Shannon Airport Watermain Rehabilitation Works
Value
€600k
Deadline
29 Aug
29 Aug 2023
Value
€600k
Deadline
29 Aug
Watermain rehabilitation works at Shannon Airport
Watermain rehabilitation works at Shannon Airport
Bidder profile
Firms with experience in water and wastewater projects, capable of meeting public procurement standards and insurance requirements.
Risks & flags
- Information asymmetry
- Compliance risks
- Tight timelines
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Shannon Airport Authority DAC |
| Title | Shannon Airport Watermain Rehabilitation Works |
| CPV / category | works / Water & Wastewater |
| Estimated value | €600000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2023-08-29T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Shannon Airport Watermain Rehabilitation Works. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Water & Wastewater under buyer workflows in Shannon Airport Authority DAC.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event; Maximum excess for Public liability: €5,000 in respect of property damage only
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — not specified for this tender
- Insurance
- Public Liability — €6,500,000
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event; Maximum excess for Public liability: €5,000 in respect of property damage only
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | discrimination, transparency and proportionality. |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2023-08-29T11:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): ITT-W2-v2.3-07-01-2022.docx, QW2-Appendix-D.docx
- eTenders CFT ID: not stated
- Clarification contact / portal: eTenders clarification portal
- Priority attachments: ITT-W2-v2.3-07-01-2022.docx, QW2-Appendix-D.docx, 023_Volume A1-Shannon Airport.docx
This tender has been awarded
- Source Civil Ltd · 26 May 2025
- Source Civil Ltd · 14 Sep 2023
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,000,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Civil engineering works for watermain rehabilitation at Shannon Airport.
Documents (52)
11023_Volume A1-Shannon Airport_A.pdf
1.3 MB · Specification
IGN 4-01-03 October 2015 Issue 2.pdf
1.5 MB · Specification
Itron 2 wire cyble.pdf
319.4 KB · Specification
MacR6-N_Data-sheet_EN_v1_February-2020.pdf
1.1 MB · Specification
Water UK - Principles of Water Supply Hygiene.pdf
681.3 KB · Specification
woltex data.pdf
480.4 KB · Specification
ITT-W2-v2.3-07-01-2022.docx
102.9 KB · RFT / Invitation to Tender
11023-Pricing Document_RevA.pdf
661.4 KB · Pricing / BOQ / Schedule of Rates
11023-PricingDocumentPreamble_.pdf
230.4 KB · Pricing / BOQ / Schedule of Rates
Miscellaneous-Charges-Booklet-for-2023-(1).pdf
990.0 KB · Pricing / BOQ / Schedule of Rates
MF-1.10-PSCS Appointment.docx
53.0 KB · Contract / Agreement / Terms
MF-1.12-Collateral Warranty.docx
68.4 KB · Contract / Agreement / Terms
MF-1.16-Appointment of Concillator.docx
56.6 KB · Contract / Agreement / Terms
PW-CF5-A2-09-12-2019 (1).docx
34.5 KB · Contract / Agreement / Terms
PW-CF5-A3-09-12-2019 (1).docx
34.0 KB · Contract / Agreement / Terms
PW-CF5-A5-09-12-2019 (2).docx
35.7 KB · Contract / Agreement / Terms
PW-CF5-A5.1-09-12-2019 (2).docx
32.0 KB · Contract / Agreement / Terms
PW-CF5-Agreement-A1-04-11-2009-rev (2).docx
33.9 KB · Contract / Agreement / Terms
PW-CF5-Agreement-A4-04-11-2009-rev (1).docx
34.1 KB · Contract / Agreement / Terms
PW-CF5-v2.6-07-01-2022.pdf
914.4 KB · Contract / Agreement / Terms
Form of Tender & Schedule.docx
90.9 KB · Form / Declaration / Certificate
MF-1.13-Rates of Pay & Conditions of Employ.docx
47.8 KB · Form / Declaration / Certificate
MF-1.17-Bond_Concillators Recommendation.docx
35.0 KB · Form / Declaration / Certificate
11023-6010-6013.pdf
2.6 MB · Drawing / Plan / Layout
20230623-038-001_A3.pdf
418.5 KB · Drawing / Plan / Layout
20230623-038-002_A3.pdf
443.3 KB · Drawing / Plan / Layout
20230623-038-003_A3.pdf
434.6 KB · Drawing / Plan / Layout
20230623-038_A3.pdf
381.4 KB · Drawing / Plan / Layout
11023_Preliminary Safety and Health Plan_RevA.pdf
1.6 MB · Other
ESB Construction Safety 28th 11.40.pdf
803.2 KB · Other
Safety Booklet-A5-HSQE-GU-016.pdf
1.1 MB · Other
Shannon Airport Co Clare.pdf
399.8 KB · Other
~$023_Volume A1-Shannon Airport.docx
162 bytes · Other
11023 - Pricing Documents C1 C2 C3 C4 - RevA.xls
556.5 KB
11023 QW2_Suitability_Assessment_.doc
456.0 KB
Guidelines_for_managing_openings_in_public_roads_september_2015.pdf
5.7 MB
QW2-Appendix-D.docx
17.1 KB · Appendix / Annex
QW2-Appendix-E.docx
23.2 KB · Appendix / Annex
QW2-Appendix-F.docx
21.4 KB · Appendix / Annex
QW2_Appendix_A1.doc
32.0 KB
QW2_Appendix_A2.doc
40.0 KB
QW2_Appendix_B1.doc
67.5 KB
QW2_Appendix_B2.doc
48.0 KB
QW2_Appendix_B3.doc
50.5 KB
QW2_Appendix_C1.doc
46.0 KB
QW2_Appendix_C3.doc
47.0 KB
QW2_Appendix_C4.doc
47.0 KB
QW2_Supplement_3.4.1.doc
86.0 KB
QW2_Supplement_3.4.2.doc
100.5 KB
SAMPLE Shannon Airport Application for Airport ID.pdf
1.5 MB
Shannon Airport Application for Airport ID.pdf
167.5 KB
Shannon Airport Garda Security Form.pdf
59.3 KB
Original notice text
This tender involves the rehabilitation of watermain systems at Shannon Airport, ensuring compliance with quality and administrative requirements while maintaining operational delivery.
AI analysis updated 4 months ago
Value
€600k
Deadline
29 Aug
Location
Shannon Airport, specific location details not provided.
Procedure
Open
Clarification
11 Aug 2023
eTenders ID
2138158
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender