FCC/305/23 Turvey Avenue Footpath Construction Project
Deadline
11 Sep
11 Sep 2023
Deadline
11 Sep
Construction of footpaths on Turvey Avenue for Fingal County Council.
Construction of footpaths on Turvey Avenue for Fingal County Council.
Bidder profile
Mid-sized to large firms with public sector tender experience and financial capacity.
Risks & flags
- undisclosed contract value
- qualification gate turnover threshold
- two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Fingal County Council_371 |
| Title | FCC/305/23 Turvey Avenue Footpath Construction Project |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 7 years |
| Submission deadline | 2023-09-11T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Fingal County Council_371 ran this procurement for “FCC/305/23 Turvey Avenue Footpath Construction Project” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
- the successful Tenderer shall be required to supply
- the successful Tenderer shall be required to supply its Tax Clearance Access
- status by the Employer. By supplying these numbers the successful Tenderer
- 2B submitted with its Tender that the parent company will supply a parent
- operations subject to Relevant Contracts Tax (and therefore to reverse-charge
- the relevant Director of Services in Fingal County Council (the Sanctioning Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- The proposed construction programme is 3-6 months
- refundable to all tenderers that submit bona fide tenders that are not
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 Tenderer Entry: Check the appropriate bo; Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 Tenderer Entry: Check the appropriate bo
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — Minimum Turnover Area of Work / Business: Overall Average Turnover to include other areas of business Minimum Average Turnover: Maximum Average Turnover: Civil Engineering N/A €1.0m on average over any 3 of the last 4 ye
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum Turnover Area of Work / Business: Overall Average Turnover to include other areas of business Minimum Average Turnover: Maximum Average Turnover: Civil Engineering N/A €1.0m on average over any 3 of the last 4 ye
- Minimum level of Public Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €6500000 Tenderer Entry: Check the appropriate bo
- Minimum level of Employer’s Liability Insurance required in respect of any one accident below which the Works Contractor and as PSCS will bear the cost: €13000000 Tenderer Entry: Check the appropriate bo
- Minimum indemnity limit for Public liability insurance: €6,500,0007 for any one event, but this limit may be
- Minimum indemnity limit for Employers’ liability insurance: €13,000,0008 for any one event
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- [ITT-W2-v2.4-19-07-2023.pdf] Instruction to Tenderers
- [ITT-W2-v2.4-19-07-2023.pdf] er’s behalf in connection with them. Neither the Employer nor its
- [ITT-W2-v2.4-19-07-2023.pdf] or approved in any jurisdiction. Possession or
- [ITT-W2-v2.4-19-07-2023.pdf] It will be a condition of the award of the Contract that the successful
- The Employer has sent a contract notice for the Works to etenders and where
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2023-09-11T11:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2023-09-11T11:00:00+00:00 |
| Date surfaced in documents | 01 January 2021 |
| Date surfaced in documents | 31 January 2020 |
| Date surfaced in documents | 31 December 2020 |
8. Contract terms that matter
Contract duration in the extract: 7 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as
- On 9 September 2020, the Government published new legislation2, as part of its preparations for the
- ory application, we expect that a bond can be issued within 4 weeks of the receipt by us of the relevant ap
- or any part of it and may terminate the process or any part of it at any time,
- These documents are being made available on the terms stated in these
- use of these documents contrary to any law is prohibited. Recipients must
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: ITT-W2-v2.4-19-07-2023.pdf, Schedule, part 2D) , Schedule and.
- eTenders CFT / notice reference: contract notice for the Works to etenders and where.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: ITT-W2-v2.4-19-07-2023.pdf] Instruction to Tenderers, ITT-W2 v 2.4 19/07/2023, ITT-W2 V2.4.
This tender has been awarded
- Priority Construction · 26 Mar 2024
- Priority Construction · 13 Dec 2023
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€1,000,000
Public liability insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Documents (38)
Volume A Part B.pdf
20.5 MB · Specification
ITT-W2-v2.4-19-07-2023.docx
101.6 KB · RFT / Invitation to Tender
ITT-W2-v2.4-19-07-2023.pdf
353.8 KB · RFT / Invitation to Tender
Volume B_FTS.pdf
396.2 KB · RFT / Invitation to Tender
Pricing Document 280823.pdf
1.7 MB · Pricing / BOQ / Schedule of Rates
Pricing Document 280823.xlsx
100.1 KB · Pricing / BOQ / Schedule of Rates
Volume C (Pricing Doc).xlsx
100.3 KB · Pricing / BOQ / Schedule of Rates
Volume C.pdf
1.7 MB · Pricing / BOQ / Schedule of Rates
Volume C02 220823.pdf
1.7 MB · Pricing / BOQ / Schedule of Rates
Volume C02 220823.xlsx
99.0 KB · Pricing / BOQ / Schedule of Rates
Volume B_PWC_Contract.pdf
1.0 MB · Contract / Agreement / Terms
FCC.305.23 - QW2_Suitability_Assessment_Open_Form.pdf
448.5 KB · Form / Declaration / Certificate
Brexit and Uk based Insurers.pdf
144.3 KB · Insurance / Indemnity
FCC Additional Information.pdf
112.7 KB · Clarification / Addendum
FCC.305.23 - QW2_Suitability_Assessment_Open_Form.doc
482.5 KB
PI questionnaire (Consultants) JAN 2023 (002) (002).docx
381.3 KB · Insurance / Indemnity
QW2-Appendix-D.docx
23.3 KB · Appendix / Annex
QW2-Appendix-E.docx
28.5 KB · Appendix / Annex
QW2-Appendix-F.docx
27.3 KB · Appendix / Annex
QW2-Appendix-G.docx
23.3 KB · Appendix / Annex
QW2_Appendix_A1.doc
52.0 KB
QW2_Appendix_A2.doc
60.0 KB
QW2_Appendix_B1.doc
90.5 KB
QW2_Appendix_B2.doc
69.0 KB
QW2_Appendix_B3.doc
72.5 KB
QW2_Appendix_C1.doc
68.5 KB
QW2_Appendix_C2.doc
69.0 KB
QW2_Appendix_C3.doc
69.5 KB
QW2_Appendix_C4.doc
69.5 KB
QW2_Appendix_C5.doc
68.5 KB
QW2_Appendix_C6.doc
67.5 KB
QW2_Appendix_H.doc
54.5 KB
QW2_Appendix_I.doc
51.5 KB
QW2_Supplement_3.4.1.doc
106.5 KB
QW2_Supplement_3.4.2.doc
125.0 KB
Volume A Part A.pdf
3.5 MB
Volume D.pdf
390.2 KB · Appendix / Annex
Volume O.pdf
10.8 MB · Appendix / Annex
Original notice text
This project involves the construction of footpaths on Turvey Avenue, requiring compliance with public procurement standards and operational execution over a 7-year contract.
AI analysis updated 4 months ago
Deadline
11 Sep
Buyer
Fingal County CouncilLocation
Various sites within Fingal County
Procedure
Open
Clarification
28 Aug 2023
eTenders ID
2201274
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender