drawing / Plan / Layout

ZIP

Exclusion Zones.zip

14.4 KB · Drawing / Plan / Layout

ZIP

FTLRAB-JAC-EHR-XX_XX-DR-LH-0035.zip

3.4 KB · Drawing / Plan / Layout

ZIP

Scheme Boundary.zip

66.6 KB · Drawing / Plan / Layout

ZIP

Stage (i) Test Excavations & Surveys.zip

112.8 KB · Drawing / Plan / Layout

PDF

14.131 App 14.7 Designed Landscapes V7.pdf

403.6 KB · Other

PDF

App H Fig 4.50 - 4.58 Sideroads and Junctions.pdf

9.3 MB · Other

PDF

App J Fig 9.1 - Bedrock Geology.pdf

2.4 MB · Other

PDF

b94ff281-916e-4158-9349-5f2a04ee60ba.pdf

588.9 KB · Other

PDF

excavation-reports-guidelines-for-authors.pdf

61.2 KB · Other

XLSX

FTLRAB-JAC-EHR-ZZ_ZZ-CD-LH-0004.xlsx

233.4 KB · Other

PDF

Guidelines for database records for archaeological archives_Draft (NMS, 2012).pdf

433.8 KB · Other

PDF

Guidelines for Transfer of Excavation Archives to NMS Archive_Sept23.pdf

398.1 KB · Other

PDF

Guidelines Report 2016.pdf

2.4 MB · Other

PDF

Guidelines-for-the-Creation-and-Maintenance-of-an-Environmental-Operating-Plan.pdf

3.7 MB · Other

PDF

IAI-Code-of-Conduct-for-the-Archaeological-Treatment-of-Human-Remains.pdf

266.6 KB · Other

PDF

NMI-Human-Remains-Policy-2019-2023-FINAL.pdf

587.9 KB · Other

PDF

14.131 App 14.1 Baseline V7.pdf

449.7 KB · Appendix / Annex

PDF

14.131 App 14.10 Legislation Archaeology V7.pdf

361.1 KB · Appendix / Annex

PDF

14.131 App 14.11 Legislation Architecture V7.pdf

426.5 KB · Appendix / Annex

PDF

14.131 App 14.12 Impact Assessment V7.pdf

315.0 KB · Appendix / Annex

PDF

14.131 App 14.13 Mitigation V7.pdf

337.2 KB · Appendix / Annex

PDF

14.131 App 14.14 Previous Excavations V7.pdf

436.8 KB · Appendix / Annex

PDF

14.131 App 14.2 Recorded Monuments V7.pdf

903.3 KB · Appendix / Annex

PDF

14.131 App 14.3 LiDAR Report.pdf

15.2 MB · Appendix / Annex

PDF

14.131 App 14.4 Stray Finds V7.pdf

314.7 KB · Appendix / Annex

PDF

14.131 App 14.6 Protected Structures and NIAH Structures V7.pdf

698.9 KB · Appendix / Annex

PDF

14.131 App 14.8 Site Inspection V7.pdf

434.9 KB · Appendix / Annex

PDF

14.131 App 14.9 Plates V7.pdf

3.9 MB · Appendix / Annex

PDF

14.131 Ch 08 Soils and Geology.pdf

446.1 KB · Appendix / Annex

PDF

14.131 Ch 14 Archaeology Architecture and Cultural Heritage.pdf

1.2 MB · Appendix / Annex

PDF

Appendix A AA Screening Report.pdf

1.6 MB · Appendix / Annex

PDF

Appendix B EIAR Biodiversity Chapter.pdf

4.1 MB · Appendix / Annex

PDF

Appendix C Environmental Operating Plan.pdf

7.8 MB · Appendix / Annex

PDF

Appendix D Four-Season Bat Report.pdf

15.1 MB · Appendix / Annex

PDF

Appendix E EIAR Hydrogeology Chapter.pdf

2.0 MB · Appendix / Annex

PDF

Appendix F EIAR Hydrology Chapter.pdf

618.0 KB · Appendix / Annex

PDF

Appendix G Releve Data.pdf

325.0 KB · Appendix / Annex

PDF

Appendix L_Field Notes_Rev 1.0_Redactions.pdf

16.7 MB · Appendix / Annex

PDF

CC-SCD-00304-03.pdf

231.0 KB

PDF

St.i-ii Arch Method Statement_rev02.pdf

37.2 MB · Appendix / Annex

XLSX

TII radiocarbon dates datasets_template_v.1.xlsx

10.4 KB · Tender Response Template

Original notice text

Provision of archaeological consultancy services for the Foynes to Limerick Road project, ensuring compliance with regulations and standards throughout the project lifecycle.

AI analysis updated 3 months, 4 weeks ago

Bid ↗
Details

Value

€20.0m

Deadline

01 Dec

View on eTenders ↗

Location

Limerick, Ireland, focusing on areas within 500 meters of the proposed road development.

Procedure

Open

Clarification

22 Nov 2023

eTenders ID

2565315

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender