Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / HM 0128 Heat Pump Servicing and Repair Contract
Awarded Building Services & Maintenance Services Open

HM 0128 Heat Pump Servicing and Repair Contract

Deadline

28 Sep

Cork City Council heat pump servicing and repair contract for 6 months

SME fit: Medium Bid effort: Medium 📍 Cork

Cork City Council heat pump servicing and repair contract for 6 months

Bidder profile

Firms with experience in public sector contracts and expertise in heat pump servicing and safety compliance.

Risks & flags

  • Undisclosed contract value
  • Compliance with asbestos regulations
  • Two-step tender process

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Cork City Council
Title HM 0128 Heat Pump Servicing and Repair Contract
CPV / category services
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 6 months
Submission deadline 2023-09-28T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

Cork City Council ran this procurement for “HM 0128 Heat Pump Servicing and Repair Contract” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • Sector: Building Services & Maintenance
  •  Implementation of the minimum standard conditions and pay rates of the Industry.
  • This policy is intended to ensure that The Housing and Community Directorate’s Housing and Community Directorates duties under the Safety Health and Welfare at Work Act 2005, towards its employees, tenants, visitors, services users, contractors and members of the public, with regard to all asbestos containing materials within its control, are managed responsibly.
  • Housing and Community Directorate; Director of Services
  • Director of Services-Housing Maintenance
  • It will be the duty of the Director of Service to ensure that the Housing and Community Directorate through its Departments manages its responsibilities under the Safety Health and Welfare at Work (Exposure to Asbestos) Regulation 2010.
  • The Housing and Community Directorate shall ensure that a system of re-inspections is implemented in line with the requirements of Regulation 7 of the Safety Health and Welfare at Work (Exposure to Asbestos) Regulation 2010.
  • The Housing and Community Directorate will ensure that all employees involved in the management and maintenance of buildings, who are liable to be exposed to asbestos, receive adequate information, instruction and training. All contractors undertaking major or cyclical work, who are liable to be exposed to asbestos
  • The Housing and Community Directorate will ensure that all employees involved in the management and maintenance of buildings, who are liable to be exposed to asbestos, receive adequate information, instruction and training. All contractors undertaking major or cyclical work, who are liable to be exposed to asbestos, will be required to follow the appropriate procedures.
  • This policy supports the Housing and Community Directorate’s Mission and Values statement and Health and Safety Statement
  • Ensure all contractors and maintenance personnel are aware of the presence of asbestos in work areas;
  • Consult the asbestos register prior to undertaking ANY maintenance work.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  •  The CIF Pension Fund and Sick Pay Scheme.
  •  Other Pension Fund and Sick Pay Scheme relevant to the industry.
  • [6. Draft Asbestos Management Policy Housing.docx] Date: Revision Description: Revision Change:
  • This policy is intended to ensure that The Housing and Community Directorate’s Housing and Community Directorates duties under the Safety Health and Welfare at Work Act 2005, towards its employees, tenants, visitors, services users, contractors and members of the public, with regard to all asbestos containing materials within its control, are managed responsibly.

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • [5. Contractors Certificate of Compliance.pdf] 1
  • [5. Contractors Certificate of Compliance.pdf]  Payments due to be paid on behalf of each work person (including pension
  • This policy should be read in conjunction with the Asbestos Management Plan (Appendix 1) and Emergency Procedures (Appendix 2)
  • The Action Plan in Appendix1 of the Asbestos Managements Plan will be consulted to assess ongoing progress.
  • The Housing and Community Directorate recognise the danger of asbestos (Appendix A) and their intention is to minimise the exposure of people, whether staff, residents, contractors or others, to airborne asbestos wherever reasonably practicable. However, The Housing and Community Directorate affirm that ACMs form an integral and important part of many premises and if well maintained do not present any threat to health.

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2023-09-28T11:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2023-09-28T11:00:00+00:00
Date surfaced in documents October 2019
Date surfaced in documents Act 1991
Date surfaced in documents Acts 1946

8. Contract terms that matter

Contract duration in the extract: 6 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • is not reasonably practicable, the minimum of equipment to be carried in the vehicle is:
  • be issued to the Safety Section within 4 weeks of receipt of the Monthly Report
  • the Payment of Wages Act 1991 and will not be more than 1 month in arrears or
  • We refer to the above contract. Terms used in this letter that are defined in the Conditions
  • The Contractor certifies that in respect of the contracted work, all the terms and conditions
  • completed are treated in full compliance with Irish employment legislation and
  •  Payments due to be paid on behalf of each work person (including pension

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 5. Contractors Certificate of Compliance.pdf, 6. Draft Asbestos Management Policy Housing.docx, 7. Draft Asbestos Management Plan Housing.docx.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: 4. CCC lone working policy.pdf, scheduled to exceed 500, Appendix 1) and Emergency Procedures (Appendix 2).

Can you bid?

Required certifications

  • ISO 17020

Scoring

Most Economically Advantageous Tender

Documents (9)

PDF

5. Contractors Certificate of Compliance.pdf

52.9 KB · Contract / Agreement / Terms

PDF

Designers Risk Asessment HM0128.pdf

574.8 KB · Form / Declaration / Certificate

PDF

1. CCC SS 2023 Rev 013pk (002).pdf

1.5 MB · Other

PDF

4. CCC lone working policy.pdf

80.3 KB · Other

DOCX

6. Draft Asbestos Management Policy Housing.docx

48.0 KB · Other

DOCX

7. Draft Asbestos Management Plan Housing.docx

90.7 KB · Other

PDF

8. Data Protection Policy (2018).pdf

295.2 KB · Other

DOC

6. QW2_Suitability_Assessment_Open_Form.doc

451.5 KB

DOC

8. QW2_Appendix_A.doc

38.5 KB

Original notice text

Cork City Council seeks a contractor for heat pump servicing and repair, ensuring compliance with health and safety regulations, particularly regarding asbestos management.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

28 Sep

View on eTenders ↗

Location

Ireland

Procedure

Open

Clarification

23 Aug 2023

eTenders ID

2221524

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender