Ballinode Community Centre Project
Deadline
18 Aug
18 Aug 2023
Deadline
18 Aug
Operational contract for the Ballinode Community Centre Project over 15 years
Operational contract for the Ballinode Community Centre Project over 15 years
Bidder profile
Mid-sized to large firms with public sector tender experience and operational capabilities in construction and service management.
Risks & flags
- Undisclosed contract value
- Qualification gate for turnover
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Ballinode Community Projects Ltd |
| Title | Ballinode Community Centre Project |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 15 years |
| Submission deadline | 2023-08-18T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Ballinode Community Projects Ltd ran this procurement for “Ballinode Community Centre Project” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- Maximum excess for Public liability: €10,000 in removal and weakening of supports an
- The system shall be capable of controlling a minimum of 100 devices per loop as an absolute,
- The building will be provided with a minimum of a L3 type fire detection and alarm system
- DC Cables shall satisfy IS EN 50618:2014 Electric cables for Photovoltaic Systems and
- Systems and IS EN 62790: 2015 Junction Boxes for Photovoltaic Modules – Safety
- required to the CER or EN50438 standard or additionally in larger systems incorporated within
- IS EN 62109:2010 Safety of Power Converters for use in Photovoltaic power systems
- daily, weekly, monthly, 6 monthly and annual maintenance schedules
- ceptance, the system shall be fully ‘soak tested’ for about 1 week
- Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be on an annual aggregate basis for products liability, collapse, vibration, subsidence, removal and weakening of supports and sudden and accidental pollution.
- [Ballinode_Community_Centre_FTS-5-v2.5.docx] removal and weakening of supports and sudden and accidental pollution.
- Persons under a contract of service or apprenticeship with the insured Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
- [Ballinode_Community_Centre_FTS-5-v2.5.docx] Property of the insured or in the insured’s custody or control other than existing premises and their contents temporarily occupied for the purposes of the Works
- The Employer have the risk of loss of and damage to its existing facilities and parts of the Works it uses or occupies, in accordance with sub-clause 3.8.
- K Delay Events, Compensation Events, Programme Contingency, Delay Costs, Adjustments
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,000 for any one event, but this limit may be
- Minimum indemnity limit for Employers’ liability insurance: €13,000,000 for any one event
- Maximum excess for Public liability: €10,000 in removal and weakening of supports an
- Maximum excess for Public liability: €10,000 in respect of property damage only
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Quality | not stated | Methodology / implementation detail not stated in extract | not stated |
| Price | not stated | Pricing basis not stated in extract | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — not specified in extract.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — not specified in extract.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- You are invited to submit a Tender for the above Contract complying with the enclosed Instructions to Tenderers.
- We have examined and understand the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer, the Works Requirements, the Pricing Document, all as amended by any supplemental information, for the above contract.
- We submit with this Tender the completed Pricing Document and Schedule which form part of this Tender.
- and any rates in the Pricing Document.
- [Ballinode_Community_Centre_FTS-5-v2.5.docx] rates in the Pricing Document.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2023-08-18T15:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2023-08-18T15:00:00+00:00 |
| Date surfaced in documents | 7 January 2022 |
| Date surfaced in documents | March 2021 |
| Date surfaced in documents | August 2021 |
8. Contract terms that matter
Contract duration in the extract: 15 years. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 0
- Batteries shall be guaranteed for a minimum of 3 years
- mild steel pipework manufactured to the requirements of IS EN 10255: 2004 with
- rigerant pipework shall be in half hard copper (Class X) to BS EN 12449 and utilise
- (b) expiry of at least 21 days written notice to terminate this Tender
- Terms used in this Tender that are defined in those documents have the same meaning in this Tender.
- We offer to complete the Works on the terms of and in conformity with the documents referred to in the preceding paragraph for the lump sum of
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — not clearly specified in extract.
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Invitation to Tender.docx, Ballinode_Community_Centre_FTS-5-v2.5.docx, Ballinode_Community_Centre_ITT.docx.
- eTenders CFT / notice reference: not specified in extract.
- Clarification contact / portal: [email protected].
- Key attachments to prioritise: schedules, Schedule, Schedule for Public Works Contract for Building Works Designed by the Employer.
Can you bid?
Required certifications
- BS 5969
Public liability insurance
€6,500,000
Named standards / methodologies
Lots (1)
Construction of a new community centre with sports hall, office spaces, meeting rooms, commercial kitchen, and ancillary facilities.
Documents (55)
Electrical Specification ballinode community centre.pdf
476.4 KB · Specification
Mech Spec Part 1 - Project Particulars.pdf
161.6 KB · Specification
Mech Spec Part 2 - General Responsibilities.pdf
310.7 KB · Specification
Mech Spec Part 4 - Equipment Schedules.pdf
690.9 KB · Specification
Site-Electrical 6001.pdf
339.6 KB · Specification
Ballinode_Community_Centre_FTS-5-v2.5.docx
89.6 KB · RFT / Invitation to Tender
Ballinode_Community_Centre_ITT.docx
104.0 KB · RFT / Invitation to Tender
Invitation to Tender.docx
17.5 KB · RFT / Invitation to Tender
1.1_Volume_C_Pricing_Schedule_Tender_Release.pdf
1.3 MB · Pricing / BOQ / Schedule of Rates
Mech Pricing Document.pdf
105.7 KB · Pricing / BOQ / Schedule of Rates
Pricing Document-Ballinode community centre.pdf
104.9 KB · Pricing / BOQ / Schedule of Rates
DAC Main Report 2023.pdf
754.3 KB · Form / Declaration / Certificate
FSC Full Report 2023 rev 3.pdf
540.1 KB · Form / Declaration / Certificate
1701-DAC002 - Proposed Site Layout.pdf
966.2 KB · Drawing / Plan / Layout
1701-DAC100 - Proposed Floorplan.pdf
288.7 KB · Drawing / Plan / Layout
1701-DAC101 - Visibility Requirements Sanitary Facilities.pdf
260.4 KB · Drawing / Plan / Layout
1701-DAC200 - Proposed Elevations.pdf
1.7 MB · Drawing / Plan / Layout
1701.ASA.M3.AR - Sheet - FSC100 - Proposed Floorplan & Sections.pdf
617.4 KB · Drawing / Plan / Layout
1701.ASA.M3.AR - Sheet - FSC200 - Proposed Elevations.pdf
366.5 KB · Drawing / Plan / Layout
DAC GFP.pdf
250.3 KB · Drawing / Plan / Layout
DAC Site Layout.pdf
516.5 KB · Drawing / Plan / Layout
Electrical-CONTAINMENT-6101.pdf
352.8 KB · Drawing / Plan / Layout
Electrical-FIRE-6701.pdf
377.7 KB · Drawing / Plan / Layout
Electrical-LIGHTING-6301.pdf
379.9 KB · Drawing / Plan / Layout
Electrical-LIGHTNING PROTECTION-6801.pdf
316.2 KB · Drawing / Plan / Layout
Electrical-POWER-6201.pdf
411.8 KB · Drawing / Plan / Layout
Electrical-SECURITY-6501.pdf
333.4 KB · Drawing / Plan / Layout
Fire Cert Site Layout-Layout1.pdf
516.5 KB · Drawing / Plan / Layout
Mechanical-5201 - DRAINAGE.pdf
324.7 KB · Drawing / Plan / Layout
Mechanical-5301 - Plumbing.pdf
357.9 KB · Drawing / Plan / Layout
Mechanical-5601 - Heating.pdf
435.0 KB · Drawing / Plan / Layout
Mechanical-5701 - VENTILATION.pdf
355.8 KB · Drawing / Plan / Layout
Site-Mechanical - 5001.pdf
294.1 KB · Drawing / Plan / Layout
1701.ASA.M3.AR - Sheet - 1701-C03 - PROPOSED FLOORPLANS.pdf
582.4 KB
1701.ASA.M3.AR - Sheet - 1701-C04 - PROPOSED ELEVATIONS.pdf
1.0 MB
1701.ASA.M3.AR - Sheet - 1701-C05 - PROPOSED SECTIONS.pdf
1.8 MB
1701.ASA.M3.AR - Sheet - 1701-C06 - TYPICAL DETAILS.pdf
817.6 KB
1701.ASA.M3.AR - Sheet - 1701-C07 - TYPICAL DETAILS.pdf
508.6 KB
1701.ASA.M3.AR - Sheet - 1701-C08 - DOOR & WINDOW SCHEDULE.pdf
151.2 KB
1701.ASA.M3.AR - Sheet - 1701-C09 - IRONMONGERY SCHEDULE.pdf
501.8 KB
Ballinode_Community_Centre_Invitation_to_Tender.dot
30.5 KB
Mech Spec Part 3 - Standard Clauses.pdf
1.1 MB
QW2 Appendix A.doc
56.5 KB
QW2 Appendix A1.docx
24.1 KB · Appendix / Annex
QW2_Appendix C1.doc
65.5 KB
QW2_Appendix_B1.doc
85.5 KB
QW2_Appendix_B2.doc
63.5 KB
QW2_Appendix_C3.doc
62.5 KB
QW2_Appendix_C4.doc
63.5 KB
QW2_Appendix_D.doc
52.0 KB
QW2_Appendix_E.doc
61.0 KB
QW2_Appendix_F.doc
59.0 KB
QW2_Appendix_G.doc
50.5 KB
QW2_Appendix_H.doc
52.0 KB
QW2_Appendix_I.doc
49.5 KB
Original notice text
This tender involves the implementation and sustained service execution for the Ballinode Community Centre, including building, integrating, and operating specified service stacks with compliance reporting.
AI analysis updated 4 months, 1 week ago
Deadline
18 Aug
Location
Ireland
Procedure
Open
Clarification
31 Jul 2023
eTenders ID
2071125